Project: Serg   -  
            Last 10 Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Sergio Desiati   -  
Project:   Bearhawk - Patrol   -   VIEW REPORTS
Total Hours:285.2
Start/Last Date:Aug 31, 2019 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=Serg

Home or Last Project Picture

May 24, 2020     Flap controls - (3.7 hours)       Category: Wings
Replaced all flap hardware with drilled bolts, and castellated nuts. Clearanced flap cables and fittings in wing root; all very close as per plan, but adequate clearance! Pretty happy with that. I also fitted the left wing aileron and flap bearings... five less small loose parts!


 
May 11, 2020     Aileron/flap hinges - (1.7 hours)       Category: Wings
Installed right hand side hinge bearings. Started fitting right hand side aileron hinge brackets.


 
May 09, 2020     Windshield - (3 hours) Category: Fuselage
Trimmed upper forward skylight/windshield former, trimmed windshield edges to match, bodywork on windshield fiberglass faring.
Also replaced some small aileron linkage hardware.
 
May 09, 2020     Windshield - (3 hours) Category: Fuselage
Trimmed upper forward skylight/windshield former, trimmed windshield edges to match, bodywork on windshield fiberglass faring.
Also replaced some small aileron linkage hardware.
 
May 06, 2020     Skylight - (.9 hour) Category: Fuselage
Fitted skylight center support. Short day today.
 
May 04, 2020     Skylight - (3.7 hours)       Category: Fuselage
Fitted and installed aft skylight former, and dorsal stringer.


 
May 01, 2020     Window frames - (3 hours)       Category: Fuselage
Finished right hand side window. Everything fits perfectly; very happy! In one of the pics, you can see an early panel mockup... it's nice to start visualizing, but I've got a ways to go before any of that gets really considered. Skylight is next!


 
Apr 29, 2020     Window frames - (3.2 hours)       Category: Fuselage
Fitted right side window sheet metal and clecoed to tubing. Acrylic cut to size. I need to finish fitting angle backing, then I can drill acrylic for bolts. Getting there!


 
Apr 28, 2020     Side windows - (3.3 hours)       Category: Fuselage
Today I finished the left window; all parts are ready for interior paint, and final assembly. I also swaged the two flap cables where they attach to the control horn in the wing root. This is going to need a little more work for clearance, but all seems to work very well. Right window next!


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.