Project: Serg   -  
            Listing for Category : wings
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Sergio Desiati   -  
Project:   Bearhawk - Patrol   -   VIEW REPORTS
Total Hours:285.2
Start/Last Date:Aug 31, 2019 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=Serg

Home or Last Project Picture

May 24, 2020     Flap controls - (3.7 hours)       Category: Wings
Replaced all flap hardware with drilled bolts, and castellated nuts. Clearanced flap cables and fittings in wing root; all very close as per plan, but adequate clearance! Pretty happy with that. I also fitted the left wing aileron and flap bearings... five less small loose parts!


 
May 11, 2020     Aileron/flap hinges - (1.7 hours)       Category: Wings
Installed right hand side hinge bearings. Started fitting right hand side aileron hinge brackets.


 
Apr 24, 2020     Aileron cables - (.5 hour)       Category: Wings
Installed aileron cable pulley guards... and the pictures I promised of the finished aileron and flap control sistems.


 
Apr 23, 2020     Flap/aileron controls - (3.2 hours) Category: Wings
Cut extra clearance in right wing ribs for aileron on crossover cable. Installed correct hardware for aileron pulleys and bellcranks. Aligned and drilled flap torque tube; installed all bolts and springs... all looks great and in perfect alignment. All I have left to do is attach the cables coming from the fuselage, but I need to get more swaging supplies.
 
Apr 22, 2020     Aileron controls - (5.8 hours) Category: Wings
Fabricated all aileron cables; staged all terminations and checked with go/no-go gauge. Pulled some tension and all works as it should. The crossover cable still rubs some of the ribs; that will be addressed tomorrow... lots of pictures to follow.
 
Apr 21, 2020     Aileron controls - (2.8 hours) Category: Wings
Installed aileron pulleys and bellcranks. Began running cables from control stick to aileron bellcranks.
 
Apr 21, 2020     Aileron controls - (2.8 hours) Category: Wings
Installed aileron pulleys and bellcranks. Began running cables from control stick to aileron bellcranks.
 
Apr 20, 2020     Wing hardware - (1.5 hours)       Category: Wings
Checked all wing hardware for spec; I had to replace just a few washers here and there, to get the required threads showing beyond locknuts. Torqued everything, and applied
Viz Torque.


 
Apr 19, 2020     Cables - (1.4 hours) Category: Wings
Fitted aileron bellcrank bearings; cut and swaged flap cables from Y split to wing control arms.
 
Apr 18, 2020     Opened wings - (1.8 hours)       Category: Wings
Opened wings, removed and inventoried all parts, cleaned/dusted inside wings, and clecoed them shut. I have a good amount of reading to do before I start work here.


 