Project: Patience   -  
            Listing for Category : controls
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Jeff Orear   -  
Project:   Hatz - Classic   -   VIEW REPORTS
Total Flight Time:
Start/Last Date:Mar 03, 2011 - No Finish Date
Engine:Rotec R3600
Propeller:Culver
 
Friendly URL: https://eaabuilderslog.org?s=Patience

Home or Last Project Picture

Nov 01, 2021     Elevator stops, PTT wire       Category: Controls
I realized that I did not have a full up stop for the elevator planned. I welded a -3 nut on the control torque tube for both the up and down stops, then inserted a -3 bolt with a jam nut. Makes up and down stops adjustable. Also fed the push to talk wires up through the pilot control stick.


 
May 25, 2021     Rudder cables       Category: Controls
Fabricated and installed the rudder cables. Thanks to Don Stewart for lending me his swaging tool


 
Sep 30, 2020     Brake pedal setup       Category: Controls
Installed the master cylinders for the brakes and determined the position of the heel brakes relative to the rudder pedals. I decided to rake them slightly forward.


 
Jun 19, 2019     Throttle quadrant pushrods       Category: Controls
Started to fabricate the inter-quadrant pushrods. I needed to notch the lever arms to properly clear the rod ends.


 
May 04, 2019     Throttle quadrants       Category: Controls
Completed fabrication of the throttle quadrants. I'll designated the levers more by color on the lever arms later.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.