Listing for Category : controls
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (60)
Research
Workshop
- (1)
Empennage
- (1)
Fuselage
- (22)
Firewall
Tail Feathers
Wings
- (22)
Controls
- (11)
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
- (1)
Propeller
Fuel System
- (2)
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
Barry Cole
-
Project:
Sport Performance - Panther
-
VIEW REPORTS
Total Hours:
562
Total Flight Time:
4.6
Start/Last Date:
Jan 01, 2018 - No Finish Date
Engine:
Lycoming O-320
Friendly URL:
https://eaabuilderslog.org?s=Sport
Home or Last Project Picture
Apr 29, 2020
Flap lever and linkage
- (3 hours)
Category: Controls
Installed flap lever and adjuster arms.
IMG_3069[1].jpg
IMG_3070[1].jpg
Apr 24, 2020
Aileron bell crank installations.
- (6 hours)
Category: Controls
Installed bearings in bell cranks and made aileron push tubes. Cut clearance for bell crank on number 1 wing rib on left wing.
IMG_3010[1].jpg
IMG_3011[1].jpg
IMG_3012[1].jpg
IMG_3013[1].jpg
IMG_3015[1].jpg
IMG_3019[1].jpg
IMG_3020[1].jpg
Apr 22, 2020
Finished installing elevator trim cable. Completed final assembly of tail section. Installed spar guide blocks and adjusters. Installed flap detent plate.
- (6 hours)
Category: Controls
Finished installing elevator trim cable. Completed final assembly of tail section. Installed spar guide blocks and adjusters. Installed flap detent plate.
EB4C9AD5-9DA8-4413-8BFF-5734DA5E5150.jpeg
10D8F085-2E98-4BB3-9ACD-5106D129334A.jpeg
13D96CF1-FA5F-444E-AE4F-4741D65F386F.jpeg
2813A02E-569E-4463-8ECE-1669BBF375CF.jpeg
A7D1EA30-73A7-4AB2-961D-FCFDE1971093.jpeg
Apr 21, 2020
Riveted tail section after rigging.
- (2 hours)
Category: Controls
Riveted tail section after rigging.
Apr 21, 2020
Riveted tail section after rigging.
- (2 hours)
Category: Controls
Riveted tail section after rigging.
DCAD5FEE-9FCB-4BD2-844D-0A091D7D1056.jpeg
Apr 16, 2020
Elevator balance, rudder cables, return springs etc
- (12 hours)
Category: Controls
Installed elevator balance weight, installed rudder cables, installed rudder return springs and bracket, installed rudder pedal adjusters. Fitted rudder horn stops. Ran elevator trim cable. Checked rudder travel.
IMG_2972.jpg
IMG_2974.jpg
IMG_2975.jpg
IMG_2976.jpg
IMG_2977.jpg
IMG_2978.jpg
IMG_2981.jpg
Oct 29, 2019
Finished elevator aft push tube and painted it. Worked on elevator balance weight brackets. Made master cylinder extensions and mounted master cylinders. Set brake pedal locations.
- (7 hours)
Category: Controls
Finished elevator aft push tube and painted it. Worked on elevator balance weight brackets. Made master cylinder extensions and mounted master cylinders. Set brake pedal locations.
0129da0e8547836ebd90062ddc8b14a453581ea217.jpg
014879fb781ab16563d97663fa3161c52296abea6e.jpg
018d7598798f87c16ca83bf11b5bc57a70dd3026e5.jpg
019859205d88cf76ffc384dad6b9af22fca36b602c.jpg
01e81f74ef89bb358e7b65c6f81670786774471028.jpg
01ecae66243a7b1512190f6aad54278340e8e37a4f.jpg
Oct 28, 2019
Removed vertical stabalizer to install elevator down stop. Worked on elevator aft push pull tube.
- (4 hours)
Category: Controls
Removed vertical stabilizer to install elevator down stop. Worked on elevator aft push pull tube.
01021146293c2834d22e2e67ce9d6f62fb742f0817.jpg
01439f200ceafeaece55ed0d4810f8dc377f28975c.jpg
0161cadaf385255eb2de1d3c844254352e22ef1732.jpg
0178f1a2f6f3958d8eb1018ce4aff761ddaf62878e.jpg
Apr 16, 2019
Installed elevator balance weight, installed rudder cables, installed rudder return springs and bracket, installed rudder pedal adjusters. Fitted rudder horn stops. Ran elevator trim cable. Checked rudder travel.
- (12 hours)
Category: Controls
Installed elevator balance weight, installed rudder cables, installed rudder return springs and bracket, installed rudder pedal adjusters. Fitted rudder horn stops. Ran elevator trim cable. Checked rudder travel.
Jan 17, 2019
Aileron Construction
- (16 hours)
Category: Controls
Started and finished ailerons.
01396a8a5e87e26c8662d9962b804bf3e8ce48ca9d.jpg
014112dbc68336460c6714df5fcd0d92f00e4528cf.jpg
015f46bf91ee52f5707a5e20d1f37f04369e2ccb8c.jpg
0168e66b33917dfb065239ad4b8c2140872e734529.jpg
016af0cc43d466241cafbe1cda00b60e3e38d4587e.jpg
01d922930cbe3669518cafff80d2476bcf06b0cdec.jpg
01dec14498862814f81b0453b922590cea394ef190.jpg
01ed6c9d68dd43b5a0bb4e2d85801a4ed22f8123b7.jpg
Dec 22, 2018
Flap construction
- (11 hours)
Category: Controls
Construction of flaps and installation of flap hinges.
01afe18d3584add7cf2972c3fa68a7e931fe103169.jpg