EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
pparker
-
Listing for Category : fuselage
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (123)
Research
- (1)
Workshop
- (1)
Empennage
Fuselage
- (32)
Firewall
Tail Feathers
- (6)
Wings
- (51)
Controls
- (2)
Avionics
Lighting
Instrument Panel
Landing Gear
- (2)
Engine
- (2)
Propeller
Fuel System
- (2)
Interior Finish
- (3)
Paint / Decals
- (16)
Inspection
- (5)
Tools
Builder Name:
Percy Parker
-
Project:
Fisher FP101
-
VIEW REPORTS
Total Hours:
395.2
Total Flight Time:
3.9
Total Expense:
$17585.76
Start/Last Date:
Nov 26, 2022 - Nov 18, 2023
Friendly URL:
https://eaabuilderslog.org?s=pparker
Home or Last Project Picture
Oct 14, 2023
Fuselage October 14, 2023
- (6.4 hours)
Category: Fuselage
Continued strut and fairing fabrications for HS and VS.
IMG_7772a.jpg
IMG_7773a.jpg
IMG_7774a.jpg
IMG_7775a.jpg
IMG_7776a.jpg
IMG_7777a.jpg
IMG_7778a.jpg
IMG_7779a.jpg
IMG_7780a.jpg
IMG_7783a.jpg
IMG_7784a.jpg
IMG_7785a.jpg
IMG_7786a.jpg
Oct 13, 2023
Fuselage October 13, 2023
Category: Fuselage
Fabricated and attached HS struts and fabricated fairing for VS.
IMG_7697a.jpg
IMG_7707a.jpg
IMG_7717a.jpg
IMG_7727a.jpg
IMG_7737a.jpg
IMG_7757a.jpg
IMG_7759a.jpg
IMG_7761a.jpg
IMG_7762a.jpg
IMG_7763a.jpg
IMG_7764a.jpg
IMG_7765a.jpg
IMG_7766a.jpg
IMG_7767a.jpg
IMG_7768a.jpg
IMG_7769a.jpg
IMG_7770a.jpg
Oct 12, 2023
Fuselage October 12, 2023
- (2.2 hours)
Category: Fuselage
Test fitting, adjusting, and attaching HS, VS and elevator.
IMG_7683a.jpg
IMG_7684a.jpg
IMG_7685a.jpg
IMG_7687a.jpg
IMG_7688a.jpg
IMG_7689a.jpg
IMG_7690a.jpg
IMG_7691a.jpg
IMG_7692a.jpg
IMG_7693a.jpg
IMG_7694a.jpg
IMG_7695a.jpg
IMG_7696a.jpg
Oct 11, 2023
Fuselage October 11, 2023
- (1.7 hours)
Category: Fuselage
Continued work on the windshield.
IMG_7651a.jpg
IMG_7652a.jpg
IMG_7653a.jpg
IMG_7654a.jpg
IMG_7656a.jpg
IMG_7657a.jpg
IMG_7658a.jpg
IMG_7668a.jpg
IMG_7678a.jpg
IMG_7679a.jpg
IMG_7680a.jpg
IMG_7681a.jpg
IMG_7682a.jpg
Oct 10, 2023
Fuselage October 10, 2023
- (6.0 hours)
Category: Fuselage
Re-enforced the HS, and Elevator. Fabricated fairings and windshield.
IMG_7500a.jpg
IMG_7501a.jpg
IMG_7502a.jpg
IMG_7504a.jpg
IMG_7505a.jpg
IMG_7507a.jpg
IMG_7517a.jpg
IMG_7527a.jpg
IMG_7537a.jpg
IMG_7547a.jpg
IMG_7557a.jpg
IMG_7567a.jpg
IMG_7577a.jpg
IMG_7587a.jpg
IMG_7597a.jpg
IMG_7598a.jpg
IMG_7599a.jpg
IMG_7600a.jpg
IMG_7601a.jpg
IMG_7611a.jpg
IMG_7621a.jpg
IMG_7622a.jpg
IMG_7623a.jpg
IMG_7624a.jpg
IMG_7625a.jpg
IMG_7626a.jpg
IMG_7627a.jpg
IMG_7629a.jpg
IMG_7639a.jpg
IMG_7649a.jpg
IMG_7650a.jpg
RenderedImagea.jpg
Oct 09, 2023
Parts Purchase, October 09, 2023
- (.2 hour)
Category: Fuselage
Ordered nuts, bolts and steel tube for the fabrication of wheel axle sockets.
Oct 07, 2023
Fuselage October 07, 2023
- (3.2 hours)
Category: Fuselage
Fabricated and installed the brackets were the HS attaches to the fuselage. Had to open a rear inspection whole to complete the installation. Since I was cutting open the rear one, I opened the two forward inspection wholes also. I need them to attach the wings to the fuse.
IMG_7351a.jpg
IMG_7352a.jpg
IMG_7362a.jpg
IMG_7372a.jpg
IMG_7382a.jpg
IMG_7392a.jpg
IMG_7393a.jpg
IMG_7394a.jpg
IMG_7395a.jpg
IMG_7396a.jpg
IMG_7397a.jpg
IMG_7398a.jpg
IMG_7399a.jpg
IMG_7409a.jpg
IMG_7419a.jpg
IMG_7429a.jpg
IMG_7439a.jpg
IMG_7449a.jpg
IMG_7459a.jpg
IMG_7469a.jpg
IMG_7479a.jpg
IMG_7490a.jpg
IMG_7491a.jpg
IMG_7492a.jpg
Oct 06, 2023
Fuselage October 06, 2023
- (2.8 hours)
Category: Fuselage
Removed the firewall to get access to the brakes. This confirmed the need for another master cylinder. The type I am using have an internal reservoir eliminating the need for me to attach a reservoir forward of the firewall. I also found out that I require a socket to be welded to attach the axles to the landing gear.
10062023 Friday.jpg
Oct 05, 2023
Fuselage October 05, 2023
- (1.5 hours)
Category: Fuselage
Re-epoxy glued the parts that were separated/broken from the other day. Installed the seat and attached the cushions. Received the MATCO wheel and Brake assembly and completed the inventory. I realized that I needed to order an additional master cylinder.
IMG_7310a.jpg
IMG_7311a.jpg
IMG_7312a.jpg
IMG_7322a.jpg
IMG_7332a.jpg
IMG_7342a.jpg
IMG_7343a.jpg
IMG_7344a.jpg
IMG_7345a.jpg
IMG_7346a.jpg
IMG_7347a.jpg
IMG_7348a.jpg
IMG_7349a.jpg
Oct 03, 2023
Fuselage October 03, 2023
- (3.3 hours)
Category: Fuselage
Oops, I dropped the fuselage while moving it to its new location and broke a couple of the glued joints. Now, I have to cut into the freshly attached skin and make the repairs. I also did a test fit of the HS, VS and elevator.
IMG_7061a.jpg
IMG_7062a.jpg
IMG_7063a.jpg
IMG_7073a.jpg
IMG_7120a.jpg
IMG_7121a.jpg
IMG_7122a.jpg
IMG_7123a.jpg
IMG_7124a.jpg
IMG_7125a.jpg
IMG_7126a.jpg
IMG_7127a.jpg
IMG_7128a.jpg
IMG_7129a.jpg
IMG_7130a.jpg
IMG_7131a.jpg
IMG_7138a.jpg
Oct 02, 2023
Fuselage October 02, 2023
- (4.5 hours)
Category: Fuselage
Put first coating of Poly-Brush on the fuselage. Install electronic fuel float system onto the fuel tank. Attached Velcro to seat cushions.
IMG_6933a.jpg
IMG_6934a.jpg
IMG_6935a.jpg
IMG_6936a.jpg
IMG_6937a.jpg
IMG_6938a.jpg
IMG_6948a.jpg
IMG_6949a.jpg
IMG_6950a.jpg
IMG_6960a.jpg
IMG_6970a.jpg
IMG_6980a.jpg
IMG_6990a.jpg
IMG_7001a.jpg
IMG_7011a.jpg
IMG_7021a.jpg
IMG_7031a.jpg
IMG_7042a.jpg
IMG_7043a.jpg
IMG_7044a.jpg
IMG_7045a.jpg
Sep 28, 2023
Covering, September 28, 2023
- (3.8 hours)
Category: Fuselage
Finished the and started working on the tailwheel. Had to remove the old tailwheel hardware and tried to figure out how attach the new leaf spring type tailwheel to the fuselage.
Sep 27, 2023
Covering, September 27, 2023
- (6.4 hours)
Category: Fuselage
Glued the covering to the remainder of the fuse and tightened the fuselage covering.
IMG_6905a.jpg
IMG_6906a.jpg
IMG_6907a.jpg
IMG_6908a.jpg
IMG_6909a.jpg
IMG_6910a.jpg
IMG_6911a.jpg
IMG_6912a.jpg
IMG_6913a.jpg
IMG_6914a.jpg
IMG_6915a.jpg
IMG_6916a.jpg
IMG_6917a.jpg
Sep 22, 2023
Seat, September 22, 2023
- (5.3 hours)
Category: Fuselage
I made and cut Seat cover patterns. I attached pattern piece to fabric and cut them out and test fitted them to the foam.
IMG_6880a.jpg
IMG_6881a.jpg
IMG_6882a.jpg
IMG_6883a.jpg
Sep 20, 2023
Fuselage, September 20, 2023
- (3.4 hours)
Category: Fuselage
I varnished parts not already treaded. I also re-attached some of the fabric to the fuselage.
IMG_6865.jpg
IMG_6875a.jpg
IMG_6876a.jpg
IMG_6877a.jpg
Sep 19, 2023
Seat, September 19, 2023
- (5.4 hours)
Category: Fuselage
Continued with seat construction. Cut and glued pieces to form seat and back cushions. Also, fabricated brackets for control pullies.
IMG_6848a.jpg
IMG_6849a.jpg
IMG_6850a.jpg
IMG_6851a.jpg
IMG_6852a.jpg
IMG_6853a.jpg
IMG_6854a.jpg
IMG_6855a.jpg
IMG_6856a.jpg
IMG_6857a.jpg
IMG_6858a.jpg
IMG_6860a.jpg
IMG_6861a.jpg
IMG_6863a.jpg
IMG_6864a.jpg
Sep 18, 2023
Seat, September 18, 2023
- (3.6 hours)
Category: Fuselage
Fuse: I attached the aft spare connector to the aft cockpit bulkhead. Seat fabrication; purchased seat foam from Joann's Fabric store. Made a pattern for the seat, and labeled the pieces required on the foam. I used two different heated foam cutters to cut out the pieces.
IMG_6688a.jpg
IMG_6698a.jpg
IMG_6708a.jpg
IMG_6718a.jpg
IMG_6738a.jpg
IMG_6748a.jpg
IMG_6749a.jpg
IMG_6752a.jpg
IMG_6762a.jpg
IMG_6772a.jpg
IMG_6792a.jpg
IMG_6812a.jpg
IMG_6822a.jpg
IMG_6832a.jpg
IMG_6842a.jpg
IMG_6843a.jpg
IMG_6844a.jpg
IMG_6845a.jpg
IMG_6846a.jpg
IMG_6847a.jpg
IMG_6750a.jpg
Sep 17, 2023
Seat, September 17, 2023
- (3.1 hours)
Category: Fuselage
Seat fabrication.
Sep 14, 2023
Fuselage, September 14, 2023
- (2.2 hours)
Category: Fuselage
Firewall and bonnet fitting. I made a new firewall and made adjustments to get a proper fit. the old firewall had too many wholes in it and I wanted a clear slate for when it comes time to mount the engine and put in lines through the firewall forward.
IMG_6607a.jpg
IMG_6608a.jpg
IMG_6609a.jpg
IMG_6610a.jpg
Sep 13, 2023
Fuselage September 13, 2023
- (1.2 hours)
Category: Fuselage
Completed fabrication of landing gear main tubes.
IMG_6594a.jpg
IMG_6604a.jpg
IMG_6605a.jpg
IMG_6606a.jpg
Sep 12, 2023
Fuselage, September 12, 2023
- (5.2 hours)
Category: Fuselage
Attached henges to the seat and seatback. Fabricated landing gear bended tubes.
IMG_6559a.jpg
IMG_6560a.jpg
IMG_6570a.jpg
IMG_6580a.jpg
IMG_6590a.jpg
IMG_6591a.jpg
IMG_6592a.jpg
IMG_6593a.jpg
Sep 11, 2023
Fuselage, September 11, 2023
- (2.4 hours)
Category: Fuselage
I use already existing lag bolt holes in the floor to temporarily set up a tube bender to begin test bends for the fabrication of landing gear.
IMG_6526a.jpg
IMG_6536a.jpg
IMG_6546a.jpg
IMG_6556a.jpg
IMG_6557a.jpg
Sep 08, 2023
Fuselage, September 08, 2023
- (1.6 hours)
Category: Fuselage
Test attached one wing to confirm that the attach points and control cables are properly aligned.
IMG_6473a.jpg
IMG_6474a.jpg
IMG_6475a.jpg
IMG_6476a.jpg
IMG_6477a.jpg
IMG_6478a.jpg
IMG_6479a.jpg
IMG_6480a.jpg
IMG_6481a.jpg
IMG_6482a.jpg
IMG_6483a.jpg
Sep 07, 2023
Fuselage, September 07, 2023
- (5.7 hours)
Category: Fuselage
Formed the cockpit upper braces. Constructed a mock-up of the Verner 3VLA engine that will be used on the aircraft.
IMG_6454a.jpg
IMG_6455a.jpg
IMG_6456a.jpg
IMG_6457a.jpg
IMG_6458a.jpg
IMG_6460a.jpg
IMG_6461a.jpg
IMG_6462a.jpg
IMG_6463a.jpg
IMG_6464a.jpg
IMG_6465a.jpg
IMG_6466a.jpg
IMG_6467a.jpg
IMG_6468a.jpg
IMG_6469a.jpg
IMG_6471a.jpg
IMG_6470a.jpg
Sep 06, 2023
Fuselage, September 06, 2023
- (2.8 hours)
Category: Fuselage
Fabricated pulley brackets. Removed excess wood from forward fuselage spar. Fabricated aligning jigs for the seat height.
IMG_6440.jpg
IMG_6441.jpg
IMG_6442.jpg
IMG_6443.jpg
IMG_6444.jpg
IMG_6445.jpg
IMG_6446.jpg
IMG_6447.jpg
IMG_6448.jpg
IMG_6449.jpg
IMG_6450.jpg
Sep 05, 2023
Fuselage, September 05, 2023
- (2.0 hours)
Category: Fuselage
Assembled the seat and completed a test fit.
IMG_6329a.jpg
IMG_6339a.jpg
IMG_6349a.jpg
IMG_6359a.jpg
IMG_6369a.jpg
IMG_6379a.jpg
IMG_6389a.jpg
IMG_6399a.jpg
IMG_6409a.jpg
IMG_6419a.jpg
IMG_6429a.jpg
Sep 04, 2023
Fuselage, September 04, 2023
- (5.1 hours)
Category: Fuselage
Installed the main wing attaching points and varnished the wood of the seat.
IMG_6303a.jpg
IMG_6304a.jpg
IMG_6305a.jpg
IMG_6306a.jpg
IMG_6307a.jpg
IMG_6308a.jpg
IMG_6309a.jpg
IMG_6319a.jpg
Sep 03, 2023
Fuselage September 03, 2023
- (2.4 hours)
Category: Fuselage
Continued work on the seat. Also began work on the Wing attachment pieces.
IMG_6295a.jpg
IMG_6296a.jpg
IMG_6297a.jpg
IMG_6298a.jpg
IMG_6299a.jpg
IMG_6300a.jpg
IMG_6301a.jpg
IMG_6302a.jpg
Sep 03, 2023
Fuselage, September 03, 2023
- (3.0 hours)
Category: Fuselage
Sep 02, 2023
Fuselage, September 02, 2023
- (5.0 hours)
Category: Fuselage
Aug 29, 2023
Fuselage, August 29, 2023
- (2.1 hours)
Category: Fuselage
Beginning work on fuselage. I started with re-fitting the seat into its position by trimming the ends. I also repositioned the seat back.
IMG_6250a.jpg
IMG_6251a.jpg
IMG_6252a.jpg
IMG_6253a.jpg
IMG_6254a.jpg
IMG_6255a.jpg
IMG_6265a.jpg
IMG_6275a.jpg
Mar 02, 2023
Parts Purchase, March 02, 2022
- (.5 hour)
Category: Fuselage
Made the parts purchase for all of the repairs needed to the wood structure, tailwheel replacement, and gluing, prepping and sewing new covering on the FP-101.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.