Project: Patience   -  
            Listing for Category : landing gear
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Jeff Orear   -  
Project:   Hatz - Classic   -   VIEW REPORTS
Total Flight Time:
Start/Last Date:Mar 03, 2011 - No Finish Date
Engine:Rotec R3600
Propeller:Culver
 
Friendly URL: https://eaabuilderslog.org?s=Patience

Home or Last Project Picture

Aug 17, 2023     Spring covers       Category: Landing Gear
I wanted to cover the spreader bar springs for the landing gear somehow. Originally I thought I would make a leather sleeve, but I assumed that would get oily quite quickly and need replacement periodically, so I opted for aluminum. I made ends that are secured to adel clamps around the gear spreader bars. Then the covers are secured to the ends.


 
Aug 07, 2022     Covering landing gear       Category: Landing Gear
Completed covering landing gear.


 
Oct 25, 2020     Brakeline conduit       Category: Landing Gear
Installed gear leg fairings as well as a 1/2” dia aluminum tube as a conduit for nylon brake lines. Still need to trim the length at the caliper end


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.