Total Hours:562
Total Flight Time:4.6
Start/Last Date:Jan 01, 2018 - No Finish Date
Engine:Lycoming O-320
 
Friendly URL: https://eaabuilderslog.org?s=Sport

Home or Last Project Picture

May 29, 2020     Baggage compartment & Elevator push rod tunnel. - (8 hours)       Category: Fuselage
Today I worked on finishing the elevator push rod tunnel installation and also fabricated the optional baggage compartment panels. Then I installed the previously fitted top skin formers aft of the seat. I also filled both fuel tanks to be sure that there are no leaks before installing them to the wings.


 
Apr 21, 2020     Riveted bottom forward skin on, worked on fitting rudder pedals. - (3 hours) Category: Fuselage
Riveted bottom forward skin on, worked on fitting rudder pedals.
 
Apr 21, 2020     Cheek and joggle fitment, exhust tunnel. - (8 hours)       Category: Fuselage
Fit left side cheek former's and skin. Finished fitting both cheeks, de burred and dimpled cheeks and former's. Began fitting joggle strips for cowling.


 
Apr 19, 2020     Fuselage construction       Category: Fuselage


 
Removed Elevators and riveted inner ribs and drive horns onto inner ribs. Reinstalled elevators and re leveled. Drilled hole in drive horn for heim bearing installation per build manual.
 
Installed rudders and brake pedals. Installed upper and lower nylon blocks for spar sliders.
 
Aug 21, 2019     Bottom skin fitting, assembly of rudder and brake pedals. - (8 hours) Category: Fuselage
Did final fit of bottom skin and prepped for final riveting. Started assembling rudder and brake pedals.
 
Jul 25, 2019     Fit and up drilled all horizontal brackets - (5 hours)       Category: Fuselage
Fit and up drilled all horizontal brackets and mounted horizontal with bolts. Began fitting vertical stabilizer.


 
Jul 10, 2019     Fit horizontal tail and brackets - (5 hours)       Category: Fuselage
Fit horizontal tail and brackets. Leveled and squared horizontal to fuselage. Trimed horizontal to fit tail cone. Appled service bulliten to correct angle of incidence to 0 degrees.


 
Jun 12, 2019     Tailcone final assembly - (8 hours)       Category: Fuselage
Assembled and worked on final assembly of tail cone. Finsihed all riveting except bottom skin to longerons.


 
Jun 02, 2019     Worked on assembly of push rod tube cover. - (4 hours)       Category: Fuselage
Worked on assembly of push rod tube cover.


 
Apr 21, 2019     Fitted and assembled bulkheads. - (5 hours)       Category: Fuselage
Fitted and assembled bulkheads.


 