Project: EAbel   -  
            Listing for Category : Show all entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Elliot Abel   -  
Project:   Bearhawk 5   -   VIEW REPORTS
Total Hours:618
Total Flight Time:
Total Expense:N/A
Start/Last Date:Sep 18, 2022 - No Finish Date
Engine:Lycoming
 
Friendly URL: https://eaabuilderslog.org?s=EAbel

Home or Last Project Picture

Mar 11, 2024     Covering Category: Fuselage
Two coats Polyspray on Fuse
 
Mar 10, 2024     Covering - (6 hours) Category: Fuselage
 
Mar 09, 2024     Covering - (6 hours) Category: Fuselage
 
Mar 08, 2024     Covering - (6 hours) Category: Fuselage
 
Mar 06, 2024     Covering - (6 hours) Category: Fuselage
 
Mar 05, 2024     Covering - (5 hours) Category: Fuselage
 
Mar 04, 2024     Covering - (6 hours) Category: Fuselage
 
Mar 03, 2024     Covering (sanding) - (7 hours) Category: Fuselage
 
Mar 02, 2024     Covering - (5 hours) Category: Fuselage
 
Mar 01, 2024     Covering started Fuse Silver - (6 hours) Category: Fuselage
 
Feb 29, 2024     Covering - (6 hours) Category: Fuselage
 
Feb 28, 2024     Covering - (6 hours) Category: Fuselage
 
Feb 24, 2024     Covering - (4 hours) Category: Fuselage
 
Feb 23, 2024     Covering (silver) - (5 hours) Category: Fuselage
 
Feb 22, 2024     Covering - (6 hours) Category: Fuselage
 
Feb 17, 2024     Covering - (7 hours) Category: Fuselage
 
Feb 16, 2024     Covering - (5 hours) Category: Fuselage
 
Feb 15, 2024     COvering (silver) - (6 hours) Category: Fuselage
 
Feb 10, 2024     covering - (6 hours) Category: Fuselage
 
Feb 08, 2024     Covering - (5 hours) Category: Fuselage
 
Feb 07, 2024     Covering finish work - (6 hours)       Category: Fuselage
Sprayed silver polyspray on flaps and year legs


 
Feb 05, 2024     Covering finish work - (6 hours) Category: Fuselage
 
Feb 04, 2024     Covering finish work - (5 hours) Category: Fuselage
 
Feb 03, 2024     Covering finish work - (6 hours)       Category: Fuselage
Sprayed polybrush


 
Feb 02, 2024     Fabric ironing and finish work - (5 hours)       Category: Controls
Ironed fabric tapes and polybrushed as req


 
Jan 24, 2024     Fabric on flap - (7 hours) Category: Fuselage
Fabric and rib stitching
 
Jan 22, 2024     Fabric cont. - (6 hours) Category: Fuselage
 
Jan 21, 2024     Fabric - (6 hours)       Category: Fuselage
Fabric on fuse


 
Jan 12, 2024     Fabric tapes - (6 hours) Category: Fuselage
 
Jan 11, 2024     Fabric tapes - (8 hours) Category: Fuselage
Tape on fuse
 
Jan 10, 2024     Fabric misc parts - (5 hours) Category: Fuselage
 
Jan 08, 2024     Fabric - (8 hours) Category: Fuselage
Fabric misc parts
 
Dec 23, 2023     GTR 20 com - (3 hours)       Category: Avionics
Installed GTR 20 behind aft baggage


 
Dec 05, 2023     Left fabric - (8 hours)       Category: Fuselage
Installed fabric left side of fuse.


 
Dec 04, 2023     Wing tip light lense - (2 hours)       Category: Wings
Heated up lexan for landing light and bent over wingtip.


 
Dec 03, 2023     Wing tip install - (4 hours)       Category: Wings
Installed wing tips, drilled holes for screws. Aligned properly


 
Nov 30, 2023     Misc - (6 hours)       Category: Fuselage
Installed rivenuts for fuse to wing intersection. Installed door opener posts. Fabric a few interior areas


 
Nov 24, 2023     Aux tank - (6 hours) Category: Wings
Finished cutting and filing hole for aux tank.
 
Nov 22, 2023     Aux tank and holes for fuel lines - (6 hours)       Category: Wings
Drilled holes for wiring and fuel lines. Started cutting out AUX tank hole in wing panel.


 
Oct 27, 2023     Front seat fabric - (4 hours)       Category: Interior Finish
Installed fabric on front 2 seats


 
Oct 22, 2023     Fabric tapes on side panels - (5 hours)       Category: Fuselage
Fabric tapes around corners and ends


 
Oct 21, 2023     Seat back - (3 hours)       Category: Fuselage
Fabric seat back. Test fit


 
Oct 20, 2023     Pulley alignment - (4 hours)       Category: Wings
Aligned pulley coming out of wing using spacer against spar.


 
Oct 19, 2023     Seat 3-4 intercom plugs - (2 hours)       Category: Avionics
Installed plug and receptical for seats 3 and 4


 
Oct 15, 2023     Installed fabric on interior - (6 hours)       Category: Fuselage
Installed medium weight fabric on interior. Outside of front seats. Polyfiber process


 
Oct 15, 2023     Glued inspection panels - (4 hours)       Category: Fuselage
Glued inspection panels to tubing using DP 190 structural adhesive


 
Oct 14, 2023     Fabricated inspection panel - (6 hours) Category: Fuselage
Fabricated inspection panel under tail.
 
Oct 14, 2023     Interior lights - (3 hours) Category: Lighting
Installed wiring on 6 interior red led lights.
 
Oct 13, 2023     Interior lighting - (5 hours) Category: Lighting
Installed 6 interior led lights in painted holders. Riveted to stringers
 
Oct 07, 2023     Wiring for avionics from baggage area - (6 hours) Category: Avionics
 
Oct 06, 2023     Wiring from baggage area forward - (6 hours) Category: Avionics
 
Oct 05, 2023     Wiring of avionics - (8 hours) Category: Avionics
Wired rear ADHRS units
 
Oct 05, 2023     Coax for Vor and installed VOR antenna - (9 hours)       Category: Avionics
Installed a Bulan and coax for VOR/LOC antenna. Installed mount plate underneath tail for antenna.


 
May 11, 2023     Covered elevators - (8 hours)       Category: Tail Feathers
Covered both elevators with medium fabric. Stits process


 
May 02, 2023     Tapes - (5 hours)       Category: Controls
Installed fabric tapes on stab via polybrush


 
Apr 13, 2023     Polybrush on stabs - (6 hours)       Category: Empennage
Brushes polybrush on both stabs. Ironed out imperfections.


 
Apr 12, 2023     Fabric stabs - (6 hours)       Category: Empennage
Glued fabric on stabs. Shrunk


 
Apr 10, 2023     Ran wiring - (4 hours)       Category: Wings
Ran wiring for wing tips. Strobe, nav, landing. Ran wires for fuel pump and pitot heat.


 
Apr 06, 2023     Doilies for interior fabric - (6 hours)       Category: Fuselage
Cut and polybrushed doilies on interior fabric. Cleaned tubing around. Attached fabric to outside of window to pull both sides down at same time.


 
Apr 05, 2023     Interior fabric - (8 hours)       Category: Fuselage
Glued fabric for interior. Shrunk and polybrushed.


 
Mar 20, 2023     Door latch guide - (1 hour)       Category: Fuselage
Fabricated for latch guide and primed


 
Mar 20, 2023     Kydex door panel - (2 hours)       Category: Fuselage
Cut and formed kydex interior panel for rear cargo door. Trimmed left interior panel kydex to fit. Bent 90 to make riged in rear of interior piece.


 
Mar 20, 2023     Rear left window frame - (1.5 hours)       Category: Fuselage
Permanently installed left rear window frame onto fuse using bucked rivets.


 
Mar 20, 2023     Front window skins - (3 hours)       Category: Fuselage
Riveted front window skins both sides after interior paint.


 
Mar 18, 2023     Pulleys - (2 hours)       Category: Wings
Installed pulleys and pulley guides. Secured guides to wing. Installed bolts.


 
Mar 17, 2023     Fuel pump and lines - (10 hours)       Category: Wings
Fabrictaed plate for fuel pump,Installed fuel pump on plate, ran and bent fuel lines


 
Mar 15, 2023     Aoa, pitot, - (6 hours)       Category: Wings
Drilled holes for grommets,Installed grommets for lines to pass through, Installed lines


 
Mar 14, 2023     Painted interior panels - (8 hours)       Category: Fuselage
Painted interior frames and everything visible from within before interior install. Matched the tubing color.


 
Mar 08, 2023     Straps and aux tank - (8 hours)       Category: Wings
Fabricated and installed fuel tank straps, temp installed aux tank.


 
Mar 03, 2023     Cable guards around pulleys - (3 hours)       Category: Fuselage
Installed Teflon guards to keep cable from contacting pulleys.


 
Mar 02, 2023     Installed aoa and Pitot lines - (5 hours)       Category: Wings
Installed aoa and pitot tube lines in the wings. Installed pitot mast.


 
Mar 02, 2023     Installed autopilot and elt - (6 hours)       Category: Avionics
Fabricated shelf, pulley mounts and primed. Pulleys installed, elt/ antenna installed and yaw servo installed.


 
Feb 27, 2023     Doors cargo window - (5 hours)       Category: Fuselage
Riveted door skins on with 3/32 counter sink rivets. Counter sunk alumium skins 3/4 easy through. Rivet had barely sticks up but looks good and still grabs well. 2 inch spacing.


 
Feb 22, 2023     Windows and frames - (6 hours)       Category: Fuselage
Installed for frames and left windows. Installed stab inspection rings.


 
Feb 08, 2023     Primed Aluminum - (6 hours)       Category: Fuselage
Setup paint booth, primed aluminum panels and pieces.


 
Feb 07, 2023     Etched Aluminum - (5 hours)       Category: Fuselage
"Prekote" etched half alumium pieces with prekote and Scotch Brite.


 
Feb 05, 2023     Cut hole for aux - (5 hours)       Category: Wings
Cut hole for Aux tank using Saber. Filed back area for opening fit. Checked aux tank fit.
-DB


 
Jan 31, 2023     Aft baggage cont. - (4 hours)       Category: Fuselage
Built sides , top and aft baggage pieces from alumium. Requires riveting and securing.


 
Jan 30, 2023     Aft baggage mod - (7 hours)       Category: Fuselage
Cut, Fabricated, and demurred aft bulkhead panel. Built aft baggage floor. Tested floor to 80 lbs limit. Slight deformation. Will limit aft baggage to 20 lbs at 4 g's. Complete aft baggage enclosure will increase strength. Total additional weight to build, 6lbs. Total enclosure size, 30 inches long, 5 wide on floor, 18 wide at top, 20 inches tall.


 
Jan 29, 2023     Nut plates - (2 hours) Category: Tail Feathers
Installed nut plates on horizontal stab for future horizontal to vertical tail fairing.
 
Jan 29, 2023     Deburring - (4 hours) Category: Fuselage
Deburred and removed plastic from Fuselage alumium pieces.
 
Jan 28, 2023     Deburring - (4 hours)       Category: Fuselage
Removed aluminum from Fuse, started deburring.


 
Jan 28, 2023     Deburring - (1 hour) Category: Fuselage
Started deburring all aluminum skins for primer prep.
 
Jan 28, 2023     Tank straps - (1.5 hours) Category: Wings
Removed temporary tank strap chafe material. Sanded and primed straps.
 
Jan 28, 2023     Window frame - (2 hours)       Category: Fuselage
Drilled window frame. Fit plexi in window.


 
Jan 26, 2023     Window frame drilling - (1 hour) Category: Fuselage
Drilled holes for window frame , left side
 
Jan 20, 2023     Right window frame - (4 hours)       Category: Fuselage
Drilled holes for frame work on window. Cut plexi to fit inside window frame.


 
Jan 19, 2023     Right window frame - (3 hours)       Category: Fuselage
Fit and trimmed right window frame to airplane


 
Jan 19, 2023     Poster board template - (3.5 hours)       Category: Interior Finish
Cut poster board template for side panels to transfer to kydex later.


 
Jan 14, 2023     Rear windows front strip - (2.5 hours)       Category: Fuselage
Fabricated leading edge strip in rear window to attach to door frame. Riveted 5 nutplates for future window replacement.


 
Jan 13, 2023     Plexi back windows - (4 hours)       Category: Fuselage
Cut out .100 plexi glass for cargo and back left windows


 
Jan 11, 2023     Front door bottom - (2 hours)       Category: Fuselage
Bent bottom of front doors inward to sit tight against airframe.


 
Jan 11, 2023     Cargo door gas strut - (3 hours)       Category: Fuselage
Installed gas strut on forward cargo door. Fabricated ear for strut end and drilled hole in door frame.


 
Jan 10, 2023     Door skins - (5 hours)       Category: Fuselage
Fit and trimmed front door skins.


 
Jan 09, 2023     Door skins - (2 hours)       Category: Fuselage
Fit door skins to front right and left sides


 
Jan 05, 2023     Right door - (4 hours)       Category: Fuselage
Bent for skin, positioned and drilled. Built stiffner


 
Jan 05, 2023     Plexi reinforcement - (2 hours) Category: Fuselage
Fabricated front of plexi reinforcement.
 
Dec 30, 2022     Shock struts - (2 hours)       Category: Landing Gear
Installed springs, piston, and snap ring in shock struts. Requires to be fluid filled still.


 
Dec 30, 2022     Cargo doors and windows - (3 hours)       Category: Fuselage
Trimmed and drilled cargo door skin to frames. Fitted window frame, drilled in place.


 
Dec 29, 2022     Cargo door skins - (4 hours)       Category: Fuselage
Adjusted and trimmed cargo door skins.


 
Dec 29, 2022     Front stab tube covering holes - (3 hours)       Category: Fuselage
Fabricated and installed front stab tube fabric inspection holes.


 
Dec 28, 2022     Front stab mount holes - (3 hours) Category: Fuselage
Installed fabric covering rings for leading edge stab adjustment.
 
Dec 23, 2022     Forward fuel line - (2.5 hours)       Category: Fuel System
Routed and bent fuel line on forward door frame


 
Dec 17, 2022     Cargo door - (2 hours)       Category: Fuselage
Installed cargo door frame. Aligned, fit and installed latch mechanism.


 
Dec 17, 2022     Trimming alumium - (2 hours) Category: Fuselage
Installed bottom stringers permanently and trimmed around door seals
 
Dec 15, 2022     Gussets doors - (2 hours) Category: Fuselage
Installed aluminum gussets inside door frames
 
Dec 10, 2022     Static ports - (3 hours)       Category: Avionics
Installed static port holders aft of baggage


 
Dec 10, 2022     Stringers - (2.5 hours)       Category: Fuselage
Installed final underbelly stringers


 
Dec 02, 2022     ELT and remote com mount - (2 hours) Category: Fuselage
Fabricated ELT/Remote com mount aft of baggage.
 
Dec 01, 2022     Rivnuts finished installed - (2 hours)       Category: Fuselage
Rivnuts aft of baggage and other places complete. Installed nut plates for floor board cover below flap handle.


 
Dec 01, 2022     Skylights - (3 hours)       Category: Fuselage
Installed Skylight framework. Clecoed in place, awaiting riveting. Pieces are primed white.


 
Nov 30, 2022     Drilled floor boards - (4 hours)       Category: Fuselage
Finished drilling and triming all the floor boards.


 
Nov 29, 2022     Floorboards - (4 hours)       Category: Fuselage
Drilled holes for front floor boards to mount. Cut hold for fuel valve. Fabricated floorboard below flap handle.


 
Nov 29, 2022     Fuel valve and gascolator - (2 hours)       Category: Fuel System
Installed plate for fuel and gascolator


 
Nov 28, 2022     Fuel valve and gascolator - (1 hour)       Category: Fuel System
Coupled Fuel valve and gascolator,, torqued and fabricated cover in floor boards


 
Nov 28, 2022     Pulley covers - (1 hour)       Category: Fuselage
Fabricated 4 pulley covers


 
Nov 28, 2022     Brake reservoirs - (1 hour)       Category: Fuselage
Installed A-600 brake reservoirs


 
Nov 28, 2022     Nutserts holes - (4 hours)       Category: Fuselage
Drilled and filed nutserts (rivnuts) for floor boards


 
Nov 19, 2022     Floor Boards - (3 hours)       Category: Fuselage
Installed floor boards. Needs slight adjustment.


 
Nov 13, 2022     Rudder cables and rudder - (5 hours)       Category: Controls
Installed rudder. Installed rudder cables and swadged.


 
Nov 03, 2022     Flap pulleys - (.5 hour)       Category: Controls
Installed 4 flap pulleys


 
Nov 03, 2022     Fairleads - (.5 hour)       Category: Controls
Installed all fuselage fairleads


 
Nov 03, 2022     Lower elevator cable - (2 hours) Category: Controls
Replaced lower elevator cable. Installed on belcrank
 
Nov 03, 2022     Top Stringers - (1 hour) Category: Fuselage
Clear coated and installed top stringers. Used avex pulled rivets
 
Nov 03, 2022     Flap cable and v installed - (2 hours)       Category: Controls
Installed flap cable from handle to rear pulley. Painted and installed steel triangle and installed turnbuckles


 
Nov 03, 2022     Rudder pedal grip paint - (1 hour)       Category: Controls
Painted brake and rudder pedals with grip paint


 
Nov 01, 2022     Riveted Stringers - (2 hours)       Category: Fuselage
Riveted stringers Right side


 
Oct 27, 2022     Stringers primed - (3 hours)       Category: Fuselage
Primed stringers where they meet the chromoly tubing to limit galvanic corrosion. Painted stringers where seen in the fuselage.


 
Oct 20, 2022     Planned avionics layout - (1 hour)       Category: Research


 
Oct 20, 2022     Flap handle cleaning - (1 hour)       Category: Fuselage
Cleaned inside flap handle to allow piston to move free.


 
Oct 18, 2022     Stringers - (2 hours)       Category: Fuselage
Cut and bent left and right side stringers


 
Oct 18, 2022     Stringers - (2 hours) Category: Fuselage
Cut and bent left and right side stringers
 
Oct 17, 2022     Stringers - (1 hour) Category: Fuselage
Drilled holes in mounts on top stringers
 
Oct 17, 2022     Pedal springs - (1 hour)       Category: Fuselage
Installed new 2.5 inch rudder pedal springs


 
Oct 13, 2022     Started installing stringers - (2 hours) Category: Fuselage
Installed top 2 stringers.
 
Oct 13, 2022     Elevator cables built - (5 hours)       Category: Controls
Installed elevator cables and hardware.


 
Oct 12, 2022     Elevator trim - (5 hours)       Category: Controls
Swaged cables and installed turnbuckle for elevator trim. Rigged for trim neutral.


 
Oct 11, 2022     Shock strut - (1 hour)       Category: Landing Gear
Cleaned shock sturt assembly with scotch Brite.


 
Oct 11, 2022     Elevator Trim - (4.0 hours)       Category: Controls
Installed elevator trim wheel cables and ends.


 
Oct 09, 2022     Installed rudder pedals - (5 hours)       Category: Controls
Installed rudder pedals and brakes cylinders onto airframe.


 
Oct 02, 2022     Stick controls - (5 hours)       Category: Controls
Installed stick controls and hardware onto Fuse tabs. Rigged in line with aileron pulleys. Installed elevator bellcrank, push tube and rod end bearings. Requires adjustment.


 
Oct 02, 2022     Melted lead in elevators - (2 hours)       Category: Tail Feathers
Removed and setup elevators for lead install. Melted lead into leading edge of counter balance. Reinstalled elevators and checked balance. Balance good up to this point.


 
Oct 01, 2022     Calculated balance weight - (2 hours)       Category: Tail Feathers
Calculated required balance weight for elevators. Fabric/chemicals and too coat with tapes =18.24 oz. Counterbalance weight req Right side 12.75 oz lead, left side 12.55 oz lead.


 
Sep 30, 2022     Bearings and straightening elevator tube - (3 hours)       Category: Tail Feathers
Installed elevator bearings. Straightened elevator. Researched balance weights. Cut elevator trim tab off.


 
Sep 24, 2022     Elevator hinges and tail flying wires - (3 hours)       Category: Tail Feathers
Installed elevator center hinge bearings. Installed elevators on the stabs for initial fit. Installed tail wires and adjusted.


 
Sep 22, 2022     Elevator Trim Torque Tubes - (2 hours)       Category: Tail Feathers
Reamed 1/2 inch bearings to fit elevator trim torque tubes. Drilled to size and clecoed. Temp installed stabs.


 
Sep 21, 2022     Installed Fuselage on Rotisserie - (1 hour)       Category: Workshop


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.