Builder Name:Elliot Abel   -  
Project:   Bearhawk 5   -   VIEW REPORTS
Total Hours:618
Total Flight Time:
Total Expense:N/A
Start/Last Date:Sep 18, 2022 - No Finish Date
Engine:Lycoming
 
Friendly URL: https://eaabuilderslog.org?s=EAbel

Home or Last Project Picture

Feb 02, 2024     Fabric ironing and finish work - (5 hours)       Category: Controls
Ironed fabric tapes and polybrushed as req


 
May 02, 2023     Tapes - (5 hours)       Category: Controls
Installed fabric tapes on stab via polybrush


 
Nov 13, 2022     Rudder cables and rudder - (5 hours)       Category: Controls
Installed rudder. Installed rudder cables and swadged.


 
Nov 03, 2022     Flap pulleys - (.5 hour)       Category: Controls
Installed 4 flap pulleys


 
Nov 03, 2022     Fairleads - (.5 hour)       Category: Controls
Installed all fuselage fairleads


 
Nov 03, 2022     Lower elevator cable - (2 hours) Category: Controls
Replaced lower elevator cable. Installed on belcrank
 
Nov 03, 2022     Flap cable and v installed - (2 hours)       Category: Controls
Installed flap cable from handle to rear pulley. Painted and installed steel triangle and installed turnbuckles


 
Nov 03, 2022     Rudder pedal grip paint - (1 hour)       Category: Controls
Painted brake and rudder pedals with grip paint


 
Oct 13, 2022     Elevator cables built - (5 hours)       Category: Controls
Installed elevator cables and hardware.


 
Oct 12, 2022     Elevator trim - (5 hours)       Category: Controls
Swaged cables and installed turnbuckle for elevator trim. Rigged for trim neutral.


 
Oct 11, 2022     Elevator Trim - (4.0 hours)       Category: Controls
Installed elevator trim wheel cables and ends.


 
Oct 09, 2022     Installed rudder pedals - (5 hours)       Category: Controls
Installed rudder pedals and brakes cylinders onto airframe.


 
Oct 02, 2022     Stick controls - (5 hours)       Category: Controls
Installed stick controls and hardware onto Fuse tabs. Rigged in line with aileron pulleys. Installed elevator bellcrank, push tube and rod end bearings. Requires adjustment.


 