Project:
WoodysSportsman
-
Listing for Category : systems
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (389)
Admin
- (1)
Rudder
Elevator
- (1)
Wings
- (55)
Fuselage
- (87)
Systems
- (105)
Tools
Workshop
Inspection
Finish
- (140)
Builder Name:
John Wood
-
Project:
Glasair - Sportsman 2+2
Total Hours:
873.4
Total Flight Time:
Total Expense:
N/A
Start/Last Date:
Nov 04, 2017 - No Finish Date
Engine:
Lycoming IO390 C3B6
Propeller:
Hartzell 80” Trailblazer
Panel:
Garmin G3X dual display/GTN650Xi/G5/GNC215
Friendly URL:
https://eaabuilderslog.org?s=WoodysSportsman
Home or Last Project Picture
Nov 22, 2023
Assemble front gear assy
- (1 hour)
Category: Systems
Press pins into fork
Install wear pad onto fork
Assemble fork onto leg
IMG_0553.jpeg
IMG_0554.jpeg
Nov 21, 2023
Installed bushing in gear fork
- (0.3 hour)
Category: Systems
IMG_1672.jpeg
IMG_1674.jpeg
Oct 21, 2023
Complete install of the valve and lines
- (2.5 hours)
Category: Systems
IMG_1557.jpeg
IMG_1556.jpeg
Oct 20, 2023
Fabricate new left, it was a little short when secured
- (1 hour)
Category: Systems
Oct 17, 2023
Fabricate Left Forward Fuel Line
- (2 hours)
Category: Systems
A bit easier than the right from a bending standpoint but figuring out the exit angle from the valve took some time
IMG_1555.jpeg
IMG_1550.jpeg
IMG_1551.jpeg
IMG_1554.jpeg
Oct 14, 2023
Fabricate Right Fwd Fuel Line
- (3 hours)
Category: Systems
Fabricated the right forward fuselage fuel line, lots of fitting and templating to get it right
IMG_1549.jpeg
IMG_1553.jpeg
IMG_1548.jpeg
IMG_1552.jpeg
Oct 08, 2023
Started building nose gear
- (2.5 hours)
Category: Systems
Installed bushing in the cage and main leg, basic assembly of the shock bushings
Found the bushings were not pressed into the nose fork. These are factory installed so not in the pick sheet.
Glasair is fabricating a new set and sending them
Oct 03, 2023
Epoxy nose gear wear pad
- (0.5 hour)
Category: Systems
Epoxied the wear pad to the wear plate.
Sep 30, 2023
Drilled extended gears, freed fuselage from the caddy
- (5 hours)
Category: Systems
Jigged extended gear, used 0 toe, will adjust with shims
Drilled extended gear, hard gear drilling is done!
Lowered the fuselage off the caddy, it served its use but very happy to have the fuselage on its mains
IMG_1492.jpeg
71780381976__6C615459-3C27-4B58-9F04-EC6F9D01D739.jpeg
71780383701__95E0D785-54FB-41A6-87C4-74BB55A6CEC4.jpeg
Sep 29, 2023
Started assembling nose wheel
- (2 hours)
Category: Systems
Started assembling nose wheel assembly
Packed nose gear bearings
IMG_1488.jpeg
IMG_1487.jpeg
Sep 28, 2023
Pack main wheel bearings and install Wheels
- (2.5 hours)
Category: Systems
Packed the main wheel bearings
Installed wheels
Drilled holes for cotter pins and installed
Installed brake calipers
IMG_1489.jpeg
IMG_1449.jpeg
IMG_1490.jpeg
IMG_1491.jpeg
IMG_1448.jpeg
Sep 27, 2023
Installed gear legs and brake flanges
- (3 hours)
Category: Systems
Final cleaning/debur and install of main gear legs
Up drilled and reamed brake flanges to 5/16
Debur all holes
Install caliper mounts to brake flanges and install flanges on gear legs
IMG_1461.jpeg
IMG_1460.jpeg
IMG_1459.jpeg
Sep 26, 2023
Drilled left brake flange
- (1 hour)
Category: Systems
Drilled the left brake flange to #10 sized hole
IMG_1452.jpeg
Sep 25, 2023
Drilled right brake flange
- (2 hours)
Category: Systems
Drilled the two mounting holes for the brake flange, on Sunday I created a template to mark the 90 degree lines for drilling and 7then degree rotation.
Started with #30, the up drilled to #10, waiting for bits to drill to 19/64, then ream to 5/16
IMG_1445.jpeg
IMG_1446.jpeg
IMG_1447.jpeg
IMG_1444.jpeg
Sep 23, 2023
Drilled main gear leg fuselage attach
- (2.5 hours)
Category: Systems
Drilled the attach bolts, right side went smooth, left was a bear but they are drilled and reamed to 5/16”
IMG_1440.jpeg
IMG_1441.jpeg
71718998509__0DA6FDED-264D-4FCC-A2A3-3FCDC49D3A3B.jpeg
71719012325__99E86E2F-148F-4C00-83E6-61849D850C22.jpeg
Sep 21, 2023
Started jigging aft main gear legs
- (1 hour)
Category: Systems
Got 8' aluminum angle, started jigging the aft main gear
71703110315__921AE2C6-CBBE-4FD3-A3DF-F26F3F2107F0.jpeg
IMG_1439.jpeg
Sep 09, 2023
Started assembly of wheels and brakes
- (1 hour)
Category: Systems
Installed tubes and tires on wheels, discovered that the weldments for the brake calipers are missing.
Sep 03, 2023
Complete fitting gear legs
- (1.5 hours)
Category: Systems
Completed the fitting, all gear legs are in flush. Ready to set toe and drill
Sep 02, 2023
Fit main gear legs
- (4 hours)
Category: Systems
Starting fitting the gear legs, left side went in very well. Trouble fitting the rights
Jul 05, 2023
Start gear install
- (4 hours)
Category: Systems
Raised the fuselage onto the table.
Drilled 4 holes to 1.5” for main gear legs.
IMG_1011.jpeg
IMG_1012.jpeg
IMG_1013.jpeg
IMG_1014.jpeg
IMG_1015.jpeg
Jan 15, 2023
Complete Wiring Left Wing Wiring
- (2 hours)
Category: Systems
Completed the wiring of the left wing
Replaced the connectors for the pitot tube and the aux pump
2C6C3F54-5D4B-48EE-8C5A-54589342B3F3.jpeg
9F91B190-E6B2-4DF4-AE7B-612CB581FFD0.jpeg
6AB2CDB1-1A08-4946-9FD1-F51FA0FEE787.jpeg
Jan 14, 2023
Complete Left XFER Pump Wire
- (1.5 hours)
Category: Systems
Completed updated fuel pump connector setup, rerouted pump power and ground.
Installed 2 PN Molex.
7EFAD0B7-6268-47E2-B5A8-B2B8AAEE3916.jpeg
9DB38F86-C1FA-48FA-984B-FC14BEF689D1.jpeg
Jan 06, 2023
Continue aileron trim installation
- (1.5 hours)
Category: Systems
Terminated the new roll trim servo with connector and RTV to body of servo
Terminate the servo end of the aileron cable
3C179585-E63C-40D5-9C64-CA4E94E24120.jpeg
660C0928-FAD1-4670-92F3-2B281BCE788E.jpeg
Jan 04, 2023
Continue Trim Wiring
Category: Systems
Came up with a better plan for mounting the connector for the trim,
Terminated the wing connector and RTV/tie in place
Also came up with a new way to terminate the fuel pump
CEC01A61-605E-453A-B8E9-39E946142DCA.jpeg
F80B9523-2AEC-455D-92BB-DAA7F2CD4747.jpeg
10E822C5-F677-49AB-80C6-8137571BBC52.jpeg
1B16344F-5892-4AF1-BC42-2E24B97427A0.jpeg
Jan 03, 2023
Start wiring the aileron trim
- (2 hours)
Category: Systems
Received the parts to do the trim wiring, did not like the way the connector was wired so will continue to tomorrow
Dec 29, 2022
Secure fasteners on right wing
- (1 hour)
Category: Systems
Secured all fasteners in the right wing, extended bolts on the flap bell crank and aileron pulley
4C5973DD-2481-4246-9AF9-885E814E8990.jpeg
D825BFFC-F406-4C44-B695-6199DC3CBD50.jpeg
Dec 28, 2022
Finish securing right wing wiring
- (0.5 hour)
Category: Systems
5E50225B-352B-4F02-AF66-1B840169E1A0.jpeg
A63B3E51-59CE-4DE0-B59F-7864960788BC.jpeg
Dec 27, 2022
Completed pitot plumbing, rivet pitot doubler
- (5 hours)
Category: Systems
Completed installation of pitot supports, riveted the pitot stiffeners and installed hardware
Prepped and primed left outboard top skin
Riveted spar doubler end piece
Torque all hardware, inspect all cotton pins
E10250CB-2126-497B-BA2E-3CF4496A7CFC.jpeg
4385A8F1-E346-43B1-87A1-987DBCCEC0F5.jpeg
FC33D9F6-1133-4165-9D88-59C63A31F988.jpeg
326AA830-4ABD-4FBF-8678-022F98A1824A.jpeg
9C3BC202-F7E5-49D1-992F-D1DF34FBDD5F.jpeg
67EFF7D7-8B6C-4C4F-9E62-01710F21A446.jpeg
Dec 26, 2022
Continue priming, check all spar countersinks
- (4 hours)
Category: Systems
Finished countersinking left and right wing spar countersinks, test fit all skins
Continue priming the stiffeners
1741CA5F-E7CC-4D7E-9C44-BA6AA0490E51.jpeg
E719E278-1EA0-47B0-8F60-2D76ADE7A1BE.jpeg
Dec 23, 2022
Prime Stiffeners, Right Wing Wiring (cont)
- (4 hours)
Category: Systems
Prepped and primed top long stiffeners
Terminated fuel pump and aux tank wires
B1D62FF2-7704-4A11-A2E7-012FBC8E5B70.jpeg
A252E034-5F2E-4FF0-ABA9-00AB734770AB.jpeg
802763EF-3535-4416-BB02-0DFB59CF56D8.jpeg
6B361E3A-6F28-4376-8C10-C0F7F6F4AE7B.jpeg
911B8FF7-B720-46F8-821A-D801AD67B55A.jpeg
Dec 18, 2022
Install OAT Sensor, RTV wires
- (3 hours)
Category: Systems
Installed the OAT sensor and started RTV of the right wing cables
DE92D124-CFF6-4EDC-8D9F-38D505BCDABC.jpeg
B3E9BC93-9CB0-4D2C-9F20-C9A76097DEF3.jpeg
FD448AE5-DBED-43A6-B963-01013602805B.jpeg
73B1B13D-434F-4247-91CF-9522895103B8.jpeg
378D0D40-9F79-484E-A2E6-39B53F48AE40.jpeg
Dec 15, 2022
Complete mounting of regulator ( not riveted )
- (1.1 hours)
Category: Systems
Also continued with right wing wiring
FFB23A98-0212-4D19-BEAD-5C229A864E41.jpeg
Dec 14, 2022
Paint regulator bracket / mount connectors
- (1 hour)
Category: Systems
DAEB06EF-F9B3-44A4-AE82-499875E7E229.jpeg
81520685-EA4E-4D31-8A5E-EA35A6026E58.jpeg
Dec 12, 2022
Add trim wires to main right wing harness
- (1.2 hours)
Category: Systems
AAD3DBE2-8CA8-4FC5-B267-C54A0AAA827E.jpeg
Dec 11, 2022
Continue left/right wing laydown
- (3 hours)
Category: Systems
Installed connectors on brackets, riveted the end piece for the hole with insufficient edge margin. Stood up the left wing and completed the RTV on the left main fuel wire
D0A52DED-F996-4DF8-810C-69572A0AEA78.jpeg
Dec 10, 2022
Continue Left Wing Laydown
- (5 hours)
Category: Systems
Continued with the left wing wiring and prep. Primed all brackets and route the vent lines per the plans, RTV the vent lines and outboard wiring through the spar.
Also prepped the bracket for the right wing, and crimped inboard end of the NAV antenna coax
C25FED37-FCFD-4F5E-9A3C-706A5C971B93.jpeg
Dec 04, 2022
Continue the Left Harness Install
- (4 hours)
Category: Systems
Just about completed the left harness install, all wires routed, still need to secure the main tank fuel QTY, removed tanks and secured wires run outboard, terminated the aux tank lug
Dec 03, 2022
Wing Wire - Complete right base harness, start installing left harness
- (6 hours)
Category: Systems
Got the materials from Stein Air, completed the based harness for the right wing, Started installing the left wing harness, fabricated bracket for CPC connector, connected aux pump with spade connector, started using spade connectors for the heater to connector hook up but switched this to a 4 CPC, much cleaner and easier to service, going to change the pitot connection to a CPC as well.
805F519F-0E8E-4659-A2C6-740DDD1DA3B8.jpeg
740C3C50-6151-4FB1-A0D2-549E05CB1C8E.jpeg
699B82E2-F967-4ABC-A84F-425FA47D38E3.jpeg
C86F6E79-B2E4-49E0-9774-EA262975566E.jpeg
Nov 27, 2022
Wire Wing, Fabricate left / right harness
- (4.5 hours)
Category: Systems
Started fabricating the main harness for the left and right wing, on left wired up all but the aux tank
On the right, still need to add the ground for nav light, ran out of materials
Nov 16, 2022
Completed riveting inspection doubler anchors
- (1.3 hours)
Category: Systems
Nov 15, 2022
Rivet left wing doublers
- (1 hour)
Category: Systems
628D1530-0DF0-4743-B79E-D6D8AF756780.jpeg
C2A26AEE-630C-48CA-9905-1C0B8495A5E1.jpeg
1B3CF130-FEFC-46D8-8600-DB91BFFFEE38.jpeg
Nov 12, 2022
Prep and prime inspection doublers
- (3 hours)
Category: Systems
Sep 27, 2022
Drill and prep RAMI comm antennas
- (3 hours)
Category: Systems
Drilled holes and mounting prep for RAMI antennas
4EDC9457-3A9A-410E-B787-BDFB45D22E0E.jpeg
8419CD75-EE9D-450E-BE62-8C54FD906721.jpeg
65E136AD-13A0-4848-9FC0-4B5C287723A4.jpeg
D11FBCC4-7330-4EAA-8F9A-112F0DAA7775.jpeg
Sep 25, 2022
Trim and flare pitot tube
- (3 hours)
Category: Systems
073B4FB7-B194-4C61-ABEB-D7192F85814E.jpeg
DE15BB30-680D-4CBD-8E68-5D0384CC9760.jpeg
76CDD164-DD72-485C-997B-0D5BEDB601BD.jpeg
5C3EA67A-C941-46A9-9E1B-7D0C96DDD617.jpeg
Sep 18, 2022
Trial fit wings and clear cable interference
- (4 hours)
Category: Systems
Installed wings with Chris, Tom and Ryan. Cleared Aileron crossover interference by sanding burr on crossover guide
Sep 10, 2022
Start pitot tube installation
- (2 hours)
Category: Systems
Start drilling doubler for pitot tube
71AFA70C-5BD5-498A-8215-DE7B513B6A89.jpeg
8E2C7B72-C780-4260-B44F-D214D7E143DA.jpeg
Sep 09, 2022
Complete right fuel plumbing
- (3 hours)
Category: Systems
Completed routing the fuel system plumbing in the right wing
A5E9A42C-8419-40CB-B0DB-49A9A309C216.jpeg
451ACD2E-BE28-45BB-9560-0ECEE217BA71.jpeg
2AD1AC3C-5161-4268-B2EB-4F7DB3BECCB2.jpeg
May 07, 2022
Put wings back in jigs for upgrade
- (2 hours)
Category: Systems
Removed the wings and put them back in the jigs, started removing rivets for the upgrade
9E564058-FFC4-4819-82F2-928784E3E573.jpeg
55B2D9C3-6EB7-4ED0-AC62-494FBFC01D56.jpeg
A7BF3A35-AEC8-4A61-A809-583285619907.jpeg
Apr 30, 2022
Complete prep for wing removal
- (9 hours)
Category: Systems
Completed drilling holes for cable guides and installed cable guards on aileron wing pulleys.
Setup outboard jig supports for wing finishing.
Removed control surfaces and disconnected wing flight controls. Ready to remove wings.
Apr 28, 2022
Prime new pulley guards
- (1 hour)
Category: Systems
Primed better fitting pulley guards for ailerons in wings
Apr 20, 2022
Paint remaining cable guards
- (1 hour)
Category: Systems
Painted the cable guards for the aileron pulley blocks
Apr 15, 2022
Completed flap and aileron cable routing
- (10 hours)
Category: Systems
Routed and crimped all flap and aileron cables, secured all permanent nuts with cotter pins less those required to be disassembled, specifically overhead pulley groups.
Need to redo flap and aileron clevis at crimps to add washers.
ADC704A5-41CD-4B64-A82C-C186E583A5AD.jpeg
20ACCDEE-F334-4838-A270-61D771031567.jpeg
9D5436A5-FA32-48A4-A38D-92D1A32CFB63.jpeg
40B03B4A-E7AE-4AD0-8208-BEBB6F97A2D3.jpeg
9DD8A9D7-20F2-46EF-875D-E2580BC5D4F7.jpeg
45EF10A1-8CE4-4260-B3DE-C720C61C015C.jpeg
101696FD-5CE6-4334-AF07-5529C2549C59.jpeg
C95A3A4A-D1FC-4659-AEAD-6C353CD2D45A.jpeg
Apr 10, 2022
Fabricate fuel lines
- (1.5 hours)
Category: Systems
Fabricate copilot side fuel feed line from T.
Swage pilot and copilot T and aft mid fittings
F6640739-FFA5-4C63-9F92-67FEBFE68A4A.jpeg
Apr 09, 2022
Fabricate fuel lines in fuselage
- (4 hours)
Category: Systems
Fabricated two header fuel lines, installed and swaged fittings for both. Installed T fittings
Fabricate pilot side fuel feed from T to mid fuselage
0E084CDE-2B00-450B-85D0-EDFEB12915E5.jpeg
1AE99B75-CDA2-4AE0-A0EE-157F2F73FAEC.jpeg
55C136D4-B4B2-4B67-9242-34B85F2DD75B.jpeg
Apr 08, 2022
Install cable guide, seal fuel drain holes
- (1 hour)
Category: Systems
Installed the center cable guide
Mixed up new resin and sealed foam for fuselage drain holes
Apr 05, 2022
Installed header tanks, drill holes for fuel drains
- (0.8 hour)
Category: Systems
Installed header tanks, drilled new bottom hole.
Drilled holes for fuel drains on fuselage floor.
81E499CB-897F-49A2-B227-E1A6F5ED66FC.jpeg
BDCDBCD5-1387-457C-A49F-79BAD58516F3.jpeg
8AEF89FA-B4EA-49C7-AAF9-47B49F345580.jpeg
9C9973D3-63F7-4704-96A4-1121B07C986E.jpeg
D9C1CD27-2CB2-445F-A846-E316B40D9760.jpeg
271ED520-DF77-43C3-BFE3-178B8990BEF0.jpeg
Apr 04, 2022
Start fuselage fuel system plumbing
- (.5 hour)
Category: Systems
Assembled drain Ts and adapters. Started fitting header tanks, holes didn't line up.
1D2C2FB1-8339-40B6-8DD8-D6744D68D81C.jpeg
01FED6A4-192F-4E30-81A5-54DC7CB58953.jpeg
6A4909B7-6EFB-46E8-9AA8-CE501C8F117A.jpeg
Apr 03, 2022
Fabricate cable guards and flap primary cable routing
- (1 hour)
Category: Systems
Fabricated the cable guards for the aileron pulleys
Routed the primary flab cables, not yet terminated
Apr 02, 2022
Control Systems Rigging
- (10 hours)
Category: Systems
Completed the rudder and elevator rigging, installed horizontal stabilizer and elevator. Crimped rudder and elevator cables.
Cut crossover holes at wing roots.
Routed final flap deployment and retract cables.
Routed and clamped aileron cables.
Trimmed firewall template.
48419482-F51A-468E-A9F6-8BE0C71A875E.jpeg
IMG_9034.mov
IMG_9035.mov
Apr 01, 2022
Route aileron primary cables
- (1.3 hours)
Category: Systems
Route aileron primary cables securing all cotter pins.
Install flap handle tab, secured with cotter pin.
48E25389-2E8E-4789-AF6C-EDD69A4BF5D5.jpeg
C2025BB2-59CD-4B36-82C1-6BFF70067DA1.jpeg
44F45421-802E-4D19-B2D7-C67967305F15.jpeg
Mar 30, 2022
Fabricate flap attach tab
- (1.0 hour)
Category: Systems
Fabricate the flap handle control attach tab, photo shows painted tab
A9C233FE-B6DE-409C-BF36-C5FD19BCA296.jpeg
Mar 29, 2022
Continue rudder and elevator rigging
- (0.8 hour)
Category: Systems
Terminated the empennage wires, including heat shrink and cable ends, temporarily installed clamps, will adjust after empennage is locked down
E816EFF2-5492-496E-A0C0-37E9A246BC46.jpeg
1CA8C8B0-166F-4F45-B32F-A56ED5142CE8.jpeg
F7A4940D-726C-4BDF-A314-894BFC051F7E.jpeg
200B5B3A-A1AC-45D2-9D6E-DE8DAA4A8C81.jpeg
4062AB0C-57B4-41B3-8489-93F34061A683.jpeg
Mar 28, 2022
Trim wing cable guide ends
- (0.2 hour)
Category: Systems
Trimmed the inboard aileron and flap wing cable guide ends. Verified the 18” measurement on the aileron control rod
Mar 27, 2022
Install Flaps, Ailerons, and Rudder
- (4 hours)
Category: Systems
Removed elevator bellcrank to install elevator stops. Reinstalled bellcrank. Installed rudder and routed elevator and rudder empennage cables forward.
Installed flaps and ailerons, trimmed fuselage for wing fold with flaps.
3E0AB4D9-4F75-4F3C-AA5F-458A8340AEA5.jpeg
A9B0B0F4-75F6-49F0-B86E-F321B1E83EB7.jpeg
B37930E9-414F-4883-B541-F0400C440BF3.jpeg
8927DDE9-F32B-487D-8064-546469856C23.jpeg
129670DA-1CFF-477C-BADE-30EC10567C73.jpeg
A1227AAA-6023-481B-99B4-E7CA34A3EB7D.jpeg
D525B77F-7EBF-4525-AA6C-D7C80EF6D895.jpeg
Mar 25, 2022
Install rudder and elevator primary cables
- (1.5 hours)
Category: Systems
Installed hardware and primary and forward elevator cables
407C4B31-30A3-47D5-9D8B-12AE64755F06.jpeg
BA698663-A3E7-433B-9B40-1C187EA94CAC.jpeg
E6597BB8-4484-4CB2-BDB8-B0F650737081.jpeg
Mar 24, 2022
Start rigging rudder
- (0.2 hour)
Category: Systems
Drilled out cable guides and installed rudder control springs
70F35519-11CA-4150-B70E-34750E826896.jpeg
Mar 19, 2022
Complete wing fold clearance and pin alignment
- (4.5 hours)
Category: Systems
Ground fuselage material away where it was interfering with the wing on the wing fold.
Using valve grinding compound adjusted the fit of the forward wing pins, the right was significantly worse than the left. Both are good now.
Feb 26, 2022
Install nutplates for wing fold braces
- (2 hours)
Category: Systems
Drill #10 holes and drilled and countersunk holes for rivets, rivet nutplates
Assisted by Ryan Powers
Sep 25, 2021
Mount the wings!
- (6.5 hours)
Category: Systems
Mounted wings to the fuselage with the crew. Larry and Brian Gray, Ryan Powers, Dave Cardin, and Tom Chase
2FB8E35B-D6CC-4CB1-9B58-CFB923975820.jpeg
AB186353-CD11-49CA-BCC4-3B29C7EC1639.jpeg
5B731D3C-66AD-4C6B-BE84-6EFDE000A671.jpeg
70EB3066-7195-4F08-8D83-23BFDBE37BF6.jpeg
8E6E29D1-72D6-4EF3-B2B3-CEF3C27BFB29.jpeg
Sep 18, 2021
Trim struts
- (3 hours)
Category: Systems
Jul 11, 2021
Install remaining fuselage pulleys
- (0.7 hour)
Category: Systems
Completed installation of the center pulley block, less the cotter pins which will go in after cable installation
Completed installation of the aileron pulleys, need to set cable guards and install cotter pins
0FC4570E-45AB-48B0-9118-94A9A6BAA48F.jpeg
BE55EE79-601D-4990-8AC3-207C78D134B5.jpeg
DB3516E0-AEC8-4394-B912-A10D2FF00705.jpeg
C8D4C35A-EDE0-490C-A793-A5E02EBA6B79.jpeg
3EDA9467-54AE-4436-A91E-5F3AED6020ED.jpeg
BCD39614-3E03-4FE6-AD7B-0CD641EA1DFA.jpeg
Jul 10, 2021
Painted new parts for the center pulley block
- (0.5 hour)
Category: Systems
Painted the new parts
Jul 09, 2021
Drill hole for Bulkhead a pulley cluster
- (0.7 hour)
Category: Systems
Drilled new hole and completed assembly of the copilot side pulley block
Jul 08, 2021
Match drilled center pulley cluster guards, layup A pulley Block
- (1.5 hours)
Category: Systems
Match drilled the center pulley cluster guards to the center bar
Small layup to cover original hole for copilot side bulkhead A pulley block
Test bent double pulley guard, much better than Glasair parts
Jul 06, 2021
Install strut attach fitting bushings
- (0.5 hour)
Category: Systems
Installed the strut attach bushings in all of the strut attach pieces. A total of 16 bushings 2 NAS08-075-16 bushings in each of the lower fittings. Two NAS08-075-18 on each of the upper wing attach fittings and two of the NA08-075-16 in each of the upper strut attach forks
850D47CB-1384-447C-BD86-FAB8EED82846.jpeg
8EF87A1A-D64D-4600-B0F1-8C1E745813D7.jpeg
Jun 30, 2021
Installed rudder pedals and master cylinders
- (2 hours)
Category: Systems
Installed the rudder pedals and master cylinders, washers installed to set spacing all cotter pins installed, needs to have lock nuts tightened after final pedal adjustment
F34409A4-2E74-4D90-B78F-38AF43D7BDAE.jpeg
Jun 29, 2021
Assemble and install bulkhead A cable guides
- (1 hour)
Category: Systems
Assembled the cable guides and installed on bulkhead A
23F06C37-5C13-459E-9E26-EA0C7747CC8D.jpeg
CC6B6F58-5604-416F-9FDB-2EDBBDE0CAC7.jpeg
4D285CFA-AC4D-4151-B17F-2E798595E232.jpeg
Jun 28, 2021
Touch up paint on bulkhead A pulley guides
- (0.5 hour)
Category: Systems
Jun 27, 2021
Finish opening bulkhead A cable guides
- (0.5 hour)
Category: Systems
Sanded to final opening size
Jun 26, 2021
Continue opening cable guides bulkhead A
- (0.5 hour)
Category: Systems
Jun 25, 2021
Open up bulkhead A cable guides
- (0.5 hour)
Category: Systems
After assembling the cable guides, looks like some additional side to side spacing would be usefule
21FF1B8A-C8BE-4E17-BAE7-EA282964F819.jpeg
Jun 03, 2021
Install autopilot tray, assemble rudder pedals with brackets
- (0.7 hour)
Category: Systems
Installed the servo mounts to tray and install in fuselage
Assemble the rudder brackets on the rudder pedals
BB36A9D8-169F-4008-BB0F-A85A5F77ABAD.jpeg
92A2544A-2F88-498B-9FA1-889E1C348F01.jpeg
Jun 01, 2021
Black top coats on rudder pedals and autopilot tray
- (1 hour)
Category: Systems
Sprayed the black topcoat on internal parts
May 31, 2021
Touch up and reapplication of primer with icubated paint
- (3 hours)
Category: Systems
Re finished all tail parts for better surface
A43E8F8C-C6E2-4DBB-A1F6-77C007B0BF6B.jpeg
8E971C0E-F10F-4006-B484-669FF3804A88.jpeg
B4B427CC-9208-40B4-8E1D-5F6117215A12.jpeg
May 30, 2021
Prime System and tail components
- (4 hours)
Category: Systems
Initial primer application with new paint system, note that discovered the primer needs to incubate to have proper surface
6BE99F8D-E5DC-4679-A8EC-9C2DF1E920D6.jpeg
87E07E8E-FAD1-49AC-81C9-892AD0563C6F.jpeg
May 29, 2021
Alodine system and fuselage components
- (3 hours)
Category: Systems
Alodine all system and fuselage components
BF3A3769-4B1F-480D-86CA-1EB43DFD328C.jpeg
AD7D23EA-6DAB-4BE3-AEFF-3F8079CD3E2E.jpeg
9D3D6C1A-80BA-4420-90C1-9E317FF6FE42.jpeg
F6D61701-84DE-4456-9241-5063C34F149E.jpeg
67351864-0074-4C97-8FA6-65C203753CE2.jpeg
May 25, 2021
Compete sanding and filling of the rudder pedals
- (1 hour)
Category: Systems
Fillled unused holes for in the rudder pedals for painting
May 24, 2021
Prep rudder pedals
- (1 hour)
Category: Systems
Disassemble the rudder pedals for preparation
May 23, 2021
Prep work and assembly of pulley guards
- (4.5 hours)
Category: Systems
Completed assembly of the center pulley guards but found out these are not built properly per the latest drawings. Also tried to build the pulley guards for the aileron pulleys
May 21, 2021
Complete fabrication of bulkhead A pulley blocks, fairlead installation
- (2 hours)
Category: Systems
Completed the fabrication of the second bulkhead A pulley block
Completed installing the fairleads
217417E5-8155-40FF-ADBA-6B8DAFF81F3A.jpeg
A00A2A93-6521-48B6-B16D-5C2649EC3061.jpeg
65C7C308-F5C2-4971-A4D2-22DF6B32DB23.jpeg
May 20, 2021
Continue bulkhead A pulley block fabrication
- (1.5 hours)
Category: Systems
Completed fabricating 1 of 2 of the bulkhead A pulley block bracket sets. Made a template for cutting to shape and then drilled the holes. Drilled bottom for corners for the cable slots, trimmed and filed brackets to shape.
5B1F7E09-56A0-4F9B-BEBC-49E207E2BF6B.jpeg
97C799F1-7541-448C-BEC6-73215DB07FB5.jpeg
May 19, 2021
Start fabricating the bulkhead A pulley brackets
- (1.0 hour)
Category: Systems
Drilled the mounting holes in both pulley block assemblies
B3C26125-E817-439A-B791-B39FF86A6658.jpeg
2463550D-BE64-4402-A24A-CD7E067AF701.jpeg
8AD0A7FE-F8A6-460F-9B85-B32E2A8356DD.jpeg
May 16, 2021
Re cut pulley group parts
- (2.5 hours)
Category: Systems
Recut the necessary pulley guard parts and reassemble the pulley group
C9DD88C1-4536-4EAB-BEEF-005E56272B0A.jpeg
B8B15BEA-5B47-43BD-8602-2803F8636DDD.jpeg
May 15, 2021
Start assembling the center pulley group
- (1.0 hour)
Category: Systems
Started to assemble the center pulley group, fabricated the spacers and discovered that there was a revision to the parts that I had cut, need to remake several pieces
May 13, 2021
Cut out center pulley brackets
- (4 hours)
Category: Systems
Cut out all of the center pulley guard brackets and cut the slit in the square stock
9A04482C-F2E8-4F87-B2C8-328B230A60E7.jpeg
May 12, 2021
Installed the lower aft flap pulleys and upper crossover pulleys
- (1.0 hour)
Category: Systems
Installed the lower aft flap pulleys and upper crossover pulleys
DE33EF5E-5ACA-472C-B449-E3B5EAF49BE8.jpeg
6DAEEDB7-199E-4061-A3B2-9B7C0484A476.jpeg
May 11, 2021
Drill corners for center pulley brackets
- (0.5 hour)
Category: Systems
Used the uni-bit to drill the inner corners of the center pulley brackets
May 10, 2021
Installed the aft center pulleys
- (0.5 hour)
Category: Systems
Installed the center aft pulleys, both left and right installed cotter pins for cable guide
C21076B2-AEA0-42C7-AF55-2B47C538A411.jpeg
CD803695-4CB9-422E-8C0C-BC6147F39422.jpeg
May 09, 2021
Made templates and mark metal for fwd pulley assembly
- (1 hour)
Category: Systems
Made the templates for all the sheet metal parts for the forward pulley assembly
May 08, 2021
Complete installation of Control Yoke and Flap Handle
- (1.5 hours)
Category: Systems
Complete assembly and installation of the control yoke
Fit sanded the dowel and completed flap handle assembly and installation
84841C5D-5234-489A-B151-1989275E6DA8.jpeg
E1803027-AC2C-44DC-A892-20E8E44E1A96.jpeg
May 07, 2021
Start fitting control yoke Assy and Flap Handle
- (2 hours)
Category: Systems
Started fitting parts for the control yoke assembly.
Started assembly of the flap handle, I got 3/4” dowel for the spacer but this was a little small so did a fiberglass layup to make it the full 3/4
84D0BFFA-5D40-4C7D-BDBE-7AB99CC310F4.jpeg
780C897C-F3D3-4DBC-81BF-B210BF143C19.jpeg
5A376841-C793-4D1B-8ACF-CD5596A90BDF.jpeg
May 06, 2021
Complete installation of cast rudder pedals
- (2 hours)
Category: Systems
Completed filing the brake hold down tabs and match drilled to rudder pedals, test fit the pedals
5D30254C-C527-4694-80F6-5EE79C1FCAE9.jpeg
FA85FC8D-0D73-4AFB-8787-A67A2B39C5AA.jpeg
A8DB4D31-6097-46C8-B09D-97316CFE14AA.jpeg
89DEE0C7-5429-406F-8AB3-83212C4FC23D.jpeg
F3879495-9A28-4079-8908-7B03BAF6C268.jpeg
C1267377-5F51-4E51-A235-84C0FE4686CD.jpeg
May 05, 2021
Refit rudder pedal weldments, fab brake linkage
- (2.5 hours)
Category: Systems
Refit the pedal weldments to get a better angle. Use large washers to make sure pedals don't move with elongated holes.
Fabricated the last 3 brake pedal linkage pieces to be installed on the cast rudder pedals.
FF158F25-7C02-4664-9337-7E463B9BFFE2.jpeg
May 03, 2021
Install master cylinders and rudder pedals, start Assy of control yoke
- (1.3 hours)
Category: Systems
Installed the master cylinders, fitted cast brake pedals, need to cut the aluminum tabs
Started assembling the control yoke connecting rod
03980578-84C9-4EAA-987C-53B7F31B0596.jpeg
2A6F7F41-E2B5-4A02-AEB6-D4CEFE485867.jpeg
Apr 30, 2021
Install Rudder Pedal Brake Weldments
- (2.5 hours)
Category: Systems
Fit the brake pedal steel weldments, positioned and drilled.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.