Project: N18TA   -  
            Listing for Category : bas harness
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:DeWitt Whittington   -  
Project:   Glasair - Sportsman 2+2   -   VIEW REPORTS
Total Hours:3544.2
Start/Last Date:Nov 22, 2003 - Sep 30, 2021
Engine:Lycoming O-360-A1A 180hp
Propeller:Hartzell Constant Speed 72"
Panel:GRT HX (3), GTN650, GTR200, VP200, Trio Pro Pilot,
 
Friendly URL: https://eaabuilderslog.org?s=N18TA

Home or Last Project Picture

Feb 28, 2021     Lap belt installation - (3 hours)       Category: BAS Harness
The final job for the installation of the lap belt part of the BAS shoulder harness system was cutting out the Zach Chase seat pans on the inner side to accommodate the lap belt and sleeve. This was a cut-and-try job that took much longer than expected.


 