Project: HMCRV12   -  
            Listing for Category : wings
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:David Harris   -  
Project:   Vans - RV-12iS   -   VIEW REPORTS
Total Hours:235.5
Total Flight Time:0.3
Total Expense:N/A
Start/Last Date:Aug 25, 2021 - No Finish Date
Engine:Rotax 912is
Propeller:Sensenich Ground Adjustable Composite
 
Friendly URL: https://eaabuilderslog.org?s=HMCRV12

Home or Last Project Picture

Apr 26, 2023     Ready for flight? - (2.5 hours)       Category: Wings
Wings aligned and attached for first time


 
Mar 22, 2023     Flaperon pushrod - (3.5 hours)       Category: Wings
Using the mill to drill holes in the flaperon pushrod.


 
Mar 23, 2022     Riveting Stiffening Clips       Category: Wings
Drilled out rivets, Put rivets in stiffening clips


 
Mar 23, 2022     Pushrod to actuator to stabilator       Category: Wings
attaching the pushrod to the actuator to the stabilator


 
Mar 23, 2022     Riviting wing tips skins       Category: Wings
Riveted the wing tips to install the extensions of the molex connector.


 
Mar 02, 2022     Wing Fairing Electrical - (2 hours)       Category: Wings
Sanding of flox in molding of fiberglass wing tip light mounts, preparation of electrical wiring related to the area.


 
Mar 02, 2022     Electrical Work on Wings - (2 hours)       Category: Wings
Attachment of lighting devices to interior of wing fairings and electrical wiring work.


 
Mar 02, 2022     Positional Lights Installed - (2 hours)       Category: Wings
Positional lights on both wings continuous tested, installed with Plexiglas covers; bolting and riveting in immediate area completed.


 
Feb 23, 2022     Wing lights - (3 hours)       Category: Wings
Drill holes and countersink and deburr


 
Feb 23, 2022     Wing tip - (2 hours)       Category: Wings
Epoxied wing tip and applied release


 
Dec 08, 2021     Wing Lights - (2 hours)       Category: Wings
Installing the wing lights.


 
Nov 17, 2021     Riveting the skins to the wing - (3 hours)       Category: Wings
Riveting skins to the left wing


 
Nov 03, 2021     Wing Light Installation - (2.5 hours)       Category: Wings
Installing the covers for the landing lights on the wings


 
Oct 27, 2021     Wing skins - (1.5 hours)       Category: Wings
Finishing adding the skins to the wings. Focusing on the wing tip.


 
Oct 20, 2021     Wing Tips - (2.5 hours)       Category: Wings
Manufactured landing light cover, attached wing tip aft skin


 
Oct 13, 2021     Bending tabs on wing tips - (2.5 hours)       Category: Wings


 
Oct 06, 2021     Priming and sealing the Wing Walks - (3 hours)       Category: Wings


 
Sep 29, 2021     Inspecting wing ribs - (3 hours)       Category: Wings


 
Sep 22, 2021     Riveting the wings - (3 hours)       Category: Wings
Riveting on the wing skins for the right wing


 
Sep 15, 2021     Attaching Wig Skins (left wing) - (3 hours)       Category: Wings
Installing rivets to attach wing skins to left wing.


 
Sep 08, 2021     Left Wing Riveting and flaperons - (2.5 hours)       Category: Wings
Popping Rivets on the wing.
Put rod-end bearings on the flaperon A-1206 Pivot Brackets and let the thin film of Loctile 243 cure it for 24 hours


 
Sep 01, 2021     First Build Day: Riveting the Wings - (1 hour)       Category: Wings
7-12 students spent 1 hour inserting pop rivets into the wings (number of builders varied over the hour). For most builders, it was their first time working on the plane or riveting.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.