Project: SteveBRV-14   -  
            Listing for Category : wings
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Steven Bryk   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:378.35
Total Flight Time:
Total Expense:$5870.00
Start/Last Date:Sep 16, 2023 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=SteveBRV-14

Home or Last Project Picture

Feb 17, 2024     Left Fuel Tank - (8 hours) Category: Wings
Building left fuel tank. Proseal is nasty stuff
 
Feb 16, 2024     Installing Small wing stiffeners - (8 hours) Category: Wings
Installed wing stiffeners into both left and right tanks with pro-seal. This is some messy stuff.
 
Dec 17, 2023     Prep right wing rear spar - (4 hours) Category: Wings
RIGHT WIng Section 15-03. match drill all hols in prep for Rivets
 
Dec 16, 2023     Right Wing Rivet Ribs to Spar 14-08 - (4 hours) Category: Wings
Place bolts and rivet wings to Spar in right wing Section 14-08 . Bucker was Dean Howard
 
Dec 02, 2023     Prep rear spar and doublers 15-03 - (7 hours) Category: Wings
Prep, rear spar after alodine mount and rivet all doublers and aileron Hindge. Section 15-03 and countersinc 15-04 LEFT WING at this time
 
Nov 26, 2023     Rivet Ribs to left Wing - (6 hours) Category: Wings
Section14-07. LEFT WING
 
Nov 25, 2023     Add Rib Bracket and torque tube to left wing - (2 hours) Category: Wings
Connect inboard and outboard wing flap brackets and torque tubes section 14-06
 
Nov 18, 2023     WIng Bushings 14-04 and 14-05 - (3 hours) Category: Wings
Up drill all bushing holes per 14-04 1nd 14-05 both wings. Put bushings in holes. ADD additional boles for Pitot tube and AOA.
 
Nov 13, 2023     Section 14-02 1n14-03 Torque Tube Assembly and Flap hinge - (6 hours) Category: Wings
Section 14-02 1n14-03 Torque Tube Assembly and Flap hinge. Preped, sent to alodine, and then built both torque tube assemblies and inboard flap hinge assemblies
 
Nov 04, 2023     Completion of Spars 14-04 and 14-05 - (5 hours) Category: Wings
Both spars completed Section 14-05 in left spar had to update how W-823-1 was connected. Nut plate was stripped. removed nut plat and used a nylock an-3 nut to lock it in place. Nut can be reached from turn buckle access plate under left wing SEE PHOTO . All other torqued to 22 inch pounds as desribed in section 05 torques.
 
Oct 22, 2023     Starting to assemble flap brakets /. Deburing - (2 hours) Category: Wings
 
Oct 21, 2023     Dubur some more - (2 hours) Category: Wings
 
Oct 18, 2023     Prep many wing part Alodine - (2 hours) Category: Wings
Prepping Wing part for Alodine $350 to date
 
Oct 17, 2023     Lights - (2 hours) Category: Wings
Assembled FlyLED Lights
 
Oct 14, 2023     deburing wing parts - (3 hours) Category: Wings
Assemble flap hinges deburing and smoothing in ready for alodine
 
Oct 10, 2023     Ribs 1 - (2.5 hours)       Category: Wings
Worked To flute straighten and debur ribs also dimpled section 14-02


 
Oct 10, 2023     Prepping Ribs - (4 hours)       Category: Wings
Prepping ribs, Align flange 90* , Drilling and Dimpling


 
Oct 03, 2023     Finish Spar 2 - (2 hours) Category: Wings
completed sections 13-04 1nd 13-05 on Right Spar. Same as Left Spar
 
Oct 02, 2023     more nutplates - (5 hours)       Category: Wings
Section 13-03.


 
Oct 01, 2023     Installing the nut plates on the Spar - (4 hours)       Category: Wings
Section 13-04 and 13-05


 
Sep 30, 2023     Second Spar Drilling - (4 hours)       Category: Wings
Worked to drill, deburr and countersink Spar 2 Right 13-03


 
Sep 29, 2023     finish spar 1 - (5.45 hours) Category: Wings
Spent all day Saturday working on prepping drilling and counTersinking side two spar 1 Section 13-03 and 13-04
 
Sep 22, 2023     primming multiple wing parts - (1.5 hours) Category: Wings
 
Sep 22, 2023     Continuing to countersink       Category: Wings
Lerning how to counTersink and fix mistakes 13-03


 
Sep 20, 2023     Starting to countersink - (2 hours)       Category: Wings
Section 13-03


 
Sep 19, 2023     Prepping of multiple parts for Primeing - (3 hours) Category: Wings
Had trouble getting plastic off multiple parts. Remove plastinc before doing anything on part Alodine
 
 
Sep 16, 2023     Section 15 1-5 Match drill J-Channel - (3.0 hours)       Category: Wings
Starting the wing match drilling J-Cahnnels


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.