Project: Estevan   -  
            Listing for Category : sec 25 fmf
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Estevan Bataglia   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:2228.7
Start/Last Date:Feb 15, 2020 - No Finish Date
Engine:Lycoming Thunderbolt TB-390-EXP119
Propeller:Hartzell - Alum, 2 Blade 74in
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=Estevan

Home or Last Project Picture

Nov 25, 2022     Section 25 - Forward Mid Fuse Bulkheads 7 - (2.7 hours)       Category: Sec 25 FMF
Installation of COM-3-5 bearings and final installation of cover ribs. At the end of the session, the final step was to ream .311 and .375 holes, concluding section 25.

One thing that I noticed that instructions are not so clear is the orientation of the manufactured heads of the double flush rivets on the bearing support. The Manual says to do it on the "outboard" side. if we look at the left cover rib, it is actually the inboard side. No big issues. but I think this is a gotcha. Another thing that I noticed is that a rivet -7 is too long. I used -6 instead and the installation looked perfect.

In picture 189.6, there is a rivet that drifted to the side. I replaced that rivet.

https://youtu.be/OzEI00KpSng




 
Nov 20, 2022     Section 25 - Forward Mid Fuse Bulkheads 6 - (3.1 hours)       Category: Sec 25 FMF
Installing cover ribs. Everything is installed except for the rib that has the bearing, which will have to wait. Bolts torqued and sealed. Riveting done. Last step will be to install the missing cover rib/bearing and ream the .311 and .375 bolt holes.

https://youtu.be/ii51jmi6UtQ



 
Nov 19, 2022     Section 25 - Forward Mid Fuse Bulkheads 5       Category: Sec 25 FMF
Working on mid-fuse assembly I found out that one of the items I have had in backorder since February 2022 is the bearing COM 3-5 which is used in this step of the process as shown in pic 187.7. I will try and work around it as much as I can but it looks like this part will be hard to rivet on.

https://youtu.be/k8XmsNAiVHo



 
Nov 18, 2022     Section 25 - Forward Mid Fuse Bulkheads 4 - (3.9 hours)       Category: Sec 25 FMF
In this work session, I started assembling the mid-fuse bulkheads. This is looking like it will be a very short section to work on. So far, all is going fast and according to the instructions.

https://youtu.be/frPWPO3Lw9s



 
Nov 17, 2022     Section 25 - Forward Mid Fuse Bulkheads 3 - (2.3 hours)       Category: Sec 25 FMF
Priming forward mid fuse bulkhead parts and installing additional 3 conductor wire into the left fuse wire bundle for OAT probe connection.

250ml of primer used.

https://youtu.be/PJvbo0j_JFw



 
Nov 16, 2022     Section 25 - Forward Mid Fuse Bulkheads 2 - (1.8 hours)       Category: Sec 25 FMF
Parts prepared for priming.

https://youtu.be/w2sPkNGuE7c



 
Nov 15, 2022     Section 25 - Forward Mid Fuse Bulkheads 1 - (3.7 hours)       Category: Sec 25 FMF
Cleaning and deburring parts for section 25.

https://youtu.be/EIygYQnKeb0



 