EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Sport
-
Listing for Category : Wings
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (60)
Research
Workshop
- (1)
Empennage
- (1)
Fuselage
- (22)
Firewall
Tail Feathers
Wings
- (22)
Controls
- (11)
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
- (1)
Propeller
Fuel System
- (2)
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
Barry Cole
-
Project:
Sport Performance - Panther
-
VIEW REPORTS
Total Hours:
562
Total Flight Time:
4.6
Start/Last Date:
Jan 01, 2018 - No Finish Date
Engine:
Lycoming O-320
Friendly URL:
https://eaabuilderslog.org?s=Sport
Home or Last Project Picture
May 12, 2020
Aileron and flap rigging
- (12 hours)
Category: Wings
Installing bell cranks, push rods and joiners for aileron and flap controls. Finished installing control stick. Finished flap handle. Prepped for cutting flaps s12 inches shorter.
IMG_3135[1].jpg
IMG_3136[1].jpg
IMG_3137[1].jpg
IMG_3138[1].jpg
IMG_3139[2].jpg
IMG_3140[1].jpg
IMG_3141[1].jpg
IMG_3142[1].jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.