Project: CH750-SR   -  
            Listing for Category : Show all entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Skip Rhudy   -  
Project:   Zenair - CH 750   -   VIEW REPORTS
Total Hours:551
Total Flight Time:
Total Expense:N/A
Start/Last Date:Sep 17, 2019 - No Finish Date
Engine:Corvair
Propeller:Sensenich W642KL-35GS
 
Friendly URL: https://eaabuilderslog.org?s=CH750-SR

Home or Last Project Picture

Apr 25, 2023     Panel Layout - (36 hours)       Category: Instrument Panel
The pictures gathered here show the end stage of the panel design development. It was driven by two primary factors: 1) Requirements of a minimal Corvair engine driven aircraft, 2) Engine control and instrumentation layout similar to C150/152 which I did my primary flight training in and will no doubt fly in from time to time. Development of this panel has gone through multiple iterations and the final version shown here as design drawing is based on analysis of circuit requirements for running the Corvair engine's critical electrical systems (ignition and power generation) and the non-critical electrical systems (lighting and avionics). I decided for traditional panel over software driven multi-display systems, though power and space is provided for COTS devices to run foreflight. I have spent at least 36 hours on the design and accumulation of tools and materials which converge on the panel itself. All electrical is being installed to standards defined in AC 43.13-B


 
Apr 21, 2023     Forward Fuselage - (1.5 hours)       Category: Fuselage
Prepare forward fuselage floor for buildup and installation.


 
Apr 05, 2023     Seat Pan Support Area - (2 hours)       Category: Fuselage
Marked (with a rivet spacer fan) and drilled holes in seat pan support panels / support brackets prior to install. Drilled out all holes to final size and then deburred all holes. Drilled extra attach holes in both vertical support channels on the rear fuselage because lower left / lower right holes have AN nuts so close behind the hole that rivet installation is not possible from outside, and inside the channel the rivet gun head will not fit. The extra hole is in middle of bottom row and make up for the missing outside lower rivet.


 
Apr 04, 2023     Seat Pan Support - (2.5 hours)       Category: Fuselage
Outboard seat pan supports have to be drilled to fasten the seat pan down. A5 pitch 40 rivets are used. Pilot holes #40, then drilled out to A5 size. Not deburred yet.

Also drilled out the pilot holes for the lower seat belt harness attach point, starboard and port sides.


 
Apr 01, 2023     Nut Repair - (5 hours)       Category: Fuselage
Minor travails and new access panels to very tight spaces:
When drilling a hole through the side channel upright on my fuselage, down by the landing gear fitment where the holes go to attach the seat pan, I noticed that the drill seemed to not want to go through the sheet-metal -- about like when metal is a bit thicker. So I used a little bit more force. But it turned out it wasn't sheet-metal. On inspection I saw that I had drilled into the nut of the top AN 4 bolt of the rear part of the starboard fitment that connects the front fuselage to the rear fuselage. I couldn't tell how deep I had drilled into the nut or maybe even the bolt. I was unwilling to ignore potential damage to part of the system that connects the rear fuselage to the front (everything might NOT be all right). So began an hours long endeavor to remove the bolt and nut to inspect and replace. It involved getting a 20 ton press, buying a wrench or other tool that I could bend in the press to a U-shape to be able to get back behind the side channel via the narrow area left between baggage floor and seat pan rear support. I knew that I could put an access panel instead and approach it that way. But I started with the "make your own tool way". I managed to remove the nut from the bolt, but had so much trouble getting a new one back on with a washer. Then my custom wrench head got stuck. I was forced to make an access panel. Once the access panel was open it took a whole 2 minutes to remove the stuck tool and reinstall the bolt and torque it correctly.


 
Mar 01, 2023     Critical Electrical And Panel Area - (15 hours)       Category: Landing Gear
Bought 4x8 sheet of .025 from Airparts. Didn't have metal brake so used rubber mallet method of bending instrumentation wiring support pans between firewall and panel. Bent against grain by accident, however do not believe will be a problem given the non-structural nature and very low weight of service loops of wiring the pans will support. The battery, contactor, and distribution bus is mounted behind the passenger seat. Battery location reinforced with .092 extruded L and wrapped tight with sheet metal to resist high g loads in sudden stop situation. Fabrication and planning of these items took a long time. Acquired a small sheet metal bender for the smaller brackets that the bus and the contactor are mounted on. Used .016 L-angle as "finger" to get appropriate bend radius on those items. Used rubber mallet to create flange that cheap metal brake design doesn't support.


 
Feb 11, 2023     Landing Gear / Wheels / Tires - (3.5 hours)       Category: Landing Gear
Assembled wheels into tires. Ran 1/16 in. bead of Permatex Ultra Grey (82194) high torque gasket maker around the face of one side of the wheel assembly to ensure no leakage between wheel halves. Placed lower wheel on 2x4 wood blocks under tire. Placed upper wheel half onto lower and bolted tight with all six bolts. Then placed the rubber o-ring at the wheel join. Used a lot of watery dish soap as lubricant during tire inflation, used ratchet strap to compress center of tire during inflation to seat bead onto rim.

Gear installation preceded tire / wheel assembly.


 
Jul 21, 2022     Hangar Move In, Part One - (4 hours)       Category: Workshop
Build rack to hold completed airframe subcomponents. Move engines to hangar.


 
Jul 15, 2022     Hangar Rented - (2 hours)       Category: Workshop
Found a commericial hangar at KRVS in Tulsa. Rented from Bill Denton, Denton and Associates LLC. Bill is a recipient of the Charles Taylor Mechanic Award.


 
Jun 12, 2022     Rear Fuselage - (2.5 hours)       Category: Fuselage
Installing flaperon actuator mount plate (flap function) and control tubes for flaperons (aileron function).


 
May 03, 2022     Rear Fuselage - (1.5 hours)       Category: Fuselage
Preparing rear fuselage baggage area rear panel for installation.


 
Feb 21, 2022     Rear Fuselage - (10 hours)       Category: Fuselage
The fuselage pieces, which have been riveted as subcomponents, are here assembled according to Zenith instructions and readied for riveting.


 
Jan 27, 2022     Fuselage Sides - (3 hours)       Category: Fuselage
Setting up L-angle and longeron on the passenger and pilot fuselage side skins. Also fit the rear fuselage front upright to the front edge of the fuselage. These parts are match drilled but have to be deburred and, on occasion, chased, before riveting.

Also shown is the William Wynne Corvair flight engine in temporary storage before installation. Each day it gets lovingly dusted.


 
Dec 22, 2021     Fuselage Top - (1.5 hours)       Category: Fuselage
Various L-angle placement and trimming, baggage support. Some holes need to be drilled out to size, deburred.


 
Dec 21, 2021     Fuselage Top - (1 hour)       Category: Fuselage
Drilling, deburring. Re-clecoing.


 
Dec 20, 2021     Fuselage Bottom and Top - (3 hours)       Category: Fuselage
Riveted fuselage bottom pieces together: longerons and z channel around the access hatch. Layout top fuselage skin and longerons. Cleco together.


 
Dec 16, 2021     Fuselage Bottom - (1.7 hours)       Category: Fuselage
Laying out z channel on bottom of fuselage. The note about missing part was wrong.


 
Dec 14, 2021     Fuselage Bottom - (1.5 hours)       Category: Fuselage
Attaching fuselage bottom to the longerons. Parts in storage. They were soon to be moved to Tulsa, OK in March.


 
Dec 03, 2021     Pilot Side Wing - (1.5 hours)       Category: Wings
Wing complete.


 
Nov 16, 2021     Pilot Side Wing - (2 hours)       Category: Wings
More wing root work. The sheet metal is now fully in place. It will not be riveted in until final assembly when the wings have been attached to the fuselage, the controls rigged, and all connections tested (including fuel lines).


 
Nov 08, 2021     Pilot Side Wing - (1.5 hours)       Category: Wings
Wing root sheet metal work.


 
Oct 24, 2021     Pilot Side Wing - (2.5 hours)       Category: Wings
Connector to plug into AeroLED wingtip lights.


 
Oct 23, 2021     Fuel Line - (3 hours)       Category: Wings
Used Earl's tooling to fabricate braided steel fuel lines using Earl's AN fittings. Used proper tools (line cutter and fitting clamp). Leak test with 100LL to follow.


 
Oct 20, 2021     Build and Install Fuel Tank - (4 hours)       Category: Wings
Wing was a lot easier the second time; should be done with this wing soon. The deeper consideration, basic learning, tool and part acquisition was on the first wing. This one is all about refinement and getting better at doing something the second time through.

Installed fuel sender with appropriate aviation grade sealant.

Wired according to plans and crimped according to 43.13-1b.


 
Sep 27, 2021     Pilot Side Wing - (2 hours)       Category: Wings
More drilling to final size and deburring.


 
Sep 25, 2021     Pilot Side Wing - (1.5 hours)       Category: Wings
Leading edge skin work.


 
Sep 09, 2021     Pilot Side Wing - (15 hours)       Category: Wings
Front skins and trailing edge work.


 
Aug 24, 2021     Pilot Side Wing - (3 hours)       Category: Wings
Bottom skin and rear channel riveting.


 
Aug 06, 2021     Pilot Wing - (2.5 hours)       Category: Wings
Working on drilling, deburring, and riveting front ribs. In last picture the main spar attachment for the struts is visible. It was attached with AN-4 bolts and nylon lock nuts per instructions.


 
Aug 04, 2021     Pilot Side Wing - (1.5 hours)       Category: Wings
Initial skeleton of pilot side wing.


 
Jul 23, 2021     Pilot Wing Skeleton - (2 hours)       Category: Wings
Cleco together the pilot side wing skeleton, attach both front and rear ribs, attach the rear spar and prepare for riveting.


 
May 29, 2021     Wing Root - (3 hours)       Category: Wings
Wing root fabrication and sheet metal install. Required using fluting pliers. Clamp root skin into place. Drill #40 pilot holes into fluted support l-angle and cleco.


 
Apr 19, 2021     Nutplates in Wing Access Panel - (1.5 hours)       Category: Wings
Drilling nutplate holes for fuel tank access panel using standard jig tool.


 
Mar 14, 2021     Engine on Test Stand - (8 hours)       Category: Engine
At William Wynne's hangar, supervised top-end build and test run. Finished installing: Oil pan, starter bracket / ground bar, starter. Filled with oil. Put on test stand and rotated prop for 30 minutes by hand while running oil pump with drill adapter. Installed distributor at correct test run position.

Test run commenced about 300pm. Engine started within 2 seconds. Ran at varying RPM for 30 minutes.

Adjusted heavy duty oil pump bottom plate to account for slightly stiff rotation to bring it into a level of resistance to rotation that is consistent with other engine builds. Removed from test stand and prepped engine for transport back to Texas.


 
Mar 13, 2021     Top End / Accessory Attachment - (9 hours)       Category: Engine
Assembled top end of motor at William Wynne's hangar as supervised build. These components assembled as per specification in the SPA Corvair Engine Assembly Manual except when William recommended and showed newer, improved methods.


 
Feb 27, 2021     Final engine assembly prep - (2 hours)       Category: Engine
Ensure all tools and materials per the final assembly list in the SPA Corvair Engine Assembly Manual and per William Wynne's required tools and materials list put together and made ready to transport to Green Cove Springs, Florida.


 
Jan 23, 2021     Passenger Wing - (2.5 hours)       Category: Wings
Finish up riveting bottom skin on passenger wing.


 
Jan 20, 2021     Passenger Wing - (1 hour)       Category: Wings
Preparing to rivet bottom skin of passenger side wing to the skeleton. Beginning the rivet process.


 
Jan 09, 2021     Skin on Wing - (3.5 hours)       Category: Wings
Unpack bottom wing skin for installation. Place skin with clecos. Rivet skin into place in all pre-drilled holes.


 
Jan 08, 2021     Rear Spar Work - (1.7 hours)       Category: Wings
Fastened inboard and outboard rear spar together. A5 rivets in doubler.


 
Dec 06, 2020     Starboard Wing Skeleton Assembly - (2.5 hours)       Category: Wings
Unpacked the wing skeleton from the crate, organized parts and set them aside in order of assembly.

Clecoed wing ribs to main and trailing spar. Checked for level.


 
Dec 05, 2020     Slats and Flaperons - (1.5 hours)       Category: Wings
Installing tips


 
 
Nov 16, 2020     Slats - (1 hour)       Category: Wings


 
Nov 13, 2020     Slats - (6 hours)       Category: Wings
Further assembly of slats. This was a bit trickier than I thought and it didn't come together until I figured out the correct order to attach the clecos.


 
Nov 11, 2020     Slats - (2 hours)       Category: Wings
Attaching the doubler to the slat front top / bottom bend.


 
Nov 10, 2020     Slats - (2 hours)       Category: Wings


 
Oct 30, 2020     Flaperons - (1 hour)       Category: Wings


 
Oct 29, 2020     Flaperons - (1 hour)       Category: Wings


 
Oct 21, 2020     Harmonic Balancer Final Install - (.5 hour)       Category: Engine
Note to self: Write SPA a note about their install documentation. 2 inch install bolt does not penetrate far enough into crankshaft to tighten balancer down correctly (at least on my crankshaft). Stripped two inch bolt.


 
Sep 27, 2020     Piston / Cylinder Install Prep - (1 hour)       Category: Engine


 
Sep 22, 2020     Piston / Cylinder Install Prep - (1 hour)       Category: Engine


 
 
Aug 20, 2020     Inventory - (2 hours)       Category: Fuselage


 
Aug 01, 2020     Elevator Riveting - (2.5 hours)       Category: Empennage
Riveted the elevator closed. Riveted top and bottom and back center bracket onto elevator. Did a demo video of riveting, but rivet gun was angled badly. So it's a nice video of how to NOT rivet. Decided to drill out, caused hole problems. Was going to do a doubler, but decided not to in the end. A5 seems okay. Would have been better to leave it not seated perfectly. Made note to check this out often during inspections. Will replace if any issue shows up. But it is not a high stress point and nothing will happen if it fails in flight (which it won't). One of 3 minor drilling mistakes on the elevator. And, as usual, it was done in haste not taking enough time to think about what I was doing (that is ALWAYS the root cause of errors so far).


 
Jul 31, 2020     Elevator - (1 hour)       Category: Empennage


 
Jul 29, 2020     Elevator - (2 hours)       Category: Empennage
Reassembled for final riveting. Fattened WRONG hole of an L angle tab that connects the spar with the port elevator end rib. Simply drilled another rivet hole enough below to work. Painted elevator hinges to inhibit corrosion. Riveted skeleton. Riveted wire to front spar.


 
Jul 27, 2020     Elevator - (1 hour)       Category: Empennage


 
Jul 27, 2020     Elevator - (1.5 hours)       Category: Empennage
Place servo into the correct location, set the length of the clevis rod, attach to trim tab, and begin testing and adjustment to get to best travel distance for up and down deflection targeted in the plans. This servo Zenith shipped does not have quite the range specified in the plans though. I'm within 5 degrees up and 8 down. I'll enter exact numbers in a later entry. Run the wire out to the center section of the elevator. Link to test on youtube: https://youtu.be/F_ooA6mKN88



 
Jul 26, 2020     Elevator - (2 hours)       Category: Empennage
Set up nutplates around access hole. Place and mark. Drill. Rivet (3/32)


 
Jul 25, 2020     Elevator Servo - (1.5 hours)       Category: Empennage
Put heat shrink tubing onto servo electrical wire connections. Drilled out access cover plate holes to A5 rivet size (5/32), because the nut plate holes are 8-32 size. Safety wire pliers arrived.


 
Jul 23, 2020     Servo Wiring - (1 hour)       Category: Empennage
Use DMC crimper to crimp D-subminiature connectors onto Ray Allen Servo wires. Note colors / markings for future routing of wires up to cockpit!


 
 
Jul 18, 2020     Elevator Deburring - (2 hours)       Category: Empennage
Deburring elevator holes. Electrical stuff for Ray Allen Servo wire connecting starting to arrive (after much research).


 
Jul 17, 2020     Elevator       Category: Empennage


 
Jul 15, 2020     Elevator - (2 hours)       Category: Empennage
Final drilling to A4 for a few remaing holes. Needed angle drill. Disassemble for deburring. Drilled out nose rib for electrical wire grommet. Cylinder hold down clamps fabricated. Received DMC crimper.


 
Jul 09, 2020     Elevator - (2.5 hours)       Category: Empennage
I have finished all the drilling, and built the control arm to the correct length to control my trim tab with the Ray Allen servo. This necessitated figuring out the in and out wiring, and measuring distances on the servo actuator arm to make sure I got it just in the middle for installation. A 9V battery runs in in and out. I recorded the polarity for both on the data sheet. Ready for inspection to make sure I didn't miss something, then disassembly and deburring.


 
Jul 08, 2020     Elevator Servo Placement - (2 hours)       Category: Empennage
I've had the most fun with this servo, where I went off and did a fair bit of learning about aircraft wiring: https://corvair750.com/diary/07-02-2020-aircraft-wiring/

Spent some happy time in the shop drilling the holes for the Ray Allen servo used for trim tab control.


 
Jun 27, 2020     Painting Cylinders and Studs - (1.5 hours)       Category: Engine
Painted some cylinders and painted also the head studs. Head studs can tend to rust so I just painted them over flat black. Same with cylinders, they are prone to rust without paint. High temp engine paint with ceramic -- 500 degree. Note ingenious paint fixture, credit to Billy Kerchner who is building a Corvair powered Sonex (see his posts on WW FlyCorvair facebook group).


 
Jun 26, 2020     Cylinder cleaning - (2 hours)       Category: Engine
Finished control arm / clevis opening with filing. Then, change of pace: Working on prepping my 3.0L cylinders for installation on my short block Corvair. This is preparation for painting. Was concerned about the step area along the cylinder skirt and asked William Wynne about it. The gasket in that area is RTV green, about a 1/16 bead. No worries there. The areas near the step that are machined out near the stud channels are there so the cylinder does not vibrate against the stud in operation.


 
 
Jun 25, 2020     Elevator Trim Tab Control       Category: Empennage
Drilling and forming the trim tab control arm hole on the trim tab spar. Starting to figure out the Ray Allen control servo.


 
Jun 20, 2020     Elevator - (1.5 hours)       Category: Empennage
More drilling of elevator in tight spots, drilling out to A4 and finished bracket work.


 
Jun 18, 2020     Elevator work - (2 hours)       Category: Empennage
I had to order an angle drill because it's just not possible to drill out some holes in the elevator without one. Trying to use a regular drill risked dinging up the spars and skins. So part of the delay of getting the elevator put together was researching tools. In this case the nice angle pneumatic drill. Definitely worked as needed once I got all the bits I needed which I hadn't ordered when I originally ordered the drill ...


 
Jun 14, 2020     Elevator, Trim Tab, and Engine Stand - (2 hours)       Category: Empennage
Worked on the elevator trim tab, and drilling out holes to A4 and A5 and then put together the engine stand. Coffee kept me up late this night.


 
Jun 12, 2020     Elevator Trim Tab - (1.5 hours) Category: Tail Feathers
Drilled out to A4 and clecoed the trim tab into position. youtube:
 
Jun 10, 2020     Parts from Green Cove Springs - (.5 hour)       Category: Engine
Received various engine parts for Corvair powerplant.


 
Jun 08, 2020     Elevator and Engine Parts Inventory - (4 hours)       Category: Tail Feathers
Worked on the passenger side nose skin (in some pics elevator is upside down -- trim tab is pilot side). And the cylinder kit for my 3.0L engine. Once the elevator is done I'm moving on to engine construction, get the cylinders and pistons in. Then also got the trim tab placed and ready for drilling.


 
Jun 05, 2020     Elevator Nose Skin / Engine Components - (2 hours)       Category: Tail Feathers
More drilling on elevator nose skins (dimple drill first, then remove and drill all the way for proper alignment). Fit perfect, drilled out to A4.

Corvair engine parts arrived from SPA.


 
Jun 03, 2020     Elevator Trim Tab Channel / Nose Skin Placement - (3 hours)       Category: Tail Feathers
Got trim channel drilled out and placed. Started nose skin placement. Came up with a way to get holes on skin drilled perfectly even though removing the clecos on the spar leads to minor (.5 to 1 mil) misalignments of spar and tip rib. Basically: do not drill all the way through the skin with the slightly misaligned skeleton because the skeleton would have possibly misaligned holes with skin. Drilled part way through skin, removed, drilled rest of way. Worked perfect: Absolute alignment of holes in skin and skeleton when clecoed together. (have vid hopefully on youtube someday ...


 
Jun 02, 2020     Elevator - (1 hour)       Category: Empennage


 
Jun 02, 2020     Trim Tab Channel - (1 hour) Category: Tail Feathers
Cut new block and sanded so I could use mallet on trim tab channel to make it fit outboard tip rib.
 
Jun 01, 2020     Trim Tab Channel Issue - (1 hour)       Category: Tail Feathers
Ran into a problem with the trim tab channel. My solution of whacking on the aluminum a bit to get the "joggle" of the outboard part of the channel smaller to fit into the tip rib correctly was verified by Roger Dubbert at Zenith via email. Measuring, making a form block. The outboard side was about 2 mils to wide ...


 
May 28, 2020     Cylinder Assembly Research - (1 hour)       Category: Engine
Cylinder assembly reading, SPA manual pp124 to pp143


 
May 25, 2020     Horizontal Stabilizer - (2 hours)       Category: Empennage
More work on elevator, which is more delicate and complicated than I expected. Ordered a pneumatic angle drill because of tight quarters drilling so I can avoid drilling errors / damage to parts with drills that are too big. Ran into an issue with the CH750 prefab tip ribs not fitting correctly with the trim tab channel ends, which are slightly bent to accommodate fitting inside the tip rib flanges. Aligning the center of the trim tab channel flange properly with the third hole in the tip rib causes the tip rib flange to bulge considerably. So I have a technical question submitted to Zenith about it.


 
May 23, 2020     Elevator - (2 hours)       Category: Empennage


 
May 20, 2020     Horizontal Stabilizer - (1.5 hours)       Category: Empennage
Setting up elevator hinge pins for drilling, cut one too much based on watching the homebuilthelp video. Had to order replacement as I was unwilling to compromise on strength in this area, though honestly I don't think stress tolerances would have changed much. But I didn't do calculations so .... Pictures show difference between cut and uncut. I didn't like that the A5 holes on the end would be so close to the cut end. Even though it's was within acceptable minimum distances for the material.


 
May 15, 2020     Elevator Work - (2 hours)       Category: Empennage


 
May 13, 2020     Assembly Research - (1 hour)       Category: Engine
Studied cylinder assembly procedure. pp103 to pp 124


 
May 11, 2020     Corvair 3.0L Cylinder Set - (.5 hour)       Category: Engine
Ordered 3.0L Corvair Cylinder Set for TZero


 
May 09, 2020     Elevator       Category: Empennage


 
Apr 30, 2020     Horizontal Stabilizer - (2 hours)       Category: Empennage
Elevator skeleton construction and some skin placement.


 
Apr 22, 2020     Horizontal Stabilizer - (1 hour)       Category: Empennage
Layout of elevator skeleton and begin cleco-ing together.


 
Apr 19, 2020     Horizontal Stabilizer - (3 hours)       Category: Empennage
Riveting the top skin onto the stabilizer skeleton. Finished it up!


 
Apr 17, 2020     Horizontal Stabilizer - (2 hours)       Category: Empennage
Reassemble for riveting.


 
Apr 15, 2020     Horizontal Stabilizer - (3 hours)       Category: Empennage
Deburring the pieces.


 
Apr 13, 2020     Horizontal Stabilizer - (2.5 hours)       Category: Empennage
Drilling skins and clecoing with good straps.


 
Apr 12, 2020     Horizontal Stabilizer - (1.5 hours)       Category: Empennage
Straps that don't work. Must have ratchet type.


 
Apr 11, 2020     Horizontal Stabilizer - (2 hours)       Category: Empennage
Bottom skin work, drilling.


 
Apr 09, 2020     Horizontal stabilizer - (1.5 hours)       Category: Empennage
Working on tip rib angles and skin drilling.


 
Apr 07, 2020     Corvair 110HP head overhaul - (.5 hour)       Category: Engine
Ordered 110HP head overhaul from Sport Performance Aviation.


 
Apr 07, 2020     Stabilizer - (1 hour)       Category: Empennage
Tip rib placement


 
Apr 06, 2020     Horizontal Stabilizer - (2.5 hours)       Category: Empennage
Stabilizer ribs. Nose and center section.


 
Apr 05, 2020     Horizontal Stabilizer - (1.5 hours)       Category: Empennage
Stabilizer front brackets. Stabilizer tip rib mounting front spar L angle. Fun vid here: https://youtu.be/SeWA7AkL2Ds


 
Apr 04, 2020     Stabilizer - (3 hours)       Category: Empennage
Doublers to A4 size, front and rear spar.


 
Apr 01, 2020     Stabilizer Skeleton - (3 hours)       Category: Empennage
Initial work putting together the horizontal stabilizer skeleton. Upper and lower doublers on rear spar.


 
Mar 29, 2020     Stabilizer - (.5 hour)       Category: Empennage


 
Mar 29, 2020     Parts Inventory - (1.5 hours)       Category: Empennage
Unpack, inspect, check inventory. All present and accounted for.


 
Mar 27, 2020     Pick Up At Estes - (2 hours)       Category: Tail Feathers
Went to Estes in SA to bring Tail kit, Slats / Flaperons kits back to shop. Unloaded parts.


 
Mar 26, 2020     ACF-50 Crankshaft - (.5 hour)       Category: Engine
To protect the crankshaft while waiting further build out I slathered on ACF-50 and got it in the journal areas too.


 
Mar 25, 2020     110 HP Head Search - (2 hours) Category: Engine
Found a possible source for 110 Head. Contacted Mike's Corvair Parts. Since I have one head at William's hanger, casting #3856759, Mike is going to look to see if he has one around his main store.
 
Mar 07, 2020     Parts Rack - (3 hours)       Category: Workshop
High tech finished parts rack made of 2x4. Shop organization.

See this link: https://corvair750.com/personal-blog/finished-parts-rack/


 
Mar 06, 2020     Sky Ranch Engine Manual - (2 hours) Category: Research
Introduction. Start Chapter 1: Fatigue Analysis
 
Mar 02, 2020     Zenith Order - (1 hour) Category: Tail Feathers
Ordered Zenit Tail / Slats / Flaperons from Zenith. 2 week lead time. Shipping to Estes in San Antonio.
 
Feb 29, 2020     Rudder Final Rivet - (3 hours)       Category: Empennage
Final riveting of the rudder after returning from Green Cove Springs where I built the Corvair short block.


 
Feb 24, 2020     Short Block - (1 hour)       Category: Engine
Drive from Green Cove Springs Florida to Seguin Texas. 16 hours starting Sunday at 130pm arriving Seguin Monday about 11am. Move TZero into shop.


 
Feb 23, 2020     Short Block - (3 hours)       Category: Engine
Rear oil housing install. Oil pickup install. Gold top and gold oil pan.


 
Feb 21, 2020     Case Inspection - (3 hours)       Category: Engine
At William Wynne's hangar inspected TZero case for cleanliness. Restored all threads. William removed a case dowl pin from an older case because processing at SPA had lost the dowel pin in mine. Noted my original case bolts / nuts not returned. Other bolts instead.


 
Feb 16, 2020     Rudder Parts Trimming / Deburring - (2.6 hours)       Category: Empennage
Trim nose skin. Tried to use Homebuilt Help technique of cutting with blade -- I didn't have the right blade. This turned into a PITA because of the excess filing I had to do. When cut with shears, line was straighter in the end and much faster to file. Can't do each hole deburr on skins -- will take too long. Need to give in and do the flat file technique to knock burrs off. Can buff out minor scratches with Scotch-Brite. Still have to deburr skeleton ribs and spar and second side of rear skin.


 
Feb 15, 2020     Rudder Rear Skin / Nose Skin - (3.6 hours)       Category: Empennage
Drill out all holes to final size, in rear skin and nose skin. Separate parts for deburring. Mark up the nose skin for final cutting.


 
Feb 13, 2020     Rudder Rear Skin / Nose Skin - (1.5 hours)       Category: Empennage
Put nose skin in place. Drill more holes.


 
Feb 10, 2020     Rudder Rear Skin - (1.5 hours)       Category: Empennage
Work on rudder rear skin, placement and drilling out pilot holes and A4 holes.


 
Feb 02, 2020     Plans analysis / HomebuiltHelp Video - (2 hours) Category: Research
Reviewed the sheet metal materials requirements for scratch building the horizontal stabilizer. Also viewed homebuilthelp video for scratch building metal aircraft. Ordered two more videos, one on tail section, one on rudder. Will review Rudder before riveting skeleton and working on the skins.
 
Jan 28, 2020     Rudder work - (2.5 hours)       Category: Empennage
Had a problem with drilling too deep on the rudder bottom spar and was unsure of fit for rudder horn against rudder spar. Conferred with Zenith. Horn fits spar perfectly, decided to replace bottom rib instead of using a doubler.


 
Jan 27, 2020     Rudder Assembly - (2.7 hours)       Category: Empennage
Began drilling rudder spar doublers to spar, marked out locations of ribs.


 
Jan 25, 2020     Rudder - (1 hour)       Category: Empennage
Uncrate Rudder Kit. Inventory all parts.


 
Jan 24, 2020     Unpack Tools - (1 hour)       Category: Tools
Unpack and inspect Zenith toolkit. Inventory all quantities.


 
Jan 24, 2020     Unpack Tools - (1 hour) Category: Tools
Unpack and inspect Zenith toolkit. Inventory all quantities.
 
Jan 18, 2020     Aircraft Fabrication Bench - (8 hours)       Category: Workshop
Build aircraft fabrication bench.


 
Jan 14, 2020     Toolkit Category: Tools
Ordered complete toolkit from Zenith for CH 750.
 
Jan 14, 2020     Rudder - (.5 hour) Category: Empennage
Ordered Rudder Kit
 
Jan 13, 2020     Ordered Options Plans - (.2 hour) Category: Research
Ordered Options Plans from Zenith, since I want wing lights, dual stick, folding wings, etc
 
Jan 12, 2020     Engine Cleaning - (1.7 hours) Category: Engine
More tube, hardware, and valve cover cleaning.
 
Jan 10, 2020     Engine Cleaning - (3.6 hours)       Category: Engine
Cleaned all kinds of parts including pushrod tubes, head clamps, clamp bolts, baffles, baffle hardware, valve cover. Some pushrod tubes may not be useable because of internal pitting which I don't approve of and find not acceptable. Plan to have William Wynne review.


 
Jan 10, 2020     Engine Shipping - (2 hours)       Category: Engine
Crated and shipped engine case to Sport Performance Aviation LLC to have it bored to be a 3.0L engine.


 
Jan 09, 2020     Engine Cleanup - (1 hour) Category: Engine
Cleaned up case bolts and nuts to fasten case together to ship to Sport Performance Aviation LLC.
 
Jan 08, 2020     Engine Parts - (2 hours) Category: Engine
Ordered following components for rebuild from Sport Performance Aviation: Case bore service, case cleaning service, 5th Bearing Crankshaft Service w/New gear, crank core charge (refundable), 5th Bearing Journal - 2nd Gen, 5th Bearing Housing Kit, CV1100 Cam and Lifters, CV200-HV Rear Assembly, CV3301 - E/P distributor, Gold Billet oil pan, Oil pan installation kit, Starter kit
 
Jan 05, 2020     Workshop Reorg - (5 hours) Category: Workshop
More stuff, making more space. Need to get rid of a wood lathe, maybe in trade for an orbital spindle sander.
 
Jan 04, 2020     Workshop Reorg - (5 hours) Category: Workshop
Removing things I just don't want to be in the way. Like what? Well, like a Kubota T1880, tools to be sold on EBAY (forget facebook marketplace it's useless), and goat feeding supplies (goats donated to another person's cause. Next up will be selling a 2005 Sportster 883 - 1200 conversion. It's got go, and that's what I want it to do (though it was good to me).
 
Dec 31, 2019     Engine Cleaning - (1.2 hours)       Category: Engine
Clean head attachment hardware. Inspect rocker arms. Not considered useable according to William Wynne's specs. Will have to find replacement. ACF-50 all head attachment components, useable or unuseable. Threw away pushrods.


 
Dec 30, 2019     Engine Cleaning - (.9 hour)       Category: Engine
Clean 6 pushrod tubes.


 
Dec 29, 2019     Engine Cleaning - (3.5 hours)       Category: Engine
Removed gasket material from rear oil case housing. Wire brushed oil pump housing bolts and cover plate. Cleaned oil pump gears.


 
Dec 17, 2019     CH750 Plans / Drawings - (2 hours) Category: Research
Begin evaluating material needs for Rudder, Horizontal Stabilizer, Elevator, slats, and flaperons. Find material suppliers. Begin looking at tool acquisition sources / costs. Begin reading Zenair Construction Standards.
 
Dec 15, 2019     Workshop organizing - (1 hour) Category: Workshop
Beginning to remove unneeded items. Plan for changes to allow successful build.
 
Dec 14, 2019     Engine Cleaning - (3 hours)       Category: Engine
Finished cleaning left case and prep for sending to Florida. Began cleaning heads. Evaluation of head quality. Pictures sent to FlyWithSPA / FlyCorvair for a review. Two cylinders may be too damaged for reconditioning.


 
Dec 12, 2019     Engine Cleaning - (2 hours) Category: Engine
Remove rust and scale from case studs.
 
Dec 09, 2019     Engine Cleaning - (1.5 hours) Category: Engine
Engine internal, external, and lifter bores. Also a few more screw holes in base of case half. Removed gasket material. Ready to clean the case studs.
 
Dec 08, 2019     Engine Case Cleaning - (2 hours)       Category: Engine
Left case cleaning. External. Internal. Oil galleries and all screw / dowl holes. Flush oil passageways. Remove scum and varnish.


 
Dec 06, 2019     Engine Assembly Instruction - (2 hours)       Category: Research
Corvair engine assembly, DVD 1 by William Wynne. Covered putting crank and cam back into engine, placing case halves together, tightening.


 
Dec 06, 2019     Case / Cam - (1.5 hours)       Category: Engine
Left case half cleaning. Exterior and interior. Oil galleries. Lifter bores. Clean cam, treat with ACF-50, wrap in plastic, ready to take to Florida.


 
Dec 01, 2019     Sheetmetal Scratch Technique review - (2 hours) Category: Research
Reviewed creation of form blanks from plans for aircraft parts using common woodshop tools, methods for cutting sheet metal, bending metal to form parts. First couple of chapters of Homebuilt Help's "Scratch Building Basics for Metal Aircraft".
 
Nov 29, 2019     Engine cleaning - (3 hours)       Category: Engine
Finished cleaning right case half. Removed rust / scale from case studs. Cleaned stud threads. Treated all studs with ACF-50 and wrapped in plastic for temp storage before taking to Floriday. Cleaned but camshaft and cam gear. Restored rear oil case attachment hardware to near orginal condition. Restored old head nuts (but will not reuse due to minor munging). All treated with ACF-50 and stored.


 
Nov 24, 2019     Engine crankshaft - (2 hours)       Category: Engine
Finished cleaning engine crankshaft. All passages flushed with solvent. Main bearing and connecting rod throw journals cleaned with light application of scotch brite 7447. Slathered in ACF-50 and wrapped for storage until delivery to Florida for processing into flight engine crankshaft.


 
Nov 22, 2019     Engine Case and Crankshaft - (2 hours)       Category: Engine
Almost finished cleaning R(ight) case half. All holes cleaned. Oil gallery cleaned. Surfaces cleaned and dowl holes cleaned. Still needs to have studs de-rusted / de-scaled. Minor pitting on some gasket surface areas that is not significant. No pitting on case mating surface. Internal surfaces clean enough for assembly.


 
Nov 17, 2019     Case and Crankshaft cleaning - (1.8 hours)       Category: Engine
Gasket removal. Discovered that gasket remover does a great job of getting stubborn varnish out of internal areas that are hard to get at. Crankshaft cleaning / minor polishing. Flushed all the crankcase oil passages thoroughly with solvent. Note that in first crankshaft pic the first two throws have very mild surface corrosion. In second picture it is gone -- just a bit of light rubbing with Scotch-Brite 7447.


 
Nov 15, 2019     Case cleaning - (1 hour) Category: Engine
Case detailing, removing dirt on outside, varnish on inside. Removed oil gallery plug for later cleaning.
 
Nov 13, 2019     AC 43.13-1B Engine - (.5 hour) Category: Research
Chapter 8 Engines, Fuel, Exhaust, and Propellers 8.1 to 8.13
 
Nov 09, 2019     Detail cleaning - (2.5 hours)       Category: Engine
Parts cleaner / lots of Scotch-Brite 7447


 
Nov 06, 2019     AC 43.13-1B Wiring - (.7 hour) Category: Research
9 Environmental Protection and Inspection, 10 Service Loop Harnesses, 11 Clamping, 12 Wire Insulation and Lacing String Tie, 13 Splicing
 
Nov 02, 2019     Case Cleaning / Crankshaft inspection - (2 hours)       Category: Engine
More case cleaning. Crankshaft inspection and attempt removal of woodruff key. Wouldn't come out. Taking to William Wynne / Dan Weseman.


 
Oct 30, 2019     AC 43.13-1B - (1 hour) Category: Research
6 Aircraft Electrical Wire Selection, 7 Table of Acceptable Wires, 8 Wiring Installation INspection Requirements
 
Oct 28, 2019     Engine Cleaning - (2 hours)       Category: Engine
Cleaning case halves.


 
Oct 25, 2019     AC 43.13-1B - (.7 hour) Category: Research
11.5 Electrical Wire Rating -- read it but still need to work through the examples.
 
Oct 21, 2019     Engine Core Teardown - (4.5 hours)       Category: Engine
Remove stuck cylinders by whatever means necessary without damaging case. Result: Success. Crank looks serviceable as well as heads, case, and the oil routing end case.


 
Oct 17, 2019     Engine Core Teardown - (2.5 hours)       Category: Engine
Remove front of case / bell housing. Split case by unding case bolts. Remove cylinder 5 by pounding on underside of piston stuck in cylinder. Same technique pounded piston out of cylinder 3. William Wynne recommended cutting slots (weak spots) on interior of cylinder wall to help break cylinder out of case.


 
Oct 14, 2019     AC43.13-1B 11.1 - 11.4 - (1.5 hours) Category: Research
11.1 Inspection and Care of Electrical Systems
11.2 Storage Batteries
11.3 Inspection of Equipment Installation
11.4 Inspection of Circuit-Protection Devices
 
Oct 11, 2019     Engine Core Teardown - (3 hours)       Category: Engine
Remove fan housing. Unable to get crank to rotate, so had to cut through rods (recommended by William Wynne). Cut through rods to be able to remove cylinders. After cutting through 4, began to be able to rotate crank while cylinders 1 & 2 still attached by rod. Undid rod bolts. Unable to remove rod cap. Sawed through both remaining rods. Tapped rod bolts out using previously removed rod with bolts set on the rod bolts not coming off and tapping lightly.


 
Oct 07, 2019     Engine Core Teardown - (2.5 hours)       Category: Engine
Remove pushrod tubes and pushrods. Remove head stud bolts and rocker retainers. Remove cylinder bottom cooling baffle. Remove cylinder heads.


 
Sep 25, 2019     Engine Core Teardown - (1.5 hours)       Category: Engine
Remove exhaust logs, engine cooling baffles (end pieces). Remove harmonic balancer. Remove distributor retaining screws. Left distributor in until understanding if it can be just pulled out. Videos can be found here: https://corvair750.blogspot.com/2019/09/steady-progress.html


 
Sep 18, 2019     Engine Core Teardown - (1.5 hours)       Category: Engine
Began tearing down core engine for flight engine conversion rebuild. Engine serial No: T04I3RG, Heads S/N: 3856743. This identifies as a 1965-1969 95 HP Corvair engine core.

Power washed. Removed sheet metal and accessories including carburetor and some vacuum lines.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.