Tail Plans Arrived. Studied the materials and tools required for tail assembly.
From drawing XNS-T03 Stabilator Assbly, parts to fabricate a clamp to secure pitot and TE probe.
To purchase:
For attachment of fiberglass stabilator tip MS24694-SS Machine Screw, qty 10 left, 10 right
MS21047 Anchor Nut, qty 10 left, 10 right
SSC-34 Flush Blind Rivet, qty 20 left, 20 right
Need a countersink.
Grommet AN931-3-5, qty 21 right only for aluminum instrument tubing lines for Total Energy, pitot, and static pressure sense probes. Check requirement for a single like this ILEC mount:
https://www.cumulus-soaring.com/ilec.htmf. Found this Article on Total Energy Compensation in practice:
https://www.cumulus-soaring.com/ilec/TotalEnergyCompensationInPractice-Brozel.pdf.