EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
pparker
-
Listing for Category : tail feathers
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (123)
Research
- (1)
Workshop
- (1)
Empennage
Fuselage
- (32)
Firewall
Tail Feathers
- (6)
Wings
- (51)
Controls
- (2)
Avionics
Lighting
Instrument Panel
Landing Gear
- (2)
Engine
- (2)
Propeller
Fuel System
- (2)
Interior Finish
- (3)
Paint / Decals
- (16)
Inspection
- (5)
Tools
Builder Name:
Percy Parker
-
Project:
Fisher FP101
-
VIEW REPORTS
Total Hours:
395.2
Total Flight Time:
3.9
Total Expense:
$17585.76
Start/Last Date:
Nov 26, 2022 - Nov 18, 2023
Friendly URL:
https://eaabuilderslog.org?s=pparker
Home or Last Project Picture
Jun 30, 2023
Wing Repair, June 30, 2023
- (1.2 hours)
Category: Tail Feathers
Removed clamps then transported right wing from the hangar to my home shop for further work.
Had training flights on the 29th and 30th. Received my tailwheel endorsement on the 30th.
IMG_5788 (2).jpg
IMG_5789 (2).jpg
IMG_5790 (2).jpg
Jun 10, 2023
June 10, 2023
- (6.5 hours)
Category: Tail Feathers
Lacing and taping of the HS.
IMG_5610 (2).jpg
IMG_5611.jpg
IMG_5621.jpg
IMG_5631 (2).jpg
IMG_5632 (2).jpg
IMG_5633 (2).jpg
IMG_5634 (2).jpg
IMG_5635 (2).jpg
Jun 09, 2023
June 09, 2023
- (7.0 hours)
Category: Tail Feathers
I began ironing the HS and the fabric shrank and pulled away from the frame. I had to do some patch work. Then finished with the lacing set-up.
Yesterday I start on my tailwheel endorsement training. Had a great initial flight.
IMG_5525 (2).jpg
IMG_5526.jpg
IMG_5536.jpg
IMG_5546.jpg
IMG_5556.jpg
IMG_5566.jpg
IMG_5576.jpg
IMG_5586 (2).jpg
IMG_5587 (2).jpg
IMG_5588.jpg
IMG_5598.jpg
Jun 07, 2023
June 07, 2023
- (1.5 hours)
Category: Tail Feathers
I decided to use Poly Fiber products. The owner before me was using something else. That is why it's pink and green.
IMG_5501.jpg
IMG_5511.jpg
IMG_5521 (2).jpg
Jun 05, 2023
June 05, 2023
- (1.5 hours)
Category: Tail Feathers
Continued lace work.
Jun 02, 2023
June 02, 2023
- (2.1 hours)
Category: Tail Feathers
Began the ironing and lacing of the VS and Rudder.
IMG_5253 (2).jpg
IMG_5254 (2).jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.