Project: JMillette   -  
            Listing for Category : controls
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Joseph Millette   -  
Project:   Zenith   -   VIEW REPORTS
Total Hours:1151
Total Flight Time:
Start/Last Date:Jul 30, 2020 - Mar 31, 2022
Engine:Viking 130
Propeller:Whirlwind
Panel:GRT 10.1 Sport
 
Friendly URL: https://eaabuilderslog.org?s=JMillette

Home or Last Project Picture

Oct 09, 2022     Installed Flaperons - (8 hours)       Category: Controls
Next step is to disassemble and prep for paint.


 
Oct 02, 2022     Flaperons - (9 hours)       Category: Controls
Completed the construction of Passenger side Outboard and Both inboard flaperons. Next week will begin mounting and preliminary rigging so that I can prepare to disassemble and prep for paint of remaining parts, Wing, Horizontal, Vertical etc…


 
Sep 26, 2022     Building of Flaperon (part1) - (6 hours)       Category: Controls
Started assembling the pilot side O/BFlapperon


 
Jul 27, 2022     Parking Brake - (4 hours)       Category: Controls
I have installed parking brake control cable.I am unhappy with the installation and will redo it once a new cable arrives.


 
Jul 25, 2022     Steering Linkage - (5 hours)       Category: Controls
installed steering linkage and started to decide on routing of wiring from wing to fuselage. Completed EFIS Mod Per manufacture


 
Feb 27, 2021     Mocked up Rudder controls - (8 hours)       Category: Controls
Installed Rudder pedals.


 
Feb 06, 2021     Mocked up controls/Final Install - (16 hours)       Category: Controls
Today was setting up the flight controls, mocked everything up to the best that i can with out the surfaces attached. decided to prime the parts and reinstall with grease. Missing one castle nut. Placed order with aircraft spruce.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.