Project: N18TA   -  
            Listing for Category : cable riggin
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:DeWitt Whittington   -  
Project:   Glasair - Sportsman 2+2   -   VIEW REPORTS
Total Hours:3544.2
Start/Last Date:Nov 22, 2003 - Sep 30, 2021
Engine:Lycoming O-360-A1A 180hp
Propeller:Hartzell Constant Speed 72"
Panel:GRT HX (3), GTN650, GTR200, VP200, Trio Pro Pilot,
 
Friendly URL: https://eaabuilderslog.org?s=N18TA

Home or Last Project Picture

Feb 01, 2011     Aileron cable rigging a difficult task - (30 hours)       Category: Cable riggin
Rigging the aileron cables turned out to be difficult. The aileron deflection up and down had to be in the specified arc from the Glasair manual. Plus, that had to occur when the control sticks were centered. We devised plywood wedges to lock the aileron cross tube in position. This became a back and forth job of adjusting turnbuckles and measuring the up and down deflection of the ailerons using our digital angle gauge. And also we found that when the ailerons were properly rigged, they did not exactly line up with the flaps.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.