EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
WoodysSportsman
-
Listing for Category : finish
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (389)
Admin
- (1)
Rudder
Elevator
- (1)
Wings
- (55)
Fuselage
- (87)
Systems
- (105)
Tools
Workshop
Inspection
Finish
- (140)
Builder Name:
John Wood
-
Project:
Glasair - Sportsman 2+2
Total Hours:
873.4
Total Flight Time:
Total Expense:
N/A
Start/Last Date:
Nov 04, 2017 - No Finish Date
Engine:
Lycoming IO390 C3B6
Propeller:
Hartzell 80” Trailblazer
Panel:
Garmin G3X dual display/GTN650Xi/G5/GNC215
Friendly URL:
https://eaabuilderslog.org?s=WoodysSportsman
Home or Last Project Picture
Mar 23, 2024
Installed GMA245R and GTX45R on right porkchop
- (3 hours)
Category: Finish
Assembled brackets for the GTX 45R tray and installed both the Audio panel and transponder onto the right pork chop
IMG_2250.jpeg
IMG_2251.jpeg
IMG_2252.jpeg
IMG_2253.jpeg
IMG_2254.jpeg
Mar 17, 2024
Installed GEA24 and GAD29 on left porkchop
- (1.5 hours)
Category: Finish
IMG_2204.jpeg
IMG_2205.jpeg
Mar 15, 2024
More panel assembly
- (1 hour)
Category: Finish
Added support brackets
IMG_2168.jpeg
IMG_2169.jpeg
Mar 14, 2024
Install updated panel
- (2 hours)
Category: Finish
Installed the updated panel, needed to spin the panel to R5 since there were interference issues
IMG_2166.jpeg
Mar 01, 2024
Assemble new radio stack backets
- (3 hours)
Category: Finish
IMG_2029.jpeg
IMG_2030.jpeg
IMG_2031.jpeg
Nov 21, 2023
Installed Stick Grips
- (2 hours)
Category: Finish
Installed the stick grips on the control sticks.
This required removing material from the inside at the base of the grips due to the bend in the tube.
IMG_1675.jpeg
IMG_1676.jpeg
Nov 19, 2023
Complete GPS tray install / Final Panel Install
- (4 hours)
Category: Finish
Completed fabricating and installing GPS support braces
Final installation of carbon panel
Notes need to make support for one screw that will interfere with alt switch
IMG_1663.jpeg
IMG_1664.jpeg
IMG_1666.jpeg
IMG_1667.jpeg
Nov 17, 2023
Start fabricating GPS braces
- (1.5 hours)
Category: Finish
Started fabricating and installing forward supports for the GPS tray
Nov 16, 2023
Install ADAHRS on panel
- (0.2 hour)
Category: Finish
IMG_1665.jpeg
Nov 15, 2023
Complete assembly of new audio panel
- (0.5 hour)
Category: Finish
Nov 13, 2023
Installed displays and GPS as well as the G5 on the main panel
- (0.7 hour)
Category: Finish
Installed displays and GPS as well as the G5 on the main panel
IMG_1656.jpeg
IMG_1654.jpeg
IMG_1657.jpeg
Nov 12, 2023
Complete installing nutplates on panel
- (5 hours)
Category: Finish
Completed installing all the nutplates on the panel
Installed the main switch and two wing panels
IMG_1649.jpeg
IMG_1650.jpeg
IMG_1651.jpeg
IMG_1652.jpeg
IMG_1653.jpeg
Nov 10, 2023
Drill and install Rivnuts and nutplates on main panel
- (1 hour)
Category: Finish
IMG_1642.jpeg
IMG_1644.jpeg
IMG_1645.jpeg
IMG_1646.jpeg
IMG_1647.jpeg
Nov 08, 2023
Trim flanges on panel
- (1.1 hours)
Category: Finish
Trim new Flanges, trim the carbon flanges
IMG_1641.jpeg
Nov 07, 2023
Layup new flanges on instrument panel
- (2 hours)
Category: Finish
Since excess flange was trimmed for the Garmin brackets on the main panel as well as some adjustments for better fit several layups to build back those flanges were done
Nov 05, 2023
Interior paint / center console
- (3.5 hours)
Category: Finish
Painted the door, touch up cable cover, seat rails and center console
Also installed all nutplates on the center console
Discovered interference with frame so ordering new aft panel on the console
IMG_1622.jpeg
IMG_1623.jpeg
IMG_1624.jpeg
IMG_1625.jpeg
IMG_1626.jpeg
IMG_1627.jpeg
IMG_1628.jpeg
IMG_1629.jpeg
IMG_1630.jpeg
Nov 04, 2023
Prime and prep areas for paint
- (2 hours)
Category: Finish
Sanded the door, seat rails and center console
IMG_1621.jpeg
IMG_1616.jpeg
Nov 03, 2023
Composite work to fix some pre paint issues
- (2 hours)
Category: Finish
Layups to fix some things prepaint
- Fix area on lower corner of pax door sanded through, 2 ply carbon
- apply carbon cloth over upper panel attach tabs
- apply layer of DBM over the outer aft seat rails
Nov 02, 2023
Reattach panel upper attach tabs
- (1 hour)
Category: Finish
Sand and re attach panel attach tabs
IMG_1620.jpeg
Oct 29, 2023
Fitting sub panels and disaster!
- (3.5 hours)
Category: Finish
Complete fitting sub panels in the main panel as well as the console
While test fitting the glare shield discovered interference with the outer CB on the left wing and CO detector on the right wing panels.
After the test fitting while removing the glare shield the two top mounting tabs popped off the carbon panel and the panel fell scratching the main panel on the flap latch bar.
Since the main panel has a big scratch, decided to fix the location of the GPS mounting screws and add standoffs for the displays and float controller. The left and right wing panels will be revised to clear interferences as well.
Also revising the lower right panel to allow more space for right angle anchors.
IMG_1604.jpeg
IMG_1605.jpeg
IMG_1606.jpeg
IMG_1607.jpeg
72032401182__ABF0BDC3-0814-4DAE-8A00-A009BA177A8D.jpeg
Oct 28, 2023
Fitting carbon for left wing panel
- (2 hours)
Category: Finish
Relieve the flange for clearance to fit the right wing panel
IMG_1602.jpeg
IMG_1603.jpeg
Oct 27, 2023
Stuffed lower right panel and console panels
- (1 hour)
Category: Finish
Stuffed the lower right panel, this required milling some clearances for the pots
Stuffed the console panels, lights and headset jacks/connectors
IMG_1594.jpeg
IMG_1601.jpeg
Oct 26, 2023
Stuffed the lower left and right wing panels
- (1.5 hours)
Category: Finish
Stuffed the lower left and right wing panels
Started fitting the lower left.
Waiting for parts on right wing
IMG_1570.jpeg
72006417570__733D79D8-FE94-4459-AA2B-33BF3273AFEB.jpeg
IMG_1600.jpeg
IMG_1571.jpeg
IMG_1572.jpeg
Oct 25, 2023
Stuffing Panels, Displays and Left Wing
- (1 hour)
Category: Finish
Temporarily fit the displays, looks good, stuffed the left wing panel
IMG_1568.jpeg
IMG_1569.jpeg
Oct 24, 2023
Complete panel cutouts
- (2 hours)
Category: Finish
Interference on the lower center panel, response it to clear center holes and mixture knob
IMG_1565.jpeg
Oct 23, 2023
Started cutting out panel inserts
- (2.5 hours)
Category: Finish
IMG_1564.jpeg
Oct 23, 2023
Started fitting and cutting carbon panel
- (2.5 hours)
Category: Finish
Got in the bunny suit since this makes a lot of carbon dust, no messing around. Respirator…
Based on Sean's experience I opted to score the clear coat instead of cutting with tape on so no risk of lifting the clear.
All good so far
71961518001__1B70BC8F-4FBB-425B-8260-B1FC73F1A0C3.jpeg
71961556151__032BD901-6499-4CEA-912D-B6A93206AFE9.jpeg
IMG_1561.jpeg
IMG_1564.jpeg
Oct 13, 2023
Started fitting tunnel covers
- (2 hours)
Category: Finish
Fitting of the forward tunnel covers, this is a finish task but being done to allow for better fitting of the fuel valve
Fabricated a clear plexiglass template to use to drill hole in firewall
IMG_1536.jpeg
IMG_1535.jpeg
Apr 10, 2023
Relieve stress area on wing tips for better fit
- (1 hour)
Category: Finish
The wing tips were very tight at the vertical center support. Cut and reglassed for better fit
68382FB3-CA34-498F-BAAB-6B3C2CA57C65.jpeg
13C74B48-0690-47F9-8D67-2C6186DDFD7D.jpeg
Apr 09, 2023
Installed Nav Antennas
- (2 hours)
Category: Finish
Installed Nav antennas in wing tips
D5BC12A8-8A8A-43DB-99B2-67B2DFA46C68.jpeg
7EA80FBF-8DA7-4E06-AFDE-CE62B3D73562.jpeg
Apr 08, 2023
Tip finish work
- (5.5 hours)
Category: Finish
Completed vent installation
Completed all but two of the inspection doublers. The two on the left wing are taped in place to allow for adjusting pitot angle
Touch up left wing tip
Completed and tested trim wiring
129DD36A-D5E0-4AF7-92CC-75AE4AA499DB.jpeg
2993F55C-89CC-4274-88C8-E08F6E1FCA12.jpeg
D6666F17-DBFE-4A4A-BA84-823241133877.jpeg
9639F69D-BF0F-4EDB-A0B1-A104F10B4A39.jpeg
A3699979-3CA0-4F2D-B744-5B213211846F.jpeg
784F5162-A741-41B4-A4D1-941A01DB2F7E.jpeg
Apr 05, 2023
Trim tips around ailerons
- (1.5 hours)
Category: Finish
Trimmed the tips near the ailerons, started installing the vent lines.
Apr 04, 2023
Continue tip installation
- (2 hours)
Category: Finish
Completed riveting the anchors on the left tip. used thinner dies and easily riveted the last rivet
Apr 03, 2023
Finished mounting right wing tip
- (2.5 hours)
Category: Finish
Drilled and installed nutplates and wing tip on right wing
Started trimming aileron counterweight.
Dropped washer in cove. Use tape to prevent that in the future.
6DF8F72D-FC16-4F63-9F93-84BAADA2B731.jpeg
4F958138-DB78-4822-9016-22160FC29FEE.jpeg
7F14E682-7A42-40B0-814B-9B3956659034.jpeg
7F85A17F-3060-4BF1-A20B-FDD7CD172A21.jpeg
Apr 02, 2023
Rebuild tips at leading edge for better contour
- (3 hours)
Category: Finish
The wing tips did not follow the leading edge contours well. I put a piece of tape for mold release and added a mix of resin, milled fiber and cabosil to fill the gap. After cure I sanded the leading edge down and added 2 plus of BID to remake the leading edge joint.
4C36022C-B923-452F-9805-30985DB8882E.jpeg
A67B9EAD-954F-4CE4-B112-1F7B80CE4434.jpeg
8895C1C6-CE3C-4B41-B3F9-D0F529CA3DD1.jpeg
11119E64-9B93-4FA4-BF7B-17F64E2BB858.jpeg
D691DF7A-F645-460A-A864-A252709FDB26.jpeg
FF35C5B6-0CC8-4739-BBDE-EAFAFC4175FB.jpeg
Apr 01, 2023
Bond wing tip Hal rs
- (3 hours)
Category: Finish
Bonded the left and right wing tip halves
CAE3F696-3472-4004-B08E-24686FD424F5.jpeg
1BF70373-59AA-44A9-82FA-94F3564EC091.jpeg
9E479B5F-C473-4366-95F9-92F10E935CC2.jpeg
196B4CDF-1642-4B8E-A907-A94C8A9F5336.jpeg
96B2A2D4-DCCB-4AB1-B96E-0395E2AACB12.jpeg
D566DE0F-97D3-4468-B3E6-7A040EC17F18.jpeg
Mar 31, 2023
Terminated main fuel qty / start fitting tips
- (2 hours)
Category: Finish
Terminated the main fuel qty wires
RTV wires in place
Torque Seal wing root nuts
B06C283E-3B99-4F29-92F0-F4E110BC760C.jpeg
F52627CD-6324-47F9-9860-AB87102E7BDD.jpeg
Mar 30, 2023
Wing electrical
- (1.5 hours)
Category: Finish
Wired the left wing tip connector
33F0C661-5183-40FD-8B46-585980E43DCD.jpeg
04D99980-AD6A-4555-89E9-9B346AD6F4B2.jpeg
Mar 29, 2023
Install aileron counterweights
- (1.7 hours)
Category: Finish
Completed finishing the interference on the left aileron
Installed aileron counterweights
3CD7430F-1D2D-4EF3-B164-D6014878A72B.jpeg
53493D6C-8931-4111-8514-217CF6B04285.jpeg
D34AFF51-484D-4C57-8948-F8CE3FC45A8A.jpeg
Mar 28, 2023
Wing details
- (1.8 hours)
Category: Finish
Installed the fuel pump screws as well as the wing electrical connector brackets.
Cleaned up interference on both flaps and right aileron
D612C408-27F1-428B-9A1B-7FBB7AA7936B.jpeg
EF52AB31-C5F5-4195-A548-4F9843C5D718.jpeg
929FA297-1B5D-49D1-A2EB-3E3C067E97AF.jpeg
425F63D8-B22C-4EF7-8BAA-BA34CF9BB135.jpeg
A806DBAB-4D66-41EB-8BED-C1A659EB24D2.jpeg
C2935AB8-3EB2-4E29-9260-75AB7E1CD9B2.jpeg
D8734A4C-DAE0-4630-8AA1-EBDAFCCEB7A3.jpeg
Mar 27, 2023
Installed control surfaces, start fitting tips, lengthen vent lines
- (5 hours)
Category: Finish
Installed all control surfaces and identified interferences.
Started fitting tips and aileron counter weights.
Replaced vent lines with slightly longer so vent lines are not under tension.
D8447D73-A52F-4544-B3D7-0769F76536B9.jpeg
2B7F276E-0C27-4195-8621-817FD50D6569.jpeg
A9D09A02-B67C-4838-A9C6-33F5A25B5EC8.jpeg
4FA80AD9-40EC-4ABF-A801-E5F8B646E3A2.jpeg
2426F932-5A3A-4AF3-8B74-8D8F534D2E1F.jpeg
Mar 25, 2023
Complete wing construction
- (6 hours)
Category: Finish
Completed the right flap cove and left root rib. Left root rib gave met fits at the front doubler. Needed to go oversized on the rivets. Was able to squeeze the dimple on the leading edge skin to get a 5/32 rivet installed. Cleco inspection doublers in place.
5FFCB5B7-FC9B-4006-BB1E-00A0B2D221FB.jpeg
129E728D-A8A9-49D0-B94E-90BA3741D140.jpeg
8D15CACC-C110-4436-86E2-EFB7C5AEA294.jpeg
CF95EA2F-0A50-44FE-A1FD-5D7B7B81D478.jpeg
Mar 24, 2023
Install right root rib
- (2.4 hours)
Category: Finish
Installed the right root rib
Installed couplers on vent line
8E0760B4-F994-4820-BEBB-2E0069C9E266.jpeg
849BC948-ECB8-497A-BA91-453467EC0630.jpeg
Mar 23, 2023
Prep root ribs for installation, bonded right flap cove
- (2.5 hours)
Category: Finish
Bonded the right flap
Countersunk the root ribs
Primed root ribs and doublers
4B89EA13-BABD-4D9A-9D37-45B7A7E04F07.jpeg
1B06ECB4-8A92-4123-A896-4BE4DF042752.jpeg
Mar 22, 2023
Fabricate spar doublers. Sand wedges to fit
- (2 hours)
Category: Finish
Sanded three of the four spacer wedges, one didn't cure
Fabricated the spar doublers for the root ribs
Mar 21, 2023
Installed tabs for wedges to fill the slant on the root rib
- (1.5 hours)
Category: Finish
Cleaned up resin and installed tabs to sand down to make new wedges
Mar 20, 2023
Install tip ribs
- (1.5 hours)
Category: Finish
Installed the tip ribs left and right wing,
Attempted to use resin with milled fiber, but it did not kick, too old
Mar 19, 2023
Cleaned up aileron, fit flap and install fuel tanks
- (6 hours)
Category: Finish
Cleaned up aileron
Fit the flap
Install fuel tanks and lines
D39492E5-64A0-443B-A686-E482E2249342.jpeg
6377B1EE-16C5-4E54-BA3E-5E30D03208D2.jpeg
Mar 18, 2023
Prep coves for bonding and install
- (6 hours)
Category: Finish
Prepped the coves
Rivet coves
Glued and riveted tabs
Received stick grips!!!
CC38AEEC-616C-4C76-A798-B1AF47F6B0DC.jpeg
306B38D6-7C38-46DD-846E-02D4602D7ED3.jpeg
Mar 17, 2023
Right cove prep
- (9 hours)
Category: Finish
Labeled cables
Dimpled all bottom right holes
Cleaned up coves
Trimmed all coves to final size
Alumiprep coves
Alodine coves
Primed coves
A66B0614-0F04-41CD-AB06-93A6C356849F.jpeg
21D46681-B9E8-4B9A-8504-AA58AFA21DA9.jpeg
5979F2AA-3E54-4407-8289-1150AD0F5410.jpeg
06DA6F0F-B632-4B7F-BAC0-778A16A43B81.jpeg
B63B719D-015E-4287-BCB1-13C14E12B19A.jpeg
3CEB6091-BBB7-4800-A5FD-2BADE6106022.jpeg
Mar 16, 2023
Drill / debur right wing bottom coves and trailing edge
- (2 hours)
Category: Finish
Marked the trailing edge for the rivets for bottom trailing edge to coves.
Drilled and deburred all holes
437FDF96-B100-4F2B-BA03-F0664ACC574E.jpeg
DC2AEFBE-F411-4EDD-BA62-CED63C525527.jpeg
D4AF5170-602B-4B65-938B-4B5D3B3FD3BB.jpeg
Mar 15, 2023
Cleanup trailing edges, left Aux tank install
- (2 hours)
Category: Finish
Removed the clamps and angle stock
Buffed the edges and trimmed even
Installed rip stop rivets
Installed left aux tank
Cleco'd left tip rib
9AE47F09-676C-4A92-88C2-4DF2ACB144DF.jpeg
1ACF3355-3A07-439F-9A4D-DE08DE1CB34D.jpeg
3E9203B7-FF0D-486E-AE07-8C5B7CF16D0D.jpeg
Mar 14, 2023
Bonded Left Flap Cove / Right cove fab
- (6 hours)
Category: Finish
Fabricated flap angle
Bonded left flap
Trimmed all right coves to final length
Cut inspection holes
Trimmed large inspection hole cover
Fabricated right cable guide
6199DCE5-2DF6-4465-917F-3044B7BE395F.jpeg
0BC837BA-DE6A-4B74-8DD2-58371FB43A8E.jpeg
5E0A1EBB-0A47-4319-AA8D-3CD7D874C2CE.jpeg
ADC607E7-FB07-4DC7-AA03-A1C3B9E779C3.jpeg
C2D6E4A5-EFD5-4E83-B49A-7E5896E6B700.jpeg
8680B56F-E437-480D-87A6-2A50300DB798.jpeg
Mar 13, 2023
Bonded the aileron trailing edge
- (1.5 hours)
Category: Finish
Fabricated the angle for clamping the trailing edge
Bonded and clamped the aileron coves
623953F5-45B8-421C-9348-2F0241C81D40.jpeg
Mar 12, 2023
Prep coves for installation
- (6.5 hours)
Category: Finish
A lot done…
Surface prep 36 grit all cove surfaces for bonding, trailing edges, cove doublers, inside edge of coves
Dimple trailing edge
Riveted cove bottom trailing edge and tabs, tabs were also bonded
Trimmed bottom trailing edge for flap clearance about 1mm.
Drilled rip stops, using 1/16 spacers to set flap distance
7564631D-0C83-49C1-A09F-DA4C38DE14D5.jpeg
284EC4CF-5093-426B-9A6C-85227699224E.jpeg
E0DEF90E-1DBA-4CD3-9F68-8023563733CA.jpeg
388CF50E-FD04-4279-A0B7-1E908986A2FD.jpeg
3D8433E4-5404-4920-AF6A-B4F0CF3A4DEE.jpeg
6BCA7B5C-C8A7-40B9-A754-D1697744D07E.jpeg
Mar 10, 2023
Prime cove skins
- (0.5 hour)
Category: Finish
Primed the coves skins, dimpled bottom trailing edge.
39D13EA9-609A-4954-BDB4-320999E32849.jpeg
Mar 09, 2023
Surface prep of left cove skins
- (3 hours)
Category: Finish
Cleaned up all left cove skins, rounded corners and filed all edges. Opened inspection cover holes to #19.
Alumiprep and alodine skins and panels
Fab cable organizer to ensure cables don't get crossed
4432E44F-BE11-40B5-A34E-16ABC4ECC484.jpeg
88598A8F-4237-48CE-BFCB-A0012ED83F88.jpeg
Mar 09, 2023
Drill L Aileron Cove Tabs, fab inspection covers
- (2.5 hours)
Category: Finish
Drilled all the tabs on the aileron cove skins
Fabricated the inspection covers for both wings
Still need to finish right covers
AE136423-3782-42CD-90EB-76AC147D9ADD.jpeg
283E00FC-25EC-412E-9985-0FBA0D2A7B0B.jpeg
0E07A716-D8B0-4B65-8F11-9B2FEB717B56.jpeg
Mar 07, 2023
Trimmed flap coves and drilled tabs
- (1.9 hours)
Category: Finish
Trimmed the flap tab trailing edges to 1/4 short of the trailing edge per TWTT instructions.
Drilled all the tabs on the flap cove ribs
E755B16B-D2FA-4D12-9C78-96B72D77382B.jpeg
Mar 06, 2023
Continue work on left wig coves
- (2 hours)
Category: Finish
Fitting and deburring the cove skins on the left wing
Mar 05, 2023
Drilled trailing edge on left coves, start fitting doublers
- (4 hours)
Category: Finish
Marked and drilled the trailing edge lower skin
Drilled and cleco all holes
Started debur
D19D5D20-4859-4C48-A9C9-2037F37C5997.jpeg
8774386D-D0EE-4D1C-A13D-CF7AACF54669.jpeg
160DFDA9-4241-4EE8-AA9A-8182E09565E5.jpeg
Mar 03, 2023
Engine Arrived - ULPower 520T
Category: Finish
0252C792-5377-4D47-94FE-79212B75AD0B.jpeg
88A60D54-FB2A-4380-8902-3B512557C1E4.jpeg
6EF72BA8-06BF-4B71-902C-ECECC2945B96.jpeg
CEAAA700-208D-4860-A946-09F265668D83.jpeg
Feb 24, 2023
Rolled left wing coves
- (1.2 hours)
Category: Finish
3DDDBA2D-B455-4085-B195-36D2D266FB2C.jpeg
102A65DD-6A69-4FF9-8BCB-C754F07F5712.jpeg
Feb 22, 2023
Left wing cove inspection panels
- (1.5 hours)
Category: Finish
Cut the openings for the left cove inspection covers
92B1B1A6-5913-4B36-B6A8-19CEEC37110A.jpeg
1C07498D-66B3-4107-AB80-D20E1C713401.jpeg
Feb 21, 2023
Starting on Coves
- (1.0 hour)
Category: Finish
Cutting cove skins to length
28713D77-324A-41F5-82EA-A6944DDF0D6E.jpeg
Feb 18, 2023
Remove wings form jigs, small tasks pre cove
- (2 hours)
Category: Finish
Ryan and I removed the wings from the jigs, the jigs were taken down and stored.
The aux fuel tank rails were installed with pull rivets
Using rivet squeezer riveted inboard and outboard trailing edge ribs on each wing
Also using rivet squeezer riveted the small inspection hole doublers on the inboard skins, prerequisite for installing the main tanks
70E60DAA-F031-4A64-8B6E-00B03B9A3A1C.jpeg
816174CB-7DBF-404A-9B03-1FF5096E162D.jpeg
AA21E5E3-118A-48F2-ADAA-0BD13E256878.jpeg
B3A76BB1-C59C-47C4-9835-3D89E1F6F3A9.jpeg
6B499220-0EAE-4B89-A90C-51780ED760FC.jpeg
BE7E2F2B-4952-40AF-B518-A51F981AB3CD.jpeg
976266FF-4796-41C2-A99A-EE701FAA4C4F.jpeg
B34F4413-B3EB-403C-99A0-C5A1525E5F1A.jpeg
1BEB0DBF-238B-4E34-A82E-3D32ED88D734.jpeg
Feb 12, 2023
Completed left top inboard skin, top skins are DONE!
- (2 hours)
Category: Finish
Completed the lower spar rivets on the inboard top left skin with Ryan P.
We also riveted the flap bracket, much easier with two people.
After Ryan left I completed the trailing edge ribs.
This completes the top skins, a major project milestone.
Note: Bob Dimeo inspected the work on 2.17 and found everything to be satisfactory so moving on to the cove skins
AB6D86AE-A662-4F09-BD18-61F47D9B9B4E.jpeg
Feb 11, 2023
Completed Right Top skins
- (6.5 hours)
Category: Finish
Completed riveting the aft spar ( center and inboard )
Riveted the remaining trailing edge and flap brackets on trailing edge ( Right )
Trimmed all pull rivets on right wing
Installed rivets on outboard left flap bracket
1ADF0026-7E61-438F-99ED-4DC2937B7A3F.jpeg
0AA924B1-E4BE-4094-8E18-9707AF46C169.jpeg
Feb 10, 2023
Completed trimming flap cove tabs/center trailing edge rivets
- (2.5 hours)
Category: Finish
Cutoff all the tabs on the flap ribs
Riveted center left trailing edge rivets
F5012A2F-709A-4982-B747-FBA644238895.jpeg
5A13E905-3903-45DD-9650-381C3E029B70.jpeg
55A249DF-BA4A-498A-8937-FA3465FD5A9B.jpeg
EA2ABC3C-D8D2-4F1C-A952-920D85FC1763.jpeg
Feb 08, 2023
Completed riveting right training edge
- (1.3 hours)
Category: Finish
Riveted the outboard rivets on the right outboard
Prepped holes for the pull rivets and installed pull on left center at doubler
Adjusted the inboard skin trailing edge overlap so its more flush
C3BF1FDF-8113-44C6-8B29-DC7F2B9DEA68.jpeg
Feb 07, 2023
Completed riveting center top aft spar
- (2.3 hours)
Category: Finish
Ryan and I completed riveting the center top aft spar rivets, big progress. The rivets near the pulleys were more challenging than expected especially with the 5/32 rivets
DFDB5C72-4239-4361-9B59-2FAA9641E257.jpeg
Feb 05, 2023
Completed riveting the hat sections on the left wing
- (2.5 hours)
Category: Finish
Ryan and I completed riveting the hat sections of the upper left wing skin.
Also completed installing the roll autopilot servo. Installed a modified 4-40 anchor plate to the wire support to make it easier to install/remove the servo
F6B56003-06A9-43B4-A4D8-01DB430627C4.jpeg
Feb 04, 2023
Complete riveting right upper inboard top hat sections
- (2 hours)
Category: Finish
Completed riveting the top inboard hat sections on the right wing with RP
0C0BF26F-AC1A-4D82-B05B-53734C16AE0F.jpeg
Feb 03, 2023
Rivet doubled ribs both wings
- (3.5 hours)
Category: Finish
Prepped wings for skin riveting to aft spar on both inboard top skins
Riveted top doubled ribs at inboard / center skin ovelap
With Chris
1087D0AC-DFE2-4B18-A32B-01070F899B85.jpeg
91D1C6CD-5698-4E90-B99C-A23C77B237B0.jpeg
2AE39372-9D49-4197-91DD-B2F437E03DBC.jpeg
Feb 02, 2023
Complete forward spar rivets on the inboard top skins
- (3 hours)
Category: Finish
Picture shown has all clecos for further work
with Ryan
04082735-ED98-46C7-BA47-F50EF0D99F93.jpeg
D70F24AC-6926-4AB4-9883-C7F19B4C5731.jpeg
Jan 31, 2023
Start riveting top inboard FWD spar
- (2.5 hours)
Category: Finish
Riveted all but the hat section forward spar rivets on the left inboard top skin
With Ryan
63F4F2F6-B25F-4AD8-BF67-84C302A95650.jpeg
Jan 30, 2023
Trim rivets and jig left inboard skin
- (0.5 hour)
Category: Finish
Cut the rivets fore the fwd spar inboard skins, jigged the left inboard skin
Jan 29, 2023
Prep right inboard skins
- (1 hour)
Category: Finish
Prepped the left/right inboard skins for installation
Jan 28, 2023
Complete top center right to spar
- (3.5 hours)
Category: Finish
Completed riveting top center right skin down to the spar with Chris L
613B973E-EB4F-497D-BF21-5DA0ECE2DF67.jpeg
Jan 27, 2023
Installed plugs
- (1 hour)
Category: Finish
Installed the plugs to relocate the main sump drains
F29713C7-5C66-43C1-8FBD-00C153D483DC.jpeg
AE74E59C-BF84-4494-B745-ADCCCF9C919C.jpeg
Jan 26, 2023
Continue top center right spar and skin riveting
- (2.5 hours)
Category: Finish
Ryan P. We completed the top center right skin spar rivets and continued with the upper ribs
Jan 25, 2023
Prep and paint fix plugs for main tank drains
- (0.7 hour)
Category: Finish
Sanded and painted the plugs fabricated to relocate the main sump drains
Jan 24, 2023
Started riveting top right center spar
- (2.5 hours)
Category: Finish
Worked with Ryan to rivet all but one bay of the top center spar
619355B8-3BDC-4033-84D1-D7C1A9A4B33A.jpeg
Jan 22, 2023
Completed center skin down to aft spar
- (2 hours)
Category: Finish
Worked with Larry to complete center left top skin to the aft spar
AE311093-965F-4220-96A8-F4BD2184193E.jpeg
Jan 21, 2023
Continue left center skin, 3/32 rivets
- (3.5 hours)
Category: Finish
Working with Chris, completed the top 2/3rd of the rib rivets and the upper stiffener with Chris, also riveted the right center doubler
7CE5BD12-41A0-4392-B73B-47632846562E.jpeg
1D527118-84D4-4A19-AEEA-5C1214AF948C.jpeg
Jan 20, 2023
Completed top left center spar rivets
- (3 hours)
Category: Finish
Completed riveting the top center spar, including cherry max rivets
Fabricated bucking bar for center stiffeners behind strut beam
Cleaned up cable ties in left and right wing
Prepped center right skin for installing fuel pump doubler
2AE43FDF-B487-4808-A2A0-3C6836686BCF.jpeg
A5726F1F-2A6A-4A9F-A74F-3117EB14A4A8.jpeg
Jan 17, 2023
Start Left Center Skin Installation
- (2.5 hours)
Category: Finish
Started installing the left center skin,
Verified all the nuts with torque seal
Cleaned
Installed fuel pump doubler
Started riveting the top center skin
AC662154-FEB1-4779-88F6-25D386F14C92.jpeg
50129C77-B25C-4FD6-9923-2AD8B4F2C05A.jpeg
E57D683C-DA51-4424-BCB1-AFF5C8CBD8C5.jpeg
203A6399-D644-4921-A995-F1F38DF1E1D6.jpeg
FDAFF02D-03DA-4F38-A7E9-26DE3012B166.jpeg
99BA345D-5F4A-412C-82B2-C391FD877436.jpeg
BA97F021-A2D0-41B9-93DE-AA6A84E6D374.jpeg
Jan 15, 2023
Prepped Left Wing Center Skin
- (1 hour)
Category: Finish
Temp install and prep left center skin for installation
Also primed overlap on outer right skin
32836C89-096B-4D51-8FA8-F1B8F248F357.jpeg
BECF3213-307F-40A7-A53A-65AC9B0BA986.jpeg
Jan 14, 2023
Continue outboard top skin
- (2 hours)
Category: Finish
Ryan and I completed down to and including the aft spar on the right outboard top skin
Installed the 5 cherry max rivets and cleaned up left wing cherry max rivets.
AF35B856-558A-4D59-B880-2094F825C406.jpeg
Jan 12, 2023
Continue riveting top right outboard skin
- (2 hours)
Category: Finish
47A01AA7-5C53-4969-95F8-99A35AA1129F.jpeg
3F516337-BA02-42BB-A00B-95E2509D28B7.jpeg
Jan 09, 2023
Complete top spar on right outboard
- (1.2 hours)
Category: Finish
With Ryan P. Completed the top outboard fwd spar
D7FA726C-294B-49C0-A5E0-9F5496D82448.jpeg
Jan 08, 2023
Complete Left Outboard Top Skin
- (3 hours)
Category: Finish
Completed riveting the top left outboard wing skin
Started riveting top of Right
Chris is now a certified Rosie
56B2D4E8-0559-443A-A457-B78472C91BF0.jpeg
30F71D73-99F4-4F7C-9F86-AE222E9FB13D.jpeg
Jan 06, 2023
Continue riveting top skins
- (2.7 hours)
Category: Finish
Riveted the top left outboard skin down from the top stiffener to the aft spar with Ryan P.
2FC939C0-CC6E-456C-A2A0-8D808C5BA077.jpeg
2F251B87-DBDE-4D06-943D-D53D3ECCF779.jpeg
Jan 05, 2023
Complete priming the center top skins
- (2.5 hours)
Category: Finish
Prepped and primed the top center skins and outer side of the fuel pump doublers
502E5B7D-7424-40F0-882B-5E9B68F3805E.jpeg
7E6CE8EB-DCC4-46BC-8B62-2403F22F0C6D.jpeg
14A8D59B-AA25-416B-B585-5411A7B57A24.jpeg
0491BEE5-4A48-44FC-94E5-240FDB6D17E0.jpeg
Jan 02, 2023
Continue riveting top skins
- (3.5 hours)
Category: Finish
Continued riveting the top left outboard wing skin, trained Chris LaBarre, he is now a certified Rosie :-)
Riveted 3/32 down to and including top stiffenters
5FAD82E3-4C67-4DA4-946E-A9A13710A6FA.jpeg
17A3179F-A1B5-4153-984D-488A4B437A48.jpeg
C1BD3DC7-AA0C-4604-ADCC-02A3669C95C0.jpeg
D54B0AB7-CCDC-43BB-A2F7-7CE7A1B9BD06.jpeg
EA8A7B6D-161F-4C5D-B3D5-103CDFA6DC4F.jpeg
Dec 30, 2022
Start closing up wings ”Left outboard”
- (3.5 hours)
Category: Finish
Started installed top wing skins, doing left top outboard, prepped and positioned skin
Ring out outboard wiring
With Ryan riveted top row of rivets
5038F74A-076B-4AD9-8F69-9A8CD10F0FEC.jpeg
05E79107-F566-41C3-9C09-F2B7C1CC4D3B.jpeg
Apr 29, 2022
Complete instrument panel fitting
- (2.2 hours)
Category: Finish
Completed fitting the instrument panel. Fabricated upper braces. Cleaned up outer vertical supports and filled holes for redrilling. Redrilled hikers for vertical supports.
A5E26FDA-546F-424B-BB4D-1923BCB09712.jpeg
Apr 21, 2022
Start fitting instrument panel
- (.7 hour)
Category: Finish
Start fitting instrument panel
C0BE18A6-D414-4E51-AAB9-45A0A7909059.jpeg
Apr 20, 2022
Reassemble control sticks
- (0.5 hour)
Category: Finish
Reassemble control knuckles and sticks, all greased and cotter pins installed
Apr 19, 2022
Clean up control sticks and paint
- (0.5 hour)
Category: Finish
Clean up is drilled holes, debur and paint
Apr 15, 2022
Install control sticks
- (1 hour)
Category: Finish
Installed control sticks, one bolt resulted in being too close to get a nut on so redrilled off axis
04A2EABB-8BFF-4B7C-B468-90399E2AD67F.jpeg
Apr 14, 2022
Drilled remaining firewall flange tabs
- (1.5 hours)
Category: Finish
Drilled the remaining firewall flange rivet holes and debur all holes
9B20D963-C04E-4344-8DB7-C08A3804A2A6.jpeg
506FD1C0-D857-4E98-9678-5330F14D4EC3.jpeg
70A1EDFB-B225-4AF5-98C7-E0BF8A2B20D3.jpeg
Apr 11, 2022
Drill Firewall
- (3 hours)
Category: Finish
With Ryan powers help drilled all fuselage mounting point holes and as many flange tabs as possible
536FAF08-5141-4BEA-95EA-274E2C3C2282.jpeg
Apr 05, 2022
Install instrument brackets
- (.2 hour)
Category: Finish
Installed angle brackets for instrument panel support
Apr 03, 2022
Fabricate instrument panel forward angles
- (0.7 hour)
Category: Finish
Fabricated the forward instrument panel angle bracket, primed
AC14627A-E043-4ADF-AB5B-193BCEB7BE23.jpeg
Mar 31, 2022
Clamp firewall sides for firewall template fittin
- (0.5 hour)
Category: Finish
Clamp the firewall skirts in place to allow for precise trimming of the firewall template
Also painted the flap attach tab
BB795ABC-6F54-495C-86C1-1E0A0DC85708.jpeg
8DE2215F-613D-460C-AF66-5EF60DC268CF.jpeg
1E18D931-275D-4B48-813B-9FF515D0EA28.jpeg
Mar 19, 2022
Fabricate the firewall flanges
- (4 hours)
Category: Finish
Fabricated the firewall flanges from the provided stainless steel material. Trimmed, and drilled the relief holes, cut the tabs, debur all edges and rounded tabs. Then bent the tabs using the brake.
CEB67A88-9AEE-41C0-BAA2-EFFFDC64E280.jpeg
E25AE329-C8CC-442A-9E49-7E00EB1D8146.jpeg
88D87AFF-96E1-42D1-BCC1-0ABE56E40C66.jpeg
B8F419E0-CE7D-421B-A2AE-5503C7785C55.jpeg
Mar 17, 2022
Complete install of seat pan nutplates
- (1 hour)
Category: Finish
Completed installation of the seat pan nutplates, seat pans and inserts are now complete
Mar 16, 2022
Test fit nut plate to see if carbon needs reinforcement
- (0.5 hour)
Category: Finish
Test installed a single nut plate on the seat pans to see if additional carbon is necessary. Looks good
Mar 15, 2022
Drill holes for seatpan screws
- (0.2 hour)
Category: Finish
Drilled 8 holes in each seat pan and insert to allow for securing the seat pan inserts
Mar 14, 2022
Final trim and fit of Fibertech seat pan inserts
- (0.5 hour)
Category: Finish
Trimmed seatpan inserts so they can be installed without removing the seat rails
Mar 13, 2022
Assemble Seat Backs and Rails
- (3.5 hours)
Category: Finish
Assembled the seatback and rail mechanisms per the TWTT instructions
81EFD1EB-7FE9-409E-A42F-F0B2308FFF46.jpeg
79D9B8FB-402E-4658-8564-89ABDFCE3404.jpeg
Aug 07, 2021
Complete floor boards, start seat rails and pan inserts
- (3 hours)
Category: Finish
Installed pilot side floor board
Fitted the inboard and outboard seat rails
Trimmed the pilot and copilot seat pans
Started fitting seat pan inserts, need to trim the inner edges for removal with the inboard seat rails
Jul 26, 2021
Redrill door hinges, trim copilot floor board
- (1.5 hours)
Category: Finish
Redrilled and fit the doors, doors still proud on the bottom edge
Trimmed and fit the copilot floor board
5D419DD4-A072-4BBA-A91B-9AC86507F05B.jpeg
3E8F3D7D-1DFD-42E2-84B6-BBE09ED464CE.jpeg
34C32E4E-F91D-451D-9DA7-439317EF73D8.jpeg
BFAFA6C4-E4FE-408C-A303-7D7D237AAD48.jpeg
906D3CB1-D161-4704-B3D2-1560C76243E1.jpeg
Jul 25, 2021
Fill baggage door and copilot hinges, start floor pans
- (1.3 hours)
Category: Finish
Filled the holes to allow redrilling the hinge holes
Jul 22, 2021
Install aft tunnel cover nutplates
- (1.2 hours)
Category: Finish
Tested the pneumatic rivet squeezer
Installed rivets for aft tunnel cover nutplates
EE42AC42-9EF3-4490-AA4B-48E76BC2AB66.jpeg
3C3AB397-E098-4086-87EF-D29A740ABA94.jpeg
Jul 21, 2021
Seat hinges and nutplates
- (2.2 hours)
Category: Finish
Installed the hinges between the seatback and the seat bottoms
Installed the 4 nutplates for the seatback
Installed the nutplate between the two tunnel covers
042FAE62-2F6A-4963-B7FD-1DB6C6977827.jpeg
314F0C51-F133-43EB-9852-02D141D5CBB2.jpeg
C27B5C9D-E2E4-41C6-B3F2-FBFF8C214ACD.jpeg
7308A02D-41F3-455C-999A-7D114FD61BAC.jpeg
0AF2A32F-D23B-457E-9E5B-6C13197C4B7E.jpeg
19B68C2D-377A-481A-901C-C21BEEEAAB50.jpeg
Jul 20, 2021
Crossover cover and rear seat head rests
- (1 hour)
Category: Finish
Drilled holes for rear seat head rests
Drilled new holes for crossover cover
Drilled and countersunk holes for fwd screws on crossover cover
Install crossover nutplates
701E21F9-7551-4FFF-9369-2C01E865425F.jpeg
4394E44F-9689-4461-87D4-7975576048DA.jpeg
594CEF13-F445-4D7A-B6F9-B02DAADD4F04.jpeg
Jul 18, 2021
Rear seat and crossover cover installation
- (4 hours)
Category: Finish
Installed nutplates for rear of crossover cable
Redrilled and patched crossover cover in front
Installed rear seatback
58D4E0B9-3762-49B0-935C-AB3215C89A91.jpeg
5C07DD8B-B236-41B7-8BDD-98DEACDCB7B1.jpeg
61C92FAB-7042-44A7-80CA-6C75F9557A21.jpeg
736DB8EB-E841-4B24-AB28-90E9664B7FAE.jpeg
9C13DF53-0AFC-42E0-90F3-E329A7F4C69C.jpeg
A6076ECA-5E7F-4853-806A-E98240437792.jpeg
Jul 16, 2021
Installing nutplates, bulkhead A, aft tunnel
- (2.5 hours)
Category: Finish
Started installing nutplates
- Installed nutplates for the bulkhead A closeout
- Installed bulkhead A footrest nutplates
- Installed aft tunnel cover footrest nutplates
- Tried installing nutplates on the LAM angles for the aft tunnel cover but the angle if the floor prevents using the hand squeezer, couldn't get an angle with the rivet gun, going to try a pneumatic squeezer and also ordered a 10 degree offset flush rivet head
5CDBBE57-7813-4D97-BCFB-13B5AE8B9EA9.jpeg
D591CBF9-7905-43DF-B97C-47B3FA47B192.jpeg
Jul 15, 2021
Finish OH Console, drill and place bulkhead A closeout
- (1 hour)
Category: Finish
Removed the overhead console and cleaned off tape
Measured the 16 mounting holes for the bulkhead A closeout
0A7FA720-661A-48A2-B7F2-16F36F0C2493.jpeg
725B5DD8-5763-40F1-A29D-F6892407DD7A.jpeg
9C183748-D038-4B0E-B42C-575547ADFDCF.jpeg
CD6456EB-F519-4AB1-8333-2F1E885B9C35.jpeg
Jul 14, 2021
Prep and Install Overhead console
- (1 hour)
Category: Finish
Sand the paint off the fuselage and install the overhead console. With the help of Iris to position the clamps
5CA6F5AD-8689-4072-95B1-0AD54102D4F3.jpeg
A8BC00F5-87C0-4936-B588-D570E429665C.jpeg
Jul 13, 2021
Complete fitting of Overhead Console
- (1.5 hours)
Category: Finish
Completed fitting the overhead console, drilled lam angles and installed the nut plates
133F9AF7-2E58-475E-AE44-9CF5307494CC.jpeg
D9930DEA-ABA9-48CA-AAED-DE91687ADD23.jpeg
Jul 11, 2021
Completed layups for rear seats
- (2 hours)
Category: Finish
Completed the under layup for the rear seat on the copilot side, after allowing to cure, trimmed the layups
D840135E-7949-433F-9E9B-3F3AA71339D8.jpeg
E86B0859-4635-48E4-BCE1-C9D9688A34EA.jpeg
6667C4A6-B49D-4761-8656-67A87C36670F.jpeg
558D4A01-5647-4FF4-AC4E-B71FF0834D27.jpeg
Jul 10, 2021
More work on layups for rear seat install
- (2.5 hours)
Category: Finish
Continued by doing the under laminate on the baggage door side of the fuselage, also layup for the upper layer on the copilot side
Jul 09, 2021
Install Inner Rear Seat Belt Mounts and First outer seat support
- (3 hours)
Category: Finish
Installed both inner rear seat seatbelt attach mounts, drilled, countersunk and bolted with help from Courtney.
Drilled three tabs that secure footrests to the floor
Made template using 1/8” sheet metal to perform top layup of the baggage door side seat bottom rail
Lay'd up top layer of seat rail, 1 ply of DBM cloth
8D088075-FD7B-4A7F-B708-43776FE2F825.jpeg
517D5248-F26C-4BD9-A942-21EF7B5E6AA8.jpeg
F7F34E7C-6C63-4A99-8B0E-085A17C7CD08.jpeg
93FEE971-4195-408C-8BDA-C3621D8D47F7.jpeg
2A607721-BCE3-4100-93B5-F9D86856FE2D.jpeg
AA843565-4F64-4415-8FAC-B3413C1EB306.jpeg
8D090BA1-D446-4EE5-83C7-C7C9FB775487.jpeg
9638CD74-8691-4968-8E35-B4B3B85B0EF8.jpeg
E0B10A1B-1589-49FA-AE10-BAF651D8F3BC.jpeg
E2CE26F6-2952-43DA-9901-AC201223465A.jpeg
8B3AC151-2E5A-4D5C-9C85-A339964AF648.jpeg
78C8F495-DC57-4EA2-8A47-DF2345F63DC6.jpeg
Jul 05, 2021
Drilled tunnel covers and installed footrests
- (3.5 hours)
Category: Finish
Drilled the side holes for the fwd and aft tunnel covers.
Installed the fwd attach angle
Drilled all but the floor holes on the footrests
Installed outer seat belt angles
6F755378-B399-40B4-A9E7-0CBDF0D573CA.jpeg
46F77E4F-3CDC-46B9-A87D-535DC9435CAB.jpeg
871371B7-0931-4F2E-A274-4F47424315BE.jpeg
75760D7B-ABEA-4A3E-B12C-727103EFB5AB.jpeg
2B48DB63-11D7-410B-83BB-AA30A226ACF1.jpeg
Jul 04, 2021
5
Category: Finish
Trim and shape LAM angles
Measure and install LAM angles
Trail fit tunnel covers and install center rib bracket mount to both fore and aft tunnel covers
90C52EE3-275B-4249-A34A-BC35771ECAE3.jpeg
22ABC84C-1125-4034-A824-6BF481F83A78.jpeg
9378E3B9-12B9-4333-A781-3F601DE39402.jpeg
ABF7C122-9B3B-4953-8422-88E167A1F35F.jpeg
4ECC02B3-B77C-4CA2-881F-F82975948B55.jpeg
5BAC6872-1743-45C8-8621-379C87AA29AD.jpeg
28EDFC3E-6271-4795-A31B-736748EC221A.jpeg
Jul 03, 2021
Layup LAM angles for rear tunnel covers
- (0.5 hour)
Category: Finish
Did the layup for the rest tunnel covers, 1 ply for 7781, 3 DBM, 1 ply 7781
Jul 01, 2021
Start fitting crossover and console covers
- (2 hours)
Category: Finish
Almost completed fitting the crossover cable cover, a little more relief on some edges. Drilled the mounting holes, need hardware.
Started fitting the Chase center console.
8B941573-266A-4917-AB5F-DF03B723D354.jpeg
21F6C388-CC60-4136-83BA-3AD518D0E292.jpeg
367C06EB-FB66-4D67-81F3-BB1A3B26913F.jpeg
May 16, 2021
Touch up door spacers
- (1 hour)
Category: Finish
Added spacers to better fit the doors
May 03, 2021
Touch up and install upper rear sleeves
- (0.7 hour)
Category: Finish
Completed installing the aft upper door sleeves
May 01, 2021
Complete sleeve holes, remount sleeves
- (1.5 hours)
Category: Finish
The resin did not kick, this is not too surprising since I promoted it in July of 2020. The manual says it can be repromoted once so I tried before tossing about 600grams of resin. It worked.
I drilled the copilot side sleeve holes. And removed and cleaned the original two that I had tried yesterday. Remounted the lower main door sleeves and baggage,
732D3883-BC1C-43A5-8B87-0722EBC6A6AC.jpeg
C34D31DB-E36F-4607-9D78-1A68F8119BD2.jpeg
E7A596D3-241D-47DF-B46A-1BC2062EF726.jpeg
64367DBE-05A4-4891-82A6-4815DE70DFE1.jpeg
Apr 30, 2021
Install Main Doors and Start Latch Pin Sleeves
- (4 hours)
Category: Finish
Positioned and drilled the door hinges. Installed the main doors. Cut the pockets for pilot side and baggage door pin sleeves.
Installed the low latch sleeve and baggage door latch sleeve
0F21B492-E730-41FC-ACDC-3E21718BB002.jpeg
Apr 30, 2021
Install door seals for main door
- (1.3 hours)
Category: Finish
Installed the door seals for the main doors
Apr 28, 2021
Hang Baggage Door
- (1.1 hours)
Category: Finish
Fit the baggage door seal and install the baggage door
B96593D4-6D43-4C2D-A86E-8CA7D4DDF6A5.jpeg
7786B887-C0CB-44EA-837C-331DA9337B91.jpeg
Apr 27, 2021
Fit and drill arm rests
- (1 hour)
Category: Finish
Positioned the arm rests, drilled all holes and temporarily cleco in place
B1A11E2A-A923-43E5-A165-63076E35E706.jpeg
14D32627-FEF5-4271-9096-D900954E63B9.jpeg
Apr 26, 2021
Complete Copilot Main Door Assembly
- (3 hours)
Category: Finish
Completed Copliot door, drilled center latch hole, latch tab and lock barrel. Assembled latch assembly
1D2D35E5-D443-4EA5-9870-CCC6C3A12EA3.jpeg
10DB0957-5443-494E-8026-C52557273911.jpeg
Apr 25, 2021
Completed pilot side main door latch assembly
- (4 hours)
Category: Finish
Completed assembly of the pilot side main door assembly. Installed the door lock. Installed all three pins and the hinges onto the door
7D78DB8B-76D6-4133-B0A4-A232108297C7.jpeg
09C1F21F-1666-4771-BB69-44650BCFD630.jpeg
FC6B1979-FB8A-4F54-A25F-8221024D8628.jpeg
Apr 24, 2021
Start assembly of the pilot door mechanism
- (1.5 hours)
Category: Finish
Began assembly of the pilot side door, started by drilling out the center hole for the latch mechanism and the square hole for the latch lock mechanism
F0A8F6D7-DBE1-485B-98FF-E2C759BAF971.jpeg
485404B9-BC8D-412D-9E97-8AD709199DED.jpeg
5968BE4C-3824-4060-AAA2-89BDE926A2CB.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.