Project: Patrol   -  
            Listing for Category : rib tooling
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Stan Timmerman   -  
Project:   Bearhawk - Patrol
Total Hours:1029.5
Total Expense:$10696.05
Start/Last Date:Jul 01, 2014 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=Patrol

Home or Last Project Picture

Sep 29, 2019     Master Tooling       Category: Rib Tooling
The Patrol plans come with a mylar sheet. The mylar sheet contains the airfoil shape. The sheet would not last long, so, it is glued to a piece of 032. The 032 sheet is carefully filed to the profile of the airfoil.

After the 032 airfoil master is made it is used as a template to make a MDF Form that contains all of the details of ribs.


 
Sep 29, 2019     Flange Tool       Category: Rib Tooling
Step 1 router a bunch of rib blanks all at once.
Step 2 debur edges.
Step 3 Press rib blank and make round flanges.
Step 4 Put blank with round flanges in a mdf assembly
Step 5 Rubber mallet $7
Step 6 Add scallops while slowly being formed


There are many ways of straightening potato chip rib once flanges are hammered.

This is my way of doing it:
Step 7 Place rib in my flange finish tool
Step 8 Press down- Clamp Flange edges with set screws.
Step 9 Use wooden dowel to force flutes into scalloped out mdf form
Step 10 Still have to over bend flange because of aluminum spring back.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.