EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
HMCRV12
-
Listing for Category : wings
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (106)
Research
Workshop
- (5)
Empennage
- (6)
Fuselage
- (16)
Firewall
Tail Feathers
Wings
- (22)
Controls
- (1)
Avionics
Lighting
- (1)
Instrument Panel
Landing Gear
- (2)
Engine
- (1)
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
- (1)
Tailcone
- (14)
Stabilator
- (14)
Rudder
- (8)
V Stabilizer
- (9)
AntiServoTab
- (4)
DrillBitHold
- (2)
Builder Name:
David Harris
-
Project:
Vans - RV-12iS
-
VIEW REPORTS
Total Hours:
235.5
Total Flight Time:
0.3
Total Expense:
N/A
Start/Last Date:
Aug 25, 2021 - No Finish Date
Engine:
Rotax 912is
Propeller:
Sensenich Ground Adjustable Composite
Friendly URL:
https://eaabuilderslog.org?s=HMCRV12
Home or Last Project Picture
Apr 26, 2023
Ready for flight?
- (2.5 hours)
Category: Wings
Wings aligned and attached for first time
IMG_9067.jpg
Mar 22, 2023
Flaperon pushrod
- (3.5 hours)
Category: Wings
Using the mill to drill holes in the flaperon pushrod.
IMG_7180.jpg
Mar 23, 2022
Riveting Stiffening Clips
Category: Wings
Drilled out rivets, Put rivets in stiffening clips
IMG_1059.jpeg
Mar 23, 2022
Pushrod to actuator to stabilator
Category: Wings
attaching the pushrod to the actuator to the stabilator
IMG_1062.jpeg
Mar 23, 2022
Riviting wing tips skins
Category: Wings
Riveted the wing tips to install the extensions of the molex connector.
IMG_1060.jpeg
IMG_1061.jpeg
Mar 02, 2022
Wing Fairing Electrical
- (2 hours)
Category: Wings
Sanding of flox in molding of fiberglass wing tip light mounts, preparation of electrical wiring related to the area.
FiberglassWingEndsWork.jpg
Mar 02, 2022
Electrical Work on Wings
- (2 hours)
Category: Wings
Attachment of lighting devices to interior of wing fairings and electrical wiring work.
Wing Fairings Electrical.jpg
Mar 02, 2022
Positional Lights Installed
- (2 hours)
Category: Wings
Positional lights on both wings continuous tested, installed with Plexiglas covers; bolting and riveting in immediate area completed.
PositionalLightInstallation.jpg
WingLightsTesting.jpg
Feb 23, 2022
Wing lights
- (3 hours)
Category: Wings
Drill holes and countersink and deburr
Wing lights.jpg
Feb 23, 2022
Wing tip
- (2 hours)
Category: Wings
Epoxied wing tip and applied release
Wing tip.jpg
Dec 08, 2021
Wing Lights
- (2 hours)
Category: Wings
Installing the wing lights.
IMG_0726.jpg
IMG_0727.jpg
Nov 17, 2021
Riveting the skins to the wing
- (3 hours)
Category: Wings
Riveting skins to the left wing
wings.jpg
Nov 03, 2021
Wing Light Installation
- (2.5 hours)
Category: Wings
Installing the covers for the landing lights on the wings
winglight.jpg
Oct 27, 2021
Wing skins
- (1.5 hours)
Category: Wings
Finishing adding the skins to the wings. Focusing on the wing tip.
Screen Shot 2021-10-27 at 8.21.19 PM.png
Oct 20, 2021
Wing Tips
- (2.5 hours)
Category: Wings
Manufactured landing light cover, attached wing tip aft skin
IMG_3146.jpg
IMG_3147.jpg
Oct 13, 2021
Bending tabs on wing tips
- (2.5 hours)
Category: Wings
IMG_9299.jpg
Oct 06, 2021
Priming and sealing the Wing Walks
- (3 hours)
Category: Wings
IMG_6310.jpg
Sep 29, 2021
Inspecting wing ribs
- (3 hours)
Category: Wings
IMG-2401.jpg
Sep 22, 2021
Riveting the wings
- (3 hours)
Category: Wings
Riveting on the wing skins for the right wing
IMG_5725.jpeg
IMG_5728.jpeg
Sep 15, 2021
Attaching Wig Skins (left wing)
- (3 hours)
Category: Wings
Installing rivets to attach wing skins to left wing.
IMG_6580.jpg
IMG_6582.jpg
Sep 08, 2021
Left Wing Riveting and flaperons
- (2.5 hours)
Category: Wings
Popping Rivets on the wing.
Put rod-end bearings on the flaperon A-1206 Pivot Brackets and let the thin film of Loctile 243 cure it for 24 hours
IMG_1145.jpg
IMG_1146-2.jpg
IMG_1147-2.jpg
Sep 01, 2021
First Build Day: Riveting the Wings
- (1 hour)
Category: Wings
7-12 students spent 1 hour inserting pop rivets into the wings (number of builders varied over the hour). For most builders, it was their first time working on the plane or riveting.
airplane4.jpg
airplane3.jpg
airplane2.jpg
airplane1.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.