EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
MattJ
-
Listing for Category : Engine
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (116)
Research
- (2)
Workshop
- (5)
Empennage
- (5)
Fuselage
- (16)
Firewall
- (4)
Tail Feathers
- (1)
Wings
- (7)
Controls
- (8)
Avionics
- (10)
Lighting
- (2)
Instrument Panel
- (1)
Landing Gear
- (7)
Engine
- (12)
Propeller
- (2)
Fuel System
- (6)
Interior Finish
- (11)
Paint / Decals
- (8)
Inspection
- (3)
Tools
- (2)
Cabin AIr
- (4)
Builder Name:
Matt Jakus
-
Project:
The Airplane Factory - Sling TSi
-
VIEW REPORTS
Total Hours:
1190.7
Start/Last Date:
Dec 01, 2019 - Jan 29, 2023
Engine:
Rotax 915is
Panel:
Garmin 3X
Friendly URL:
https://eaabuilderslog.org?s=MattJ
Home or Last Project Picture
May 09, 2021
Intercooler and Oil Lines
- (12 hours)
Category: Engine
Test fitted the intercooler and and mounted for radiator hoses, oil lines, and put the heat shield on the required hoses.
When the fuel lines are finally fitted the Fire sleeves will be installed
Positioning the Inter cooler
Inter cooler hoses trimmed to fit
Coolant Hose with heat sheild
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.