EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
pparker
-
Last 10 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (123)
Research
- (1)
Workshop
- (1)
Empennage
Fuselage
- (32)
Firewall
Tail Feathers
- (6)
Wings
- (51)
Controls
- (2)
Avionics
Lighting
Instrument Panel
Landing Gear
- (2)
Engine
- (2)
Propeller
Fuel System
- (2)
Interior Finish
- (3)
Paint / Decals
- (16)
Inspection
- (5)
Tools
Builder Name:
Percy Parker
-
Project:
Fisher FP101
-
VIEW REPORTS
Total Hours:
395.2
Total Flight Time:
3.9
Total Expense:
$17585.76
Start/Last Date:
Nov 26, 2022 - Nov 18, 2023
Friendly URL:
https://eaabuilderslog.org?s=pparker
Home or Last Project Picture
Nov 18, 2023
Inspection, November 18, 2023
- (4.1 hours)
Category: Inspection
The inspection ended up being worse than I expected. The Left wing has every rib broken, the main spar broken in at least two places, the aft spar is broken, and the leading edge is broken in two places. The wing root on the left wing is broken. The right wing had three broken ribs. The fuselage lower right longeron is broken along with the stringers in the lower right side.
I don't believe there is any way to repair this aircraft to make it safe and airworthy. This project is ended here.
IMG_8474a.jpg
IMG_8475a.jpg
IMG_8476a.jpg
IMG_8477a.jpg
IMG_8488a.jpg
IMG_8498a.jpg
IMG_8508a.jpg
IMG_8518a.jpg
IMG_8519a.jpg
IMG_8520a.jpg
IMG_8521a.jpg
IMG_8522a.jpg
IMG_8523a.jpg
IMG_8524a.jpg
IMG_8525a.jpg
IMG_8526a.jpg
IMG_8527a.jpg
IMG_8528a.jpg
IMG_8529a.jpg
IMG_8530a.jpg
IMG_8531a.jpg
IMG_8532a.jpg
IMG_8533a.jpg
IMG_8534a.jpg
IMG_8535a.jpg
IMG_8536a.jpg
IMG_8537a.jpg
IMG_8538a.jpg
IMG_8539a.jpg
Nov 17, 2023
Engine, November 17, 2023
- (1 hour)
Category: Engine
Irony of ironies, my engine is ready for the test run and shipping. Made the finial payment on the engine. A Verner 3VLA, 3-cylinder radial engine.
Nov 17, 2023
Painting, November 17, 2023
- (1.7 hours)
Category: Paint / Decals
An odd winter storm hit last night. My paint booth bent and folded over. I had to bail at least one hundred gallons of water off the canvas and folds. The left wing was crushed, the right wing had three broken ribs. The fuselage has a broken longeron on the lower right side. I am so heartbroken, that I have to wait until tomorrow to do a full inspection of the damage.
IMG_8448a.jpg
IMG_8449a.jpg
IMG_8450a.jpg
IMG_8451a.jpg
IMG_8452a.jpg
IMG_8453a.jpg
IMG_8454a.jpg
IMG_8455a.jpg
IMG_8456a.jpg
IMG_8457a.jpg
IMG_8458a.jpg
IMG_8459a.jpg
IMG_8460a.jpg
IMG_8461a.jpg
IMG_8462a.jpg
IMG_8463a.jpg
IMG_8464a.jpg
IMG_8465a.jpg
IMG_8467a.jpg
IMG_8468a.jpg
IMG_8469a.jpg
IMG_8470a.jpg
IMG_8471a.jpg
IMG_8472a.jpg
IMG_8473a.jpg
Nov 16, 2023
Painting, November 16, 2023
- (4.7 hours)
Category: Paint / Decals
Spent the time putting on the first cross-coat of Poly-Tone. The Blue color looks great. Photos will come tomorrow.
Nov 15, 2023
Painting, November 15, 2023
- (1.5 hours)
Category: Paint / Decals
Taped off the areas for the Poly-Tone paint applications and put on paper guards for the overspray.
IMG_8443a.jpg
IMG_8444a.jpg
IMG_8445a.jpg
IMG_8446a.jpg
IMG_8447a.jpg
Nov 14, 2023
Parts Purchase, November 14, 2022
- (.2 hour)
Category: Paint / Decals
Ordered Parts from Aircraft Spruce. Tires, inner tubes, Altimeter, Airspeed Indicator, and Throttle and mixture lever.
Nov 14, 2023
Painting, November 14, 2023
- (6.6 hours)
Category: Paint / Decals
Continued the Poly-Spray application.
IMG_8441a.jpg
IMG_8442a.jpg
Nov 13, 2023
Painting, November 13, 2023
- (4.7 hours)
Category: Paint / Decals
Finished with the Poly-Brush spraying. I added the fuselage fairings. I attached the cabin door. I taped off some areas and began using the Poly-Spray ultraviolet coat.
IMG_8426a.jpg
IMG_8427a.jpg
IMG_8428a.jpg
IMG_8429a.jpg
IMG_8430a.jpg
IMG_8431a.jpg
IMG_8432a.jpg
IMG_8433a.jpg
IMG_8434a.jpg
IMG_8435a.jpg
IMG_8436a.jpg
IMG_8437a.jpg
IMG_8438a.jpg
IMG_8439a.jpg
Nov 12, 2023
Painting, November 12, 2023
- (1.9 hours)
Category: Paint / Decals
Nov 11, 2023
Painting, November 11, 2023
- (6.9 hours)
Category: Paint / Decals
Continued the application of Poly Brush. I painted the fuselage, horizontal stabilizer, and elevator. You can see how dark they have gotten with a single cross coat and a straight coat.
IMG_8421a.jpg
IMG_8422a.jpg
IMG_8423a.jpg
IMG_8424a.jpg
IMG_8425a.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.