EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
HMCRV12
-
Listing for Category : tailcone
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (106)
Research
Workshop
- (5)
Empennage
- (6)
Fuselage
- (16)
Firewall
Tail Feathers
Wings
- (22)
Controls
- (1)
Avionics
Lighting
- (1)
Instrument Panel
Landing Gear
- (2)
Engine
- (1)
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
- (1)
Tailcone
- (14)
Stabilator
- (14)
Rudder
- (8)
V Stabilizer
- (9)
AntiServoTab
- (4)
DrillBitHold
- (2)
Builder Name:
David Harris
-
Project:
Vans - RV-12iS
-
VIEW REPORTS
Total Hours:
235.5
Total Flight Time:
0.3
Total Expense:
N/A
Start/Last Date:
Aug 25, 2021 - No Finish Date
Engine:
Rotax 912is
Propeller:
Sensenich Ground Adjustable Composite
Friendly URL:
https://eaabuilderslog.org?s=HMCRV12
Home or Last Project Picture
Dec 08, 2021
Tailcone Assembly
- (3 hours)
Category: Tailcone
Attaching the vertical-stabilizer assembly to the tailcone assembly using fasteners, installing the lower hinge assembly, and temporarily installing the rudder assembly.
IMG_0730.jpg
IMG_0729.jpg
Dec 01, 2021
Riveting install doublers to servo tray
- (1.5 hours)
Category: Tailcone
20211201_183357.jpg
Nov 17, 2021
Riveting skins to tailcone
- (3 hours)
Category: Tailcone
Riveting the skins to the tailcone
tailcone.jpg
Nov 03, 2021
Attaching skin, wires to tailcone
- (2.5 hours)
Category: Tailcone
Attaching skin and wires to the tailcone from the inside
tailcone.jpg
Oct 27, 2021
Installing the static air system
- (1.5 hours)
Category: Tailcone
Screen Shot 2021-10-27 at 8.18.58 PM.png
Screen Shot 2021-10-27 at 8.19.10 PM.png
Screen Shot 2021-10-27 at 8.19.20 PM.png
Oct 20, 2021
Tailcone fuselage bulkhead and skins
- (2.5 hours)
Category: Tailcone
Prepped the tailcone for the fuselage bulkhead and skins. Attached the fuselage bulkhead.
IMG_3139.jpg
IMG_3145.jpg
IMG_3149.jpg
Oct 13, 2021
Constructing tailcone-fuselage bulkhead
Category: Tailcone
IMG_9298.jpg
Oct 13, 2021
Assembling tailcone
Category: Tailcone
IMG_9295.jpg
Oct 06, 2021
Match drilling Fuselage bulkhead
- (3 hours)
Category: Tailcone
IMG_6315.jpg
Oct 06, 2021
Assembling Tailcone Skins
- (3 hours)
Category: Tailcone
IMG_6314.jpg
Sep 29, 2021
Deburring Tailpieces
- (3 hours)
Category: Tailcone
IMG-2409.jpg
Sep 22, 2021
Fabricating the skid bracket for the tail cone
- (3 hours)
Category: Tailcone
Match drilling holes in the skid bracket for the tail cone
IMG_5730.jpeg
IMG_5729.jpeg
Sep 15, 2021
Fluting tailcone ribs
- (3 hours)
Category: Tailcone
Fluting the tailcone ribs so that the parts lay flat when riveting
IMG_6573.jpg
Sep 08, 2021
Breaking edges of the top and bottom skins of the tailbone
- (2.5 hours)
Category: Tailcone
Breaking edges of tailcone skin (F-1278, F-1280-L&R, F-1281-L&R, F-01282L) using the breaker. Broke them in the direction of the J-stiffener. F-1278 increase the break towards the back. Skipped the deburring because it wasn't effective
IMG_1139.jpg
IMG_1143.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.