Project: WoodysSportsman   -  
            Listing for Category : finish
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:John Wood   -  
Project:   Glasair - Sportsman 2+2
Total Hours:873.4
Total Flight Time:
Total Expense:N/A
Start/Last Date:Nov 04, 2017 - No Finish Date
Engine:Lycoming IO390 C3B6
Propeller:Hartzell 80” Trailblazer
Panel:Garmin G3X dual display/GTN650Xi/G5/GNC215
 
Friendly URL: https://eaabuilderslog.org?s=WoodysSportsman

Home or Last Project Picture

Mar 23, 2024     Installed GMA245R and GTX45R on right porkchop - (3 hours)       Category: Finish
Assembled brackets for the GTX 45R tray and installed both the Audio panel and transponder onto the right pork chop


 
Mar 17, 2024     Installed GEA24 and GAD29 on left porkchop - (1.5 hours)       Category: Finish


 
Mar 15, 2024     More panel assembly - (1 hour)       Category: Finish
Added support brackets


 
Mar 14, 2024     Install updated panel - (2 hours)       Category: Finish
Installed the updated panel, needed to spin the panel to R5 since there were interference issues


 
Mar 01, 2024     Assemble new radio stack backets - (3 hours)       Category: Finish


 
Nov 21, 2023     Installed Stick Grips - (2 hours)       Category: Finish
Installed the stick grips on the control sticks.
This required removing material from the inside at the base of the grips due to the bend in the tube.


 
Nov 19, 2023     Complete GPS tray install / Final Panel Install - (4 hours)       Category: Finish
Completed fabricating and installing GPS support braces
Final installation of carbon panel

Notes need to make support for one screw that will interfere with alt switch


 
Nov 17, 2023     Start fabricating GPS braces - (1.5 hours) Category: Finish
Started fabricating and installing forward supports for the GPS tray
 
Nov 16, 2023     Install ADAHRS on panel - (0.2 hour)       Category: Finish


 
Nov 15, 2023     Complete assembly of new audio panel - (0.5 hour) Category: Finish
 
Nov 13, 2023     Installed displays and GPS as well as the G5 on the main panel - (0.7 hour)       Category: Finish
Installed displays and GPS as well as the G5 on the main panel


 
Nov 12, 2023     Complete installing nutplates on panel - (5 hours)       Category: Finish
Completed installing all the nutplates on the panel
Installed the main switch and two wing panels


 
Nov 08, 2023     Trim flanges on panel - (1.1 hours)       Category: Finish
Trim new Flanges, trim the carbon flanges


 
Nov 07, 2023     Layup new flanges on instrument panel - (2 hours) Category: Finish
Since excess flange was trimmed for the Garmin brackets on the main panel as well as some adjustments for better fit several layups to build back those flanges were done
 
Nov 05, 2023     Interior paint / center console - (3.5 hours)       Category: Finish
Painted the door, touch up cable cover, seat rails and center console
Also installed all nutplates on the center console
Discovered interference with frame so ordering new aft panel on the console


 
Nov 04, 2023     Prime and prep areas for paint - (2 hours)       Category: Finish
Sanded the door, seat rails and center console


 
Nov 03, 2023     Composite work to fix some pre paint issues - (2 hours) Category: Finish
Layups to fix some things prepaint
- Fix area on lower corner of pax door sanded through, 2 ply carbon
- apply carbon cloth over upper panel attach tabs
- apply layer of DBM over the outer aft seat rails
 
Nov 02, 2023     Reattach panel upper attach tabs - (1 hour)       Category: Finish
Sand and re attach panel attach tabs


 
Oct 29, 2023     Fitting sub panels and disaster! - (3.5 hours)       Category: Finish
Complete fitting sub panels in the main panel as well as the console
While test fitting the glare shield discovered interference with the outer CB on the left wing and CO detector on the right wing panels.

After the test fitting while removing the glare shield the two top mounting tabs popped off the carbon panel and the panel fell scratching the main panel on the flap latch bar.

Since the main panel has a big scratch, decided to fix the location of the GPS mounting screws and add standoffs for the displays and float controller. The left and right wing panels will be revised to clear interferences as well.

Also revising the lower right panel to allow more space for right angle anchors.


 
Oct 28, 2023     Fitting carbon for left wing panel - (2 hours)       Category: Finish
Relieve the flange for clearance to fit the right wing panel


 
Oct 27, 2023     Stuffed lower right panel and console panels - (1 hour)       Category: Finish
Stuffed the lower right panel, this required milling some clearances for the pots
Stuffed the console panels, lights and headset jacks/connectors


 
Oct 26, 2023     Stuffed the lower left and right wing panels - (1.5 hours)       Category: Finish
Stuffed the lower left and right wing panels
Started fitting the lower left.

Waiting for parts on right wing


 
Oct 25, 2023     Stuffing Panels, Displays and Left Wing - (1 hour)       Category: Finish
Temporarily fit the displays, looks good, stuffed the left wing panel


 
Oct 24, 2023     Complete panel cutouts - (2 hours)       Category: Finish
Interference on the lower center panel, response it to clear center holes and mixture knob


 
Oct 23, 2023     Started cutting out panel inserts - (2.5 hours)       Category: Finish


 
Oct 23, 2023     Started fitting and cutting carbon panel - (2.5 hours)       Category: Finish
Got in the bunny suit since this makes a lot of carbon dust, no messing around. Respirator…
Based on Sean's experience I opted to score the clear coat instead of cutting with tape on so no risk of lifting the clear.
All good so far


 
Oct 13, 2023     Started fitting tunnel covers - (2 hours)       Category: Finish
Fitting of the forward tunnel covers, this is a finish task but being done to allow for better fitting of the fuel valve
Fabricated a clear plexiglass template to use to drill hole in firewall


 
Apr 10, 2023     Relieve stress area on wing tips for better fit - (1 hour)       Category: Finish
The wing tips were very tight at the vertical center support. Cut and reglassed for better fit


 
Apr 09, 2023     Installed Nav Antennas - (2 hours)       Category: Finish
Installed Nav antennas in wing tips


 
Apr 08, 2023     Tip finish work - (5.5 hours)       Category: Finish
Completed vent installation
Completed all but two of the inspection doublers. The two on the left wing are taped in place to allow for adjusting pitot angle
Touch up left wing tip
Completed and tested trim wiring


 
Apr 05, 2023     Trim tips around ailerons - (1.5 hours) Category: Finish
Trimmed the tips near the ailerons, started installing the vent lines.
 
Apr 04, 2023     Continue tip installation - (2 hours) Category: Finish
Completed riveting the anchors on the left tip. used thinner dies and easily riveted the last rivet
 
Apr 03, 2023     Finished mounting right wing tip - (2.5 hours)       Category: Finish
Drilled and installed nutplates and wing tip on right wing

Started trimming aileron counterweight.

Dropped washer in cove. Use tape to prevent that in the future.


 
Apr 02, 2023     Rebuild tips at leading edge for better contour - (3 hours)       Category: Finish
The wing tips did not follow the leading edge contours well. I put a piece of tape for mold release and added a mix of resin, milled fiber and cabosil to fill the gap. After cure I sanded the leading edge down and added 2 plus of BID to remake the leading edge joint.


 
Mar 31, 2023     Terminated main fuel qty / start fitting tips - (2 hours)       Category: Finish
Terminated the main fuel qty wires
RTV wires in place
Torque Seal wing root nuts


 
Mar 30, 2023     Wing electrical - (1.5 hours)       Category: Finish
Wired the left wing tip connector


 
Mar 29, 2023     Install aileron counterweights - (1.7 hours)       Category: Finish
Completed finishing the interference on the left aileron

Installed aileron counterweights


 
Mar 27, 2023     Installed control surfaces, start fitting tips, lengthen vent lines - (5 hours)       Category: Finish
Installed all control surfaces and identified interferences.

Started fitting tips and aileron counter weights.

Replaced vent lines with slightly longer so vent lines are not under tension.


 
Mar 25, 2023     Complete wing construction - (6 hours)       Category: Finish
Completed the right flap cove and left root rib. Left root rib gave met fits at the front doubler. Needed to go oversized on the rivets. Was able to squeeze the dimple on the leading edge skin to get a 5/32 rivet installed. Cleco inspection doublers in place.


 
Mar 24, 2023     Install right root rib - (2.4 hours)       Category: Finish
Installed the right root rib
Installed couplers on vent line


 
Mar 23, 2023     Prep root ribs for installation, bonded right flap cove - (2.5 hours)       Category: Finish
Bonded the right flap
Countersunk the root ribs
Primed root ribs and doublers


 
Mar 22, 2023     Fabricate spar doublers. Sand wedges to fit - (2 hours) Category: Finish
Sanded three of the four spacer wedges, one didn't cure

Fabricated the spar doublers for the root ribs
 
Mar 21, 2023     Installed tabs for wedges to fill the slant on the root rib - (1.5 hours) Category: Finish
Cleaned up resin and installed tabs to sand down to make new wedges
 
Mar 20, 2023     Install tip ribs - (1.5 hours) Category: Finish
Installed the tip ribs left and right wing,
Attempted to use resin with milled fiber, but it did not kick, too old
 
Mar 19, 2023     Cleaned up aileron, fit flap and install fuel tanks - (6 hours)       Category: Finish
Cleaned up aileron
Fit the flap
Install fuel tanks and lines


 
Mar 18, 2023     Prep coves for bonding and install - (6 hours)       Category: Finish
Prepped the coves
Rivet coves
Glued and riveted tabs

Received stick grips!!!


 
Mar 16, 2023     Drill / debur right wing bottom coves and trailing edge - (2 hours)       Category: Finish
Marked the trailing edge for the rivets for bottom trailing edge to coves.
Drilled and deburred all holes


 
Mar 15, 2023     Cleanup trailing edges, left Aux tank install - (2 hours)       Category: Finish
Removed the clamps and angle stock
Buffed the edges and trimmed even
Installed rip stop rivets
Installed left aux tank
Cleco'd left tip rib


 
Mar 14, 2023     Bonded Left Flap Cove / Right cove fab - (6 hours)       Category: Finish
Fabricated flap angle
Bonded left flap
Trimmed all right coves to final length
Cut inspection holes
Trimmed large inspection hole cover
Fabricated right cable guide


 
Mar 13, 2023     Bonded the aileron trailing edge - (1.5 hours)       Category: Finish
Fabricated the angle for clamping the trailing edge
Bonded and clamped the aileron coves


 
Mar 12, 2023     Prep coves for installation - (6.5 hours)       Category: Finish
A lot done…
Surface prep 36 grit all cove surfaces for bonding, trailing edges, cove doublers, inside edge of coves
Dimple trailing edge
Riveted cove bottom trailing edge and tabs, tabs were also bonded
Trimmed bottom trailing edge for flap clearance about 1mm.
Drilled rip stops, using 1/16 spacers to set flap distance


 
Mar 10, 2023     Prime cove skins - (0.5 hour)       Category: Finish
Primed the coves skins, dimpled bottom trailing edge.


 
Mar 09, 2023     Surface prep of left cove skins - (3 hours)       Category: Finish
Cleaned up all left cove skins, rounded corners and filed all edges. Opened inspection cover holes to #19.

Alumiprep and alodine skins and panels

Fab cable organizer to ensure cables don't get crossed


 
Mar 09, 2023     Drill L Aileron Cove Tabs, fab inspection covers - (2.5 hours)       Category: Finish
Drilled all the tabs on the aileron cove skins
Fabricated the inspection covers for both wings
Still need to finish right covers


 
Mar 07, 2023     Trimmed flap coves and drilled tabs - (1.9 hours)       Category: Finish
Trimmed the flap tab trailing edges to 1/4 short of the trailing edge per TWTT instructions.

Drilled all the tabs on the flap cove ribs


 
Mar 06, 2023     Continue work on left wig coves - (2 hours) Category: Finish
Fitting and deburring the cove skins on the left wing
 
Mar 05, 2023     Drilled trailing edge on left coves, start fitting doublers - (4 hours)       Category: Finish
Marked and drilled the trailing edge lower skin
Drilled and cleco all holes
Started debur


 
Feb 22, 2023     Left wing cove inspection panels - (1.5 hours)       Category: Finish
Cut the openings for the left cove inspection covers


 
Feb 21, 2023     Starting on Coves - (1.0 hour)       Category: Finish
Cutting cove skins to length


 
Feb 18, 2023     Remove wings form jigs, small tasks pre cove - (2 hours)       Category: Finish
Ryan and I removed the wings from the jigs, the jigs were taken down and stored.
The aux fuel tank rails were installed with pull rivets
Using rivet squeezer riveted inboard and outboard trailing edge ribs on each wing
Also using rivet squeezer riveted the small inspection hole doublers on the inboard skins, prerequisite for installing the main tanks


 
Feb 12, 2023     Completed left top inboard skin, top skins are DONE! - (2 hours)       Category: Finish
Completed the lower spar rivets on the inboard top left skin with Ryan P.
We also riveted the flap bracket, much easier with two people.
After Ryan left I completed the trailing edge ribs.

This completes the top skins, a major project milestone.

Note: Bob Dimeo inspected the work on 2.17 and found everything to be satisfactory so moving on to the cove skins


 
Feb 11, 2023     Completed Right Top skins - (6.5 hours)       Category: Finish
Completed riveting the aft spar ( center and inboard )
Riveted the remaining trailing edge and flap brackets on trailing edge ( Right )
Trimmed all pull rivets on right wing
Installed rivets on outboard left flap bracket


 
Feb 08, 2023     Completed riveting right training edge - (1.3 hours)       Category: Finish
Riveted the outboard rivets on the right outboard
Prepped holes for the pull rivets and installed pull on left center at doubler
Adjusted the inboard skin trailing edge overlap so its more flush


 
Feb 07, 2023     Completed riveting center top aft spar - (2.3 hours)       Category: Finish
Ryan and I completed riveting the center top aft spar rivets, big progress. The rivets near the pulleys were more challenging than expected especially with the 5/32 rivets


 
Feb 05, 2023     Completed riveting the hat sections on the left wing - (2.5 hours)       Category: Finish
Ryan and I completed riveting the hat sections of the upper left wing skin.

Also completed installing the roll autopilot servo. Installed a modified 4-40 anchor plate to the wire support to make it easier to install/remove the servo


 
Feb 04, 2023     Complete riveting right upper inboard top hat sections - (2 hours)       Category: Finish
Completed riveting the top inboard hat sections on the right wing with RP


 
Feb 03, 2023     Rivet doubled ribs both wings - (3.5 hours)       Category: Finish
Prepped wings for skin riveting to aft spar on both inboard top skins
Riveted top doubled ribs at inboard / center skin ovelap

With Chris


 
Feb 02, 2023     Complete forward spar rivets on the inboard top skins - (3 hours)       Category: Finish
Picture shown has all clecos for further work

with Ryan


 
Jan 31, 2023     Start riveting top inboard FWD spar - (2.5 hours)       Category: Finish
Riveted all but the hat section forward spar rivets on the left inboard top skin

With Ryan


 
Jan 30, 2023     Trim rivets and jig left inboard skin - (0.5 hour) Category: Finish
Cut the rivets fore the fwd spar inboard skins, jigged the left inboard skin
 
Jan 29, 2023     Prep right inboard skins - (1 hour) Category: Finish
Prepped the left/right inboard skins for installation
 
Jan 28, 2023     Complete top center right to spar - (3.5 hours)       Category: Finish
Completed riveting top center right skin down to the spar with Chris L


 
Jan 27, 2023     Installed plugs - (1 hour)       Category: Finish
Installed the plugs to relocate the main sump drains


 
Jan 26, 2023     Continue top center right spar and skin riveting - (2.5 hours) Category: Finish
Ryan P. We completed the top center right skin spar rivets and continued with the upper ribs
 
Jan 25, 2023     Prep and paint fix plugs for main tank drains - (0.7 hour) Category: Finish
Sanded and painted the plugs fabricated to relocate the main sump drains
 
Jan 24, 2023     Started riveting top right center spar - (2.5 hours)       Category: Finish
Worked with Ryan to rivet all but one bay of the top center spar


 
Jan 22, 2023     Completed center skin down to aft spar - (2 hours)       Category: Finish
Worked with Larry to complete center left top skin to the aft spar


 
Jan 21, 2023     Continue left center skin, 3/32 rivets - (3.5 hours)       Category: Finish
Working with Chris, completed the top 2/3rd of the rib rivets and the upper stiffener with Chris, also riveted the right center doubler


 
Jan 20, 2023     Completed top left center spar rivets - (3 hours)       Category: Finish
Completed riveting the top center spar, including cherry max rivets
Fabricated bucking bar for center stiffeners behind strut beam
Cleaned up cable ties in left and right wing
Prepped center right skin for installing fuel pump doubler


 
Jan 15, 2023     Prepped Left Wing Center Skin - (1 hour)       Category: Finish
Temp install and prep left center skin for installation
Also primed overlap on outer right skin


 
Jan 14, 2023     Continue outboard top skin - (2 hours)       Category: Finish
Ryan and I completed down to and including the aft spar on the right outboard top skin
Installed the 5 cherry max rivets and cleaned up left wing cherry max rivets.


 
Jan 09, 2023     Complete top spar on right outboard - (1.2 hours)       Category: Finish
With Ryan P. Completed the top outboard fwd spar


 
Jan 08, 2023     Complete Left Outboard Top Skin - (3 hours)       Category: Finish
Completed riveting the top left outboard wing skin
Started riveting top of Right

Chris is now a certified Rosie


 
Jan 06, 2023     Continue riveting top skins - (2.7 hours)       Category: Finish
Riveted the top left outboard skin down from the top stiffener to the aft spar with Ryan P.


 
Jan 02, 2023     Continue riveting top skins - (3.5 hours)       Category: Finish
Continued riveting the top left outboard wing skin, trained Chris LaBarre, he is now a certified Rosie :-)
Riveted 3/32 down to and including top stiffenters


 
Dec 30, 2022     Start closing up wings ”Left outboard” - (3.5 hours)       Category: Finish
Started installed top wing skins, doing left top outboard, prepped and positioned skin
Ring out outboard wiring
With Ryan riveted top row of rivets


 
Apr 29, 2022     Complete instrument panel fitting - (2.2 hours)       Category: Finish
Completed fitting the instrument panel. Fabricated upper braces. Cleaned up outer vertical supports and filled holes for redrilling. Redrilled hikers for vertical supports.


 
Apr 21, 2022     Start fitting instrument panel - (.7 hour)       Category: Finish
Start fitting instrument panel


 
Apr 20, 2022     Reassemble control sticks - (0.5 hour) Category: Finish
Reassemble control knuckles and sticks, all greased and cotter pins installed
 
Apr 19, 2022     Clean up control sticks and paint - (0.5 hour) Category: Finish
Clean up is drilled holes, debur and paint
 
Apr 15, 2022     Install control sticks - (1 hour)       Category: Finish
Installed control sticks, one bolt resulted in being too close to get a nut on so redrilled off axis


 
Apr 14, 2022     Drilled remaining firewall flange tabs - (1.5 hours)       Category: Finish
Drilled the remaining firewall flange rivet holes and debur all holes


 
Apr 11, 2022     Drill Firewall - (3 hours)       Category: Finish
With Ryan powers help drilled all fuselage mounting point holes and as many flange tabs as possible


 
Apr 05, 2022     Install instrument brackets - (.2 hour) Category: Finish
Installed angle brackets for instrument panel support
 
Apr 03, 2022     Fabricate instrument panel forward angles - (0.7 hour)       Category: Finish
Fabricated the forward instrument panel angle bracket, primed


 
Mar 31, 2022     Clamp firewall sides for firewall template fittin - (0.5 hour)       Category: Finish
Clamp the firewall skirts in place to allow for precise trimming of the firewall template

Also painted the flap attach tab


 
Mar 19, 2022     Fabricate the firewall flanges - (4 hours)       Category: Finish
Fabricated the firewall flanges from the provided stainless steel material. Trimmed, and drilled the relief holes, cut the tabs, debur all edges and rounded tabs. Then bent the tabs using the brake.


 
Mar 17, 2022     Complete install of seat pan nutplates - (1 hour) Category: Finish
Completed installation of the seat pan nutplates, seat pans and inserts are now complete
 
Mar 16, 2022     Test fit nut plate to see if carbon needs reinforcement - (0.5 hour) Category: Finish
Test installed a single nut plate on the seat pans to see if additional carbon is necessary. Looks good
 
Mar 15, 2022     Drill holes for seatpan screws - (0.2 hour) Category: Finish
Drilled 8 holes in each seat pan and insert to allow for securing the seat pan inserts
 
Mar 14, 2022     Final trim and fit of Fibertech seat pan inserts - (0.5 hour) Category: Finish
Trimmed seatpan inserts so they can be installed without removing the seat rails
 
Mar 13, 2022     Assemble Seat Backs and Rails - (3.5 hours)       Category: Finish
Assembled the seatback and rail mechanisms per the TWTT instructions


 
Aug 07, 2021     Complete floor boards, start seat rails and pan inserts - (3 hours) Category: Finish
Installed pilot side floor board
Fitted the inboard and outboard seat rails
Trimmed the pilot and copilot seat pans
Started fitting seat pan inserts, need to trim the inner edges for removal with the inboard seat rails
 
Jul 25, 2021     Fill baggage door and copilot hinges, start floor pans - (1.3 hours) Category: Finish
Filled the holes to allow redrilling the hinge holes
 
Jul 22, 2021     Install aft tunnel cover nutplates - (1.2 hours)       Category: Finish
Tested the pneumatic rivet squeezer
Installed rivets for aft tunnel cover nutplates


 
Jul 21, 2021     Seat hinges and nutplates - (2.2 hours)       Category: Finish
Installed the hinges between the seatback and the seat bottoms
Installed the 4 nutplates for the seatback
Installed the nutplate between the two tunnel covers


 
Jul 20, 2021     Crossover cover and rear seat head rests - (1 hour)       Category: Finish
Drilled holes for rear seat head rests
Drilled new holes for crossover cover
Drilled and countersunk holes for fwd screws on crossover cover
Install crossover nutplates


 
Jul 16, 2021     Installing nutplates, bulkhead A, aft tunnel - (2.5 hours)       Category: Finish
Started installing nutplates
- Installed nutplates for the bulkhead A closeout
- Installed bulkhead A footrest nutplates
- Installed aft tunnel cover footrest nutplates
- Tried installing nutplates on the LAM angles for the aft tunnel cover but the angle if the floor prevents using the hand squeezer, couldn't get an angle with the rivet gun, going to try a pneumatic squeezer and also ordered a 10 degree offset flush rivet head


 
Jul 15, 2021     Finish OH Console, drill and place bulkhead A closeout - (1 hour)       Category: Finish
Removed the overhead console and cleaned off tape
Measured the 16 mounting holes for the bulkhead A closeout


 
Jul 14, 2021     Prep and Install Overhead console - (1 hour)       Category: Finish
Sand the paint off the fuselage and install the overhead console. With the help of Iris to position the clamps


 
Jul 13, 2021     Complete fitting of Overhead Console - (1.5 hours)       Category: Finish
Completed fitting the overhead console, drilled lam angles and installed the nut plates


 
Jul 11, 2021     Completed layups for rear seats - (2 hours)       Category: Finish
Completed the under layup for the rear seat on the copilot side, after allowing to cure, trimmed the layups


 
Jul 10, 2021     More work on layups for rear seat install - (2.5 hours) Category: Finish
Continued by doing the under laminate on the baggage door side of the fuselage, also layup for the upper layer on the copilot side
 
Jul 05, 2021     Drilled tunnel covers and installed footrests - (3.5 hours)       Category: Finish
Drilled the side holes for the fwd and aft tunnel covers.
Installed the fwd attach angle
Drilled all but the floor holes on the footrests
Installed outer seat belt angles


 
Jul 03, 2021     Layup LAM angles for rear tunnel covers - (0.5 hour) Category: Finish
Did the layup for the rest tunnel covers, 1 ply for 7781, 3 DBM, 1 ply 7781
 
Jul 01, 2021     Start fitting crossover and console covers - (2 hours)       Category: Finish
Almost completed fitting the crossover cable cover, a little more relief on some edges. Drilled the mounting holes, need hardware.
Started fitting the Chase center console.


 
May 16, 2021     Touch up door spacers - (1 hour) Category: Finish
Added spacers to better fit the doors
 
May 03, 2021     Touch up and install upper rear sleeves - (0.7 hour) Category: Finish
Completed installing the aft upper door sleeves
 
May 01, 2021     Complete sleeve holes, remount sleeves - (1.5 hours)       Category: Finish
The resin did not kick, this is not too surprising since I promoted it in July of 2020. The manual says it can be repromoted once so I tried before tossing about 600grams of resin. It worked.

I drilled the copilot side sleeve holes. And removed and cleaned the original two that I had tried yesterday. Remounted the lower main door sleeves and baggage,


 
Apr 30, 2021     Install Main Doors and Start Latch Pin Sleeves - (4 hours)       Category: Finish
Positioned and drilled the door hinges. Installed the main doors. Cut the pockets for pilot side and baggage door pin sleeves.
Installed the low latch sleeve and baggage door latch sleeve


 
Apr 30, 2021     Install door seals for main door - (1.3 hours) Category: Finish
Installed the door seals for the main doors
 
Apr 28, 2021     Hang Baggage Door - (1.1 hours)       Category: Finish
Fit the baggage door seal and install the baggage door


 
Apr 27, 2021     Fit and drill arm rests - (1 hour)       Category: Finish
Positioned the arm rests, drilled all holes and temporarily cleco in place


 
Apr 26, 2021     Complete Copilot Main Door Assembly - (3 hours)       Category: Finish
Completed Copliot door, drilled center latch hole, latch tab and lock barrel. Assembled latch assembly


 
Apr 25, 2021     Completed pilot side main door latch assembly - (4 hours)       Category: Finish
Completed assembly of the pilot side main door assembly. Installed the door lock. Installed all three pins and the hinges onto the door


 
Apr 24, 2021     Start assembly of the pilot door mechanism - (1.5 hours)       Category: Finish
Began assembly of the pilot side door, started by drilling out the center hole for the latch mechanism and the square hole for the latch lock mechanism


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.