Project: Serg   -  
            Listing for Category : controls
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Sergio Desiati   -  
Project:   Bearhawk - Patrol   -   VIEW REPORTS
Total Hours:285.2
Start/Last Date:Aug 31, 2019 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=Serg

Home or Last Project Picture

Jan 26, 2020     Rudder cables - (2.3 hours)       Category: Controls
Installed rudder cables and turnbuckles. All good!


 
Dec 08, 2019     Throttle quadrants - (.5 hour)       Category: Controls
Fitted forward and aft throttle quadrants.


 
Oct 24, 2019     Rudder control - (3.5 hours)       Category: Controls
Installed toe brakes, both master cylinders. Fabricated and swaged router control cables to aft of cargo compartment. All swages within spec.


 
Oct 23, 2019     Flap cable - (2.1 hours)       Category: Controls
Apparently I really needed practice with swaging. It took four tries to get the two ends of the cable swaged. Very happy with the outcome now.


 
Oct 23, 2019     Pulleys - (1 hour)       Category: Controls
Installed aileron and flap control pulleys.


 
Oct 22, 2019     Pulley guards - (1.1 hours)       Category: Controls
Fabricated pulley guards from .032... Took a while to get the measurements right, but eventually found an ideal forming block to make these.


 
Oct 21, 2019     Stick carrier - (2.3 hours)       Category: Controls
Finished installing stick carrier, and connected to primary elevator pushrod. Nut and bolt clearance inside stick carrier was very tight and required cutting and drilling bolts to custom length. I am very happy with the outcome.


 
Sep 29, 2019     Stick carrier - (2.5 hours)       Category: Controls
Fitted and installed control stick carrier and elevator idler arm. Installed more fairleads. Missing 3 from hardware kit.


 
Sep 28, 2019     Flap handle - (2.3 hours)       Category: Controls
Fitted and installed flap handle assembly.


 
Sep 08, 2019     Brake pedals - (0.5 hour) Category: Controls
Fitted and installed front and rear brake pedals.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.