Project: N18TA   -  
            Listing for Category : interior finish
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:DeWitt Whittington   -  
Project:   Glasair - Sportsman 2+2   -   VIEW REPORTS
Total Hours:3544.2
Start/Last Date:Nov 22, 2003 - Sep 30, 2021
Engine:Lycoming O-360-A1A 180hp
Propeller:Hartzell Constant Speed 72"
Panel:GRT HX (3), GTN650, GTR200, VP200, Trio Pro Pilot,
 
Friendly URL: https://eaabuilderslog.org?s=N18TA

Home or Last Project Picture

Dec 01, 2011     Cable covers and control covers - (20 hours)       Category: Interior Finish
These photos show the cover forming the front and rear tunnels. In the rear, the tunnel covers cables for the elevator and rudder as well as electriclal items in the tail cone such as the elevator trim, rear battery, coax to the magnetometers, wiring to the ADS-B equipment and control and test wiring for the 104MHz ELT.


 
Nov 21, 2011     Trim panels inside the cabin - (40 hours)       Category: Interior Finish
Under the back of the front seats, we initially installed carefully crafted aluminum left and right kick panels for rear-seat passengers or baggage that might interfere with cables and wires. (We do have an optional rear seat with belts that is designed to accommodate two people maximum 5'2" tall.)

Kick panels in front fit to the left of the pilot and to the right of the copilot. Each has a fresh air swivel ball vent for outside air brought in through left and right NACA ducts. ho


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.