Project: MattJ   -  
            Listing for Category : workshop
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Matt Jakus   -  
Project:   The Airplane Factory - Sling TSi   -   VIEW REPORTS
Total Hours:1190.7
Start/Last Date:Dec 01, 2019 - Jan 29, 2023
Engine:Rotax 915is
Panel:Garmin 3X
 
Friendly URL: https://eaabuilderslog.org?s=MattJ

Home or Last Project Picture

Aug 23, 2020     More Moving - (4.5 hours)       Category: Workshop
August 23, 2020

Moved the fuselage today... another nerve-wracking trip along the Spanish Trail route (now a frontage road) to the airport hangar


August 19,2020

Moved the wings out of my buddies shop to the hangar.

9 miles to the airport on a frontage road that was part of the Old Spanish Trail. Nervous, but it made it.


 
Aug 05, 2020     Set up - (6.0 hours)       Category: Workshop
Lots to clean up and still setting up.

The hangar door piston seal needs to be replaced so it was removed and sent out for repair. Luckily , the hangar has a side garage door entrance to keep bringing in materials

Under the supervision of the 13 y.o hangar dog!


 
Jul 31, 2020     Time to Move - (9.0 hours)       Category: Workshop
8/2/2020

Still moving out of the old shop (My buddies 3 car garage). I negotiated for some of his work benches so I am more than flush with work spaces. I will organize as best I can before the big job of moving the wings and fuselage.

7/31/2020

I obtain Hangar space and will be moving this next week. The shop I have been using has been great but it is time to to have more room to maneuver!

Started packing parts and completed assemblies today. The final item to move will be the fuselage. Before moving I will attach the main landing gear using the shops hydraulic lift.. then off to the new hangar


 
Mar 10, 2020     Kit Arrives!! - (6.7 hours)       Category: Workshop
Unload the truck at the build shop. 4 souls total added up to 6.75 hours to get the 20 foot container unloaded and kit placed into the shop.

The container was securely packed for the trip. South Africa thru China thru Port LA rail to SLC then truck to Cedar City, UT.

Next entry. Inventory!


 
Sep 24, 2019     Wing Stand and Benches - (36 hours)       Category: Workshop
Built 4 benches and the wing stand per EAA diagrams last month. Purchase clecos and other tools.

My original quick build kit was supposed to be here now but now I am anticipating a December 2019 delivery.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.