EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Serg
-
Listing for Category : landing gear
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (110)
Research
Workshop
- (3)
Empennage
- (4)
Fuselage
- (62)
Firewall
- (5)
Tail Feathers
Wings
- (10)
Controls
- (10)
Avionics
Lighting
Instrument Panel
Landing Gear
- (8)
Engine
Propeller
Fuel System
- (4)
Interior Finish
- (4)
Paint / Decals
Inspection
Tools
Builder Name:
Sergio Desiati
-
Project:
Bearhawk - Patrol
-
VIEW REPORTS
Total Hours:
285.2
Start/Last Date:
Aug 31, 2019 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=Serg
Home or Last Project Picture
Apr 05, 2020
Brake lines
- (2.1 hours)
Category: Landing Gear
Upper brake lines installed; they are just sitting inside the boot cowl for now... the next time I take it apart, I will secure the lines and install parking brake valve. I also prepared some parts for the windshield installation.
81AC659C-3296-4435-8BE0-E6C3D9B826ED.jpeg
A0E812E7-D7D6-4403-8F10-3660C38D30A1.jpeg
D27B8503-3125-4905-9DDE-47CAD858A3FF.jpeg
Apr 04, 2020
Brake lines
- (1.7 hours)
Category: Landing Gear
Installed 36braided ircraft specialtybrake lines in gear legs. All looks great.
1F8D1A43-2D52-4908-8578-CA7883A68D49.jpeg
A7526E18-7B4D-4E22-9FAD-28F17098495E.jpeg
Feb 02, 2020
Gear leg fairings
- (2 hours)
Category: Landing Gear
Well, third time is the charm for the left gear fairing. Good result this tome. I also fastened the aft portion on both sides.
30CE2D2A-4065-4658-AB00-6F9FF4DFDDA6.jpeg
FD98DA64-9DE9-48FE-BB96-CBD2342CA796.jpeg
Jan 31, 2020
Gear leg fairings
- (3.6 hours)
Category: Landing Gear
Back to the drawing board for the gear leg fairings. Cut narrower ones out, and they fit much better. Since I got so good at installing nut plates, I installed 20 more for the gear leg fairings.
A0C7B8A6-BE1F-420B-BD44-BEE35097DEFF.jpeg
Jan 27, 2020
Gear leg fairings
- (2 hours)
Category: Landing Gear
Started working on the gear leg fairings.
Oct 20, 2019
Installed brake calipers
- (1.3 hours)
Category: Landing Gear
Installed brake calipers; plenty of space for four AN5 bolts per side. Drilled both axles for cotter pin.
39EA7275-52A7-4C61-BEB4-7A9A657AA1CD.jpeg
47F52EFB-0036-47E4-B23C-795054F39036.jpeg
B6416FCF-2C08-43B6-AF2C-9506685227D9.jpeg
Sep 07, 2019
Brake torque plates
- (1 hour)
Category: Landing Gear
Drilled all holes for brake caliper torque plates. I need hardware!
Sep 02, 2019
Landing gear
- (2 hours)
Category: Landing Gear
Built up main gear struts and installed gear on fuselage. Hardware store nuts/bolts will be replaced during final assembly!
IMG_0579.jpeg
IMG_0006.jpeg
IMG_0203.jpeg
IMG_0204.jpeg
IMG_0310.jpeg
IMG_0311.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.