EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
JMillette
-
Listing for Category : wings
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (142)
Research
- (3)
Workshop
- (3)
Empennage
- (4)
Fuselage
- (19)
Firewall
Tail Feathers
- (15)
Wings
- (25)
Controls
- (7)
Avionics
- (11)
Lighting
- (3)
Instrument Panel
- (7)
Landing Gear
- (6)
Engine
- (14)
Propeller
- (1)
Fuel System
- (7)
Interior Finish
- (3)
Paint / Decals
- (11)
Inspection
Tools
- (1)
Auto Entry
- (1)
Farings
- (1)
Builder Name:
Joseph Millette
-
Project:
Zenith
-
VIEW REPORTS
Total Hours:
1151
Total Flight Time:
Start/Last Date:
Jul 30, 2020 - Mar 31, 2022
Engine:
Viking 130
Propeller:
Whirlwind
Panel:
GRT 10.1 Sport
Friendly URL:
https://eaabuilderslog.org?s=JMillette
Home or Last Project Picture
Sep 02, 2022
Riveted wing tips
Category: Wings
173.163.247.142+7fFimyg9o-8C50E28F-0B51-4917-A6BF-F32DC3F4F678.jpeg
Dec 03, 2022
Reinstalled Wings after paint
- (7 hours)
Category: Wings
Had some friends come over to assist in reinstalling the wings. I also mounted the Flaperons and connected the linkage. I still need to set the throw. Tomorrow I plan to complete the passenger door and then begin rigging the tail controls so I can permanently mount the tail feathers.
IMG_5263.jpg
IMG_5266.jpg
IMG_5269.jpg
IMG_E5267.jpg
Oct 29, 2022
Disassembly
- (8 hours)
Category: Wings
I removed my wings with some help to begin preparing them for paint. I also removed the tail feathers. I now have a lot of paint prep. While the wings are off i installed all the rivets that I missed (3) during initial build. Added space for easy access to forward wing bolts
3A13F8EF-CC16-4786-90B3-F93CCC6ACC06.jpeg
C4A8B5CF-424D-4D6B-9CC0-0F0C1816C476.jpeg
49960687-754E-4DE0-956D-A59785D4306F.jpeg
Sep 26, 2022
Fairings
- (16 hours)
Category: Wings
Made fairings to cover the transition on leading edge.
D3BC34E9-7D2F-43FA-B2D8-7F4AEF3443BE.jpeg
E62D054F-F605-4FBD-BF72-FB91995D9D74.jpeg
DE33AB49-7E84-4A5F-9750-46344FE1DA98.jpeg
AB91239A-98EA-4F1C-AEB6-566744B4C763.jpeg
5586FBC8-53B1-4DB4-8EA6-E5B557291681.jpeg
4DAD9B1B-0CB6-4BC7-81DA-F6A8370F82D2.jpeg
55FC79CA-8FB4-4940-8565-977075015AB7.jpeg
7CB9D5AE-F87D-4F99-98D5-98DF6E4AB69F.jpeg
6DE436D8-2BEE-4F9E-AA34-F9AF05591B46.jpeg
21A6680C-8092-4D70-B631-1C3BDB69D1E5.jpeg
45E70CDD-8E9A-4A1D-B82E-E6A680D094B9.jpeg
9D98D2D8-0E98-482E-8DC1-400982A9A378.jpeg
06ACC98D-A222-4E6C-89D9-5FC61C95FD3C.jpeg
DD491B3E-0255-4E48-A812-2B84FE9C3F6A.jpeg
B8734C51-355C-4FC3-8B35-04968DFA58DB.jpeg
994C071F-A672-4190-8D74-597D98BCA577.jpeg
5274DF25-1FE2-4F8E-AED9-B9C7771FC6EA.jpeg
441EF0DF-9CD6-406D-A9F9-72AC6EA4BBBC.jpeg
EDC99ED1-0B3A-4A75-95A4-1232B89323B1.jpeg
D8D7656B-9F41-4499-9ADD-4F28072C9665.jpeg
Sep 10, 2022
Fiberglass Fairing
- (8 hours)
Category: Wings
Had to redo my passenger side fairing. I seemed to have missed the resin in the incorrect ratio. The Pilot side came out great. i have trimmed and filled it with a micro glass sphere and epoxy resin to fill the holes. Next will be sanding.
IMG_4844.jpg
IMG_4845.jpg
IMG_4846.jpg
IMG_4850.jpg
IMG_4851.jpg
IMG_4853.jpg
IMG_4854.jpg
IMG_4855.jpg
IMG_4856.jpg
IMG_E4847.jpg
IMG_E4848.jpg
IMG_E4849.jpg
IMG_E4852.jpg
Sep 03, 2022
Inner wing skins
- (16 hours)
Category: Wings
Completed passenger and pilot side inner wing skins. Made fiberglass fairings for the leading-edge joints.
IMG_E4767.jpg
IMG_4763.jpg
IMG_4764.jpg
IMG_4765.jpg
IMG_4768.jpg
IMG_E4761.jpg
IMG_E4762.jpg
IMG_E4766.jpg
IMG_E4767.jpg
Jul 29, 2022
Completed wiring in both wings
- (16 hours)
Category: Wings
Completed and installed tips and lights
173.163.247.142+7fFimyg9o-11F9B192-C0FE-49D9-9432-22C71D067539.jpeg
173.163.247.142+7fFimyg9o-12AECB45-3D60-42AD-89AC-41896A5E38FA.jpeg
173.163.247.142+7fFimyg9o-1F55DDEB-3560-4C0B-BAFE-AE71353F197F.jpeg
173.163.247.142+7fFimyg9o-2106E107-669D-4E12-B02D-DF6F7F843673.jpeg
173.163.247.142+7fFimyg9o-21DBC0ED-E319-42F5-BB26-0653433B32EE.jpeg
173.163.247.142+7fFimyg9o-278B51BF-C492-4005-8665-CC6D6CE8DD09.jpeg
173.163.247.142+7fFimyg9o-4F5EC9F9-850B-4E2E-AEDE-A55BBBDF3AFA.jpeg
173.163.247.142+7fFimyg9o-6A460728-4A78-4BC3-B4DF-7C12EA0E4AB2.jpeg
173.163.247.142+7fFimyg9o-823B80FE-AB8D-4217-B3DF-192F16C668F0.jpeg
173.163.247.142+7fFimyg9o-FB789E58-A0C4-40B6-A793-806415D9DE72.jpeg
Aug 20, 2022
Riveted wing tips
- (4 hours)
Category: Wings
173.163.247.142+7fFimyg9o-8C50E28F-0B51-4917-A6BF-F32DC3F4F678.jpeg
Aug 27, 2022
Root Wing Skin
- (8 hours)
Category: Wings
Started working on inner wing skin on pass. side wing. Will need to complete Pilot side and then make fiberglass fairing.
Also completed wiring on Pilot grip. Added elevator trim control to grip.
Inner wing skin Pass. side
wiring strain relief on control stick. PP=lanning to add plug for easy servicing
Inner wing skin at fuselage
Trim and PTT switch
Will need fiberglass fairing
Bottom of inner wing skin Pass. side
Wiring from stick grips
Jul 29, 2022
Completed wiring in both wings
Category: Wings
173.163.247.142+7fFimyg9o-11F9B192-C0FE-49D9-9432-22C71D067539.jpeg
173.163.247.142+7fFimyg9o-12AECB45-3D60-42AD-89AC-41896A5E38FA.jpeg
173.163.247.142+7fFimyg9o-1F55DDEB-3560-4C0B-BAFE-AE71353F197F.jpeg
173.163.247.142+7fFimyg9o-2106E107-669D-4E12-B02D-DF6F7F843673.jpeg
173.163.247.142+7fFimyg9o-21DBC0ED-E319-42F5-BB26-0653433B32EE.jpeg
173.163.247.142+7fFimyg9o-278B51BF-C492-4005-8665-CC6D6CE8DD09.jpeg
173.163.247.142+7fFimyg9o-4F5EC9F9-850B-4E2E-AEDE-A55BBBDF3AFA.jpeg
173.163.247.142+7fFimyg9o-6A460728-4A78-4BC3-B4DF-7C12EA0E4AB2.jpeg
173.163.247.142+7fFimyg9o-823B80FE-AB8D-4217-B3DF-192F16C668F0.jpeg
173.163.247.142+7fFimyg9o-FB789E58-A0C4-40B6-A793-806415D9DE72.jpeg
Jul 28, 2022
Pilot Wing tip
- (4 hours)
Category: Wings
Installed Pilot side Wing Tip.
IMG_4686.jpg
IMG_E4685.jpg
IMG_E4687.jpg
Jan 09, 2022
Corrected dihedral
- (8 hours)
Category: Wings
Today I fixed the mistake I made on the struts. Here are the steps to correct the issue I created.
1. Level aircraft
2. run string from one wingtip to the other.
3. set wing height to 85mm =/-5mm at inboard rib.
4. Mount struts lose to get correct length.
5. mark holes for weldment and strut.
5. drill holes and then remount.
6. check dihedral (1.3 deg. on both wings)
7. repeat on other wing.
IMG_3878.jpg
IMG_3896.jpg
IMG_E3877.jpg
IMG_E3883.jpg
IMG_E3884.jpg
IMG_E3885.jpg
IMG_E3887.jpg
IMG_E3889.jpg
Jan 01, 2022
Struts and mounting bolts
- (9 hours)
Category: Wings
Mounted struts, Cut ended 1 in short and will need to correct to achieve correct dihedral. Started building fuel cart. Hangar leaks covered plane to prevent damage.
IMG_3866.jpg
IMG_3867.jpg
IMG_3868.jpg
Dec 29, 2021
Mounted wings
- (8 hours)
Category: Wings
Today I had a few friends come over and help mount the wings to the fuselage. We mocked up the wings in so that i can perform all measurements to get the wings square, set incidence, and then finally dihedral.
IMG_3838.jpg
IMG_3848.jpg
IMG_3850.jpg
IMG_E3808.jpg
IMG_E3847.jpg
IMG_E3848.jpg
MVYD9192.jpg
Dec 27, 2021
Left wing Completed
- (8 hours)
Category: Wings
Completed building the Left-wing, Wired and Pitot/AOA plumbed and ready to mount to Fuselage
BEPF4737.jpg
IMG_3805.jpg
IMG_3806.jpg
IMG_3807.jpg
IMG_3808.jpg
IMG_3810.jpg
IMG_3812.jpg
IMG_3817.jpg
IMG_3819.jpg
IMG_3820.jpg
IMG_3821.jpg
IMG_3822.jpg
IMG_3823.jpg
IMG_3824.jpg
IMG_3825.jpg
IMG_3838.jpg
IMG_3840.jpg
IMG_E3808.jpg
IMG_E3810.jpg
IMG_E3811.jpg
IMG_E3812.jpg
IMG_E3817.jpg
IMG_E3819.jpg
IMG_E3821.jpg
IMG_E3822.jpg
IMG_E3840.jpg
IMG_E3842.jpg
OQSH6082.jpg
VLTM9256.jpg
Dec 23, 2021
Left wing wire
- (9 hours)
Category: Wings
Routed power leads for all electrical and also pitot and AOA sensor
F360C1DE-4F4F-4AB2-B212-3114127F8AA2.jpeg
3CCFAA02-5BE9-4651-9B10-2621CE9CCFDD.jpeg
575519E5-3803-4388-8514-7E772C9D42E2.jpeg
43FF6143-C8C9-45C4-BD08-746A15408460.jpeg
67FC6470-A498-4821-8994-D85144469CC9.jpeg
68C620FE-65C6-4E65-9983-79C033616E76.jpeg
0A7BC5AA-F726-48FA-BAF9-8D3C38688DC6.jpeg
D113DD7D-166D-4306-880A-E9640E8AEAAB.jpeg
C41167B3-DC04-47C6-8F78-9006C75EAEEC.jpeg
73BD4C10-7872-4C8D-B293-D1C20F41A302.jpeg
04D038D0-8B01-4534-97CC-C6E5FF54D8B4.jpeg
Dec 24, 2021
Left wing debur and rivet bottom skin
- (9 hours)
Category: Wings
63A18416-FD37-4789-A5F3-389CB54A2112.jpeg
CE7A1A6D-BBBC-4F2B-9787-7DFB394295D6.jpeg
11AD12B0-CBE9-4F78-AB3D-F1DA69869796.jpeg
768CAC47-AC3F-4BB4-907C-A0738062F70F.jpeg
Dec 20, 2021
Left wing bottom skin
- (9 hours)
Category: Wings
Match drilled bottom skin and drilled access panel for pitot and landing light
D9ADDC1A-8461-41A4-9326-C56E94690F8C.jpeg
AE467693-915B-40E9-9920-8151265FBA56.jpeg
5F419A80-A9A1-459D-9227-304744D8354C.jpeg
AD3338AC-2B5A-4D60-810B-9219D9B82C17.jpeg
8A019EED-EAD6-40F0-A9E7-3803097EF9E3.jpeg
451F05EB-F0E8-425F-BE24-B158572588C8.jpeg
Dec 20, 2021
Started left wing
- (9 hours)
Category: Wings
Riveted the left wing skeleton together
903D3B4D-93BD-442D-8075-C9D4E772C4F4.jpeg
882FF588-1317-42AA-9640-96D302FF7B0C.jpeg
Nov 14, 2021
Completed wing tip and started left wing
- (16 hours)
Category: Wings
Final assembly of right wing tip and light on right wing. Started assembly of the left wing.
CC0EA3FA-8170-485B-B6DC-8F8FF94DBC8E.jpeg
CF6FB9A6-27E0-411C-86DB-C011D27F0730.jpeg
14C03B31-7CB8-4BD3-84C3-ADA3F76E3EB3.jpeg
02895B54-0C91-49DE-9E82-F1B7F26E9EE4.jpeg
7E029980-3A77-4968-B877-833938E0D5F8.jpeg
87ACBBD1-0716-4239-BD24-E5410A7DCD77.jpeg
Nov 06, 2021
Continued right wing
- (16 hours)
Category: Wings
Completed wiring for right wing. Mounted remote magnetometer. Wiring all runs along the trailing edge. Completed sheeting the wing top and bottom. Left inboard skin and trailing edge clecoed until after wings are mounted.
21E5CF12-B51D-46BA-8E00-F78278FD375C.jpeg
15E150E1-D16E-4EBF-BA0F-730D622A94C3.jpeg
1053B01C-242B-41B9-805F-D6486DE62382.jpeg
A5A8CCDF-39DF-4243-BAEF-AB7B28F258CD.jpeg
F4D57963-0E1A-4267-B5DA-8AF9A7DCA53B.jpeg
3722A4AE-52F0-42AB-A496-92C6B3E2E15B.jpeg
D20FB185-E0FB-4B36-B24A-5670EB023431.jpeg
Oct 24, 2021
Right Wing
- (5 hours)
Category: Wings
76.113.38.63+7fFimyg9o-30F035B2-0BEC-4F3B-950D-C6F1F9A71BF7.jpeg
76.113.38.63+7fFimyg9o-3A77179C-4B56-44C2-BE9D-790EA76CE58E.jpeg
76.113.38.63+7fFimyg9o-6B5020B3-B1C3-4C37-861E-B52424B91742.jpeg
76.113.38.63+7fFimyg9o-73AA4247-EB81-4352-A344-6D61A0161E9D.jpeg
76.113.38.63+7fFimyg9o-7D9E10C3-12D8-4371-9DB7-B4B8D766EA1D.jpeg
76.113.38.63+7fFimyg9o-8BE75001-A298-4CAB-8954-A367E7ECE332.jpeg
76.113.38.63+7fFimyg9o-ACBC3D29-5AC6-453D-829A-B449131E5FC7.jpeg
Oct 24, 2021
Started skeleton of Right Wing
- (8 hours)
Category: Wings
Started assembling the right-wing skeleton.
IMG_3606.jpg
IMG_3607.jpg
IMG_3613.jpg
IMG_3614.jpg
IMG_3615.jpg
IMG_E3612.jpg
Oct 30, 2021
Wings right Started bottom skin
- (3 hours)
Category: Wings
Started to cleco bottom skin to skeleton of right wing
76.113.38.63+7fFimyg9o-5449A4D8-E644-43F8-9B20-09796E1F3A30.jpeg
76.113.38.63+7fFimyg9o-5ABDB691-97A9-4EE9-B025-C79AC165A571.jpeg
76.113.38.63+7fFimyg9o-6FBC8AE5-97D3-481C-853E-2A38752DAABA.jpeg
76.113.38.63+7fFimyg9o-A7A0BA73-6EA9-41B8-9C01-6BC5FC5A242D.jpeg
76.113.38.63+7fFimyg9o-B4A03F07-9981-421F-B051-3A0F340C7862.jpeg
76.113.38.63+7fFimyg9o-BFCA5B9D-F693-4954-84FC-458DE2A937A5.jpeg
76.113.38.63+7fFimyg9o-E30942F6-DEF6-40C2-A55C-53FF145FCB01.jpeg
Oct 31, 2021
Right wing continued
- (9 hours)
Category: Wings
Completed skinning the bottom of the right-wing, next is wiring.
76.113.38.63+7fFimyg9o-06E0F54D-667D-4139-B28D-4DD399910712.jpeg
76.113.38.63+7fFimyg9o-56CE1F42-CEFE-4265-B7E3-E24398F34BB8.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.