EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
MattJ
-
Listing for Category : Fuselage
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (116)
Research
- (2)
Workshop
- (5)
Empennage
- (5)
Fuselage
- (16)
Firewall
- (4)
Tail Feathers
- (1)
Wings
- (7)
Controls
- (8)
Avionics
- (10)
Lighting
- (2)
Instrument Panel
- (1)
Landing Gear
- (7)
Engine
- (12)
Propeller
- (2)
Fuel System
- (6)
Interior Finish
- (11)
Paint / Decals
- (8)
Inspection
- (3)
Tools
- (2)
Cabin AIr
- (4)
Builder Name:
Matt Jakus
-
Project:
The Airplane Factory - Sling TSi
-
VIEW REPORTS
Total Hours:
1190.7
Start/Last Date:
Dec 01, 2019 - Jan 29, 2023
Engine:
Rotax 915is
Panel:
Garmin 3X
Friendly URL:
https://eaabuilderslog.org?s=MattJ
Home or Last Project Picture
Aug 16, 2021
Vertical Stab Fairing
- (13 hours)
Category: Fuselage
Fitted the fairing for the vertical stab. As usual with the composite pieces, sanding, heating, shaping was the order of the day to make it fit.
20210720_133203.jpg
20210722_130445.jpg
20210727_095830.jpg
20210727_095856.jpg
20210727_095905.jpg
20210727_124754.jpg
20210727_151206.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.