Project: N18TA   -  
            Listing for Category : harness-seat
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:DeWitt Whittington   -  
Project:   Glasair - Sportsman 2+2   -   VIEW REPORTS
Total Hours:3544.2
Start/Last Date:Nov 22, 2003 - Sep 30, 2021
Engine:Lycoming O-360-A1A 180hp
Propeller:Hartzell Constant Speed 72"
Panel:GRT HX (3), GTN650, GTR200, VP200, Trio Pro Pilot,
 
Friendly URL: https://eaabuilderslog.org?s=N18TA

Home or Last Project Picture

Apr 05, 2010     BAS Shoulder Harness Installation - (50 hours)       Category: Harness-Seat
We engineered a very solid installation for dual BAS inertia reel shoulder harnesses. That included moving the seat belt inside anchor points for pilot and copilot aft to a functionally better location. The cross tube which supports the inertia reels is a 1 1/4" CrMo tube with custom brackets welded by Charlie Collier, Master Welder. He brought his oxy-acetylene welding equipment to us so he could get the position of the backets exactly correct. These photos span about 2 years for this complicated installation. We were lucky to have counsel and other machining help from Ron VanSickle, Master Machinist with is Bridgeport.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.