Project: JMillette   -  
            Listing for Category : avionics
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Joseph Millette   -  
Project:   Zenith   -   VIEW REPORTS
Total Hours:1151
Total Flight Time:
Start/Last Date:Jul 30, 2020 - Mar 31, 2022
Engine:Viking 130
Propeller:Whirlwind
Panel:GRT 10.1 Sport
 
Friendly URL: https://eaabuilderslog.org?s=JMillette

Home or Last Project Picture

Mar 08, 2024     CB Wiring - (9 hours)       Category: Avionics
Started wiring the CB for powering the electricals.


 
Jun 04, 2023     Panel and Electrical redo - (6 hours)       Category: Avionics
Started to plan out the new panel and layout for terminals and electricals. Installed new switches and took a lot of measurements.


 
May 30, 2023     Panel option redue - (3 hours)       Category: Avionics
Redesigned Panel to accommodate new AP and Trim setup. I am still debating using the GRT EFIS or swapping it to an iPad with the BOM as primary. The AP head unit can act as a PFD.


 
May 28, 2023     Clean Slate - (6 hours)       Category: Avionics
I started pulling Avionic to redo the wiring behind the panel. I was not happy with the current layout of the wiring.
I also purchased an ECOAutopilot from Aircraft Automation. This will use trim tabs to control my aircraft including auto trim and full autopilot modes (GPS and 2D)


 
Jul 30, 2022     Radio installed - (8 hours)       Category: Avionics
Installed and tested the Radio system. Installed headset/PTT switch. All works. When the engine is running and Atl Field is on, I get a slight wine sound. will test a filter to see if reduces.


 
Jul 25, 2022     Mount for Headsets - (4 hours)       Category: Avionics
Installed headset mounts and installed fuel flow sensors


 
Jul 04, 2022     Static System/BU levil BOM Install - (8 hours)       Category: Avionics
Installed Levil BOM for AHRS BU. Finished installing Static port(S) nees to run static line to front of Aircraft to connect to EFIS and EIS.


 
Sep 06, 2021     Started wiring the Avionics - (16 hours)       Category: Avionics
For this log entry, I started wiring the avionics in the Cruzer. I mainly wanted to get the EFIS connections with the G175 Garmin, and the the Trig 22 Mode S transponder. I did run into 2 issues. I accidentally connected the Serial out of the ARINC to the EFIS to the In and vise versa. I found the mistake by using a multi meter and checking the pins. I also forgot to wire the Remote on ground wire on the trig 22 transponder. I corrected this issue and all is now correctly working. I continued and installed the RF Cabling for the following antennas, Com radio, Transponder, and GPS Antenna. Attached is my wiring diagram i drew out for future reference.


 
Apr 18, 2021     New removable panel and Mounted Avionics to panel - (16 hours)       Category: Avionics
I cut the instrument panel and made a new removable panel from .032 aluminum. Cut holes for panel equipment and temporary mounted equipment. Will open all wholes to correct sizes and finish panel next week. This will include nut plates and screws.


 
Mar 22, 2021     Received GRT Avionics Package - (1 hour)       Category: Avionics
Received and tested on the bench the GRT Sport 10.1in EFIS
Added the Garmin175


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.