Project: MattJ   -  
            Listing for Category : inspection
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Matt Jakus   -  
Project:   The Airplane Factory - Sling TSi   -   VIEW REPORTS
Total Hours:1190.7
Start/Last Date:Dec 01, 2019 - Jan 29, 2023
Engine:Rotax 915is
Panel:Garmin 3X
 
Friendly URL: https://eaabuilderslog.org?s=MattJ

Home or Last Project Picture

Jan 29, 2023     Weight and Balance - (4 hours)       Category: Inspection
An IA was nice enough to lend me top equipment to weigh the Sling. Nothing like having the right tools to make the job easy. Unusable fuel added, full oil, fire extinguisher,and documents on board.

The numbers..... 1157 empty weight, 937 pounds of useful load.


 
Dec 03, 2020     Quick Build Fixes - (6 hours)       Category: Inspection
The new build manual now comes with each page delineating what items should have been built as part of the QB and which items should be installed by the builder. I found some items missing from the Quick Build that the plans listed as installed.

This has prompted me to do a page by page review of the build and I found some more missing or incomplete items. Incomplete as in parts not installed or in one case a bracket clecoed but not bolted. Parts with some rivets missing.

Missing parts have been ordered such as the supports for the rear seat and baggage floor. Because of the completeness of some sections getting to these areas is going to be a challenge. Ex..I had to use locking forceps to hold small nuts tot get at least the first threads going.

I've spoken to some other builders of different kits and they say this is not at all unusual. The nice thing is the new TAF build manuals are going to make this task much easier.


 
Mar 23, 2020     Inventory - (40.5 hours)       Category: Inspection
I ordered the kit as a whole because there was a discount in so doing. There were quick build wings and fuselage. In addition, 5 crates of parts to complete the aircraft. Even though the aircraft is designed to be built in stages corresponding to the 5 boxes I decided to inventory all boxes. This way, I could order the missing or damaged parts at once. This took considerable effort and I much appreciate my brothers time in this effort spread over several days.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.