Project: EAbel   -  
            Listing for Category : tail feathers
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Elliot Abel   -  
Project:   Bearhawk 5   -   VIEW REPORTS
Total Hours:618
Total Flight Time:
Total Expense:N/A
Start/Last Date:Sep 18, 2022 - No Finish Date
Engine:Lycoming
 
Friendly URL: https://eaabuilderslog.org?s=EAbel

Home or Last Project Picture

May 11, 2023     Covered elevators - (8 hours)       Category: Tail Feathers
Covered both elevators with medium fabric. Stits process


 
Jan 29, 2023     Nut plates - (2 hours) Category: Tail Feathers
Installed nut plates on horizontal stab for future horizontal to vertical tail fairing.
 
Oct 02, 2022     Melted lead in elevators - (2 hours)       Category: Tail Feathers
Removed and setup elevators for lead install. Melted lead into leading edge of counter balance. Reinstalled elevators and checked balance. Balance good up to this point.


 
Oct 01, 2022     Calculated balance weight - (2 hours)       Category: Tail Feathers
Calculated required balance weight for elevators. Fabric/chemicals and too coat with tapes =18.24 oz. Counterbalance weight req Right side 12.75 oz lead, left side 12.55 oz lead.


 
Sep 30, 2022     Bearings and straightening elevator tube - (3 hours)       Category: Tail Feathers
Installed elevator bearings. Straightened elevator. Researched balance weights. Cut elevator trim tab off.


 
Sep 24, 2022     Elevator hinges and tail flying wires - (3 hours)       Category: Tail Feathers
Installed elevator center hinge bearings. Installed elevators on the stabs for initial fit. Installed tail wires and adjusted.


 
Sep 22, 2022     Elevator Trim Torque Tubes - (2 hours)       Category: Tail Feathers
Reamed 1/2 inch bearings to fit elevator trim torque tubes. Drilled to size and clecoed. Temp installed stabs.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.