Project: Serg   -  
            Listing for Category : fuel system
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Sergio Desiati   -  
Project:   Bearhawk - Patrol   -   VIEW REPORTS
Total Hours:285.2
Start/Last Date:Aug 31, 2019 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=Serg

Home or Last Project Picture

Nov 08, 2019     Fuel lines - (2 hours)       Category: Fuel System
Finished the fuel lines to the fuel selector. Everything aligns very well, with no binding on the fittings. Also trimmed the floor sheet-metal to allow space for the fuel lines and grommets.


 
Nov 04, 2019     Fuel lines - (5 hours)       Category: Fuel System
Fitted all 4 fuel lines to the T fitting. All bends look good, and flares line up very well with fittings. Also drilled holes to mount the gascolator; cut aluminum floor for fuel selector standoff. Productive day!


 
Nov 02, 2019     Fuel selector - (4 hours)       Category: Fuel System
Decided on final positioning of fuel selector. Fitted it to aircraft, and installed all nut plates. Also installed nut plates for instrument panel, and drilled nut plate tabs for firewall... waiting on more nut plates to show up so I can finish.


 
Oct 25, 2019     Fuel lines - (2.0 hours) Category: Fuel System
Started bending and fitting fuel lines from the wing root to the fuel selector. Slow progress.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.