EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
wstoelting
-
Listing for Category : engine
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (394)
Research
- (3)
Workshop
- (3)
Empennage
Fuselage
- (73)
Firewall
- (1)
Tail Feathers
- (5)
Wings
- (135)
Controls
- (7)
Avionics
- (7)
Lighting
- (2)
Instrument Panel
- (13)
Landing Gear
- (19)
Engine
- (41)
Propeller
- (5)
Fuel System
- (30)
Interior Finish
- (8)
Paint / Decals
- (22)
Inspection
- (2)
Tools
- (18)
Builder Name:
Wade Stoelting
-
Project:
Just - Highlander
-
VIEW REPORTS
Total Hours:
788.9
Total Flight Time:
Total Expense:
$68417.69
Start/Last Date:
Oct 09, 2019 - No Finish Date
Engine:
Yamaha Apex
Friendly URL:
https://eaabuilderslog.org?s=wstoelting
Home or Last Project Picture
Dec 15, 2023
Start your engine!
Category: Engine
Yahoo! Starting after 3 and half years. Video would not save. Saved to YouTube.
https://youtu.be/RITszWDpqu4?feature=shared
VideoCapture_20231215-094748.jpg
Aug 27, 2023
Exhaust Pipe
- (2 hours)
Category: Engine
Needed to fabricate exhaust pipe connection between header collector and mounted muffler. Ordered 2in elbow, 2 inch straight pipe, 2 to 2.5 adapter, band clamp, and sleeve clamp. Had a local guy weld up the 304 stainless pipe.
20230819_161657.jpg
Jun 25, 2023
Propeller Spacer Install
- (.5 hour)
Category: Engine
Purchased 10.9 grade 8mm x 1.25 40mm long bolts for spacer to psru installation. Purchased Nordlock washers (25 sets). Torqued down the bolts per in reference to bolt grade.
20230626_192106.jpg
Jun 17, 2023
EGT and O2 Sensor Routing
- (3 hours)
Category: Engine
Drilled holes through electrical tray, routed wires through tray. Mounted O2 Module, tightened thermal couple's to headers, drilled large hole through firewall, fabricated firewall bundle seal. Wired thermal couple's to connectors and installed.
20230617_202145.jpg
20230617_202133.jpg
May 06, 2023
Muffler
- (3.5 hours)
Category: Engine
Machined a hanger block from HDPE, tapped end of block for 1/4-20 bolt, cross drilled to mount to fuselage at unuesed landing gear bracket. Purchased rubber isolater, and used left over light mounting bracket at the cabane.
20230506_074927.jpg
Mar 28, 2023
Header
Category: Engine
What a work of art. I decided my fabrication and modification of a Suzuki Sammurai header from Amazon just would not be the most durable and performance way to go. So from a $200 product to a $1800 product seems crazy to me but the right decision for the long run.
20230328_173745.jpg
20230328_172051.jpg
Mar 04, 2023
Oil Cooler Line
- (1 hour)
Category: Engine
Received needed AN8 fitting having 90 degree bend. Constructed oil line, included fire sleeve and installed.
Feb 26, 2023
Coolant System/Expansion Tank
- (10 hours)
Category: Engine
Fittings, silicone coolant lines, clamps, expansion tank. Had a welder weld one aluminum fitting. Mounted tank to firewall, used rivnuts. Lots of time planning routing and etcetera.
20230219_140819.jpg
20230219_142417.jpg
20230215_163422.jpg
Jan 27, 2023
Coolant Line Couplers
Category: Engine
1 inch diameter coolant line couplers.
20230127_135325.jpg
Jan 24, 2023
Engine Management System
- (3 hours)
Category: Engine
Mounted the ECM, Ignition Control Module, Barometric sensor, fuel pump relays to underside of fabricated tray mount.
20230124_164157.jpg
Jan 24, 2023
Radiator/oil cooler remount
- (2 hours)
Category: Engine
Changed up the mounting of the Radiator and oil cooler to improve routing of coolant and oil lines.
20230124_164122.jpg
20230124_164133.jpg
Jan 20, 2023
Fuel, Oil, Water
Category: Engine
Silicone Coolant line, engine start switch, oil coolant line, fuel fittings.
20230120_161901.jpg
Jan 11, 2023
Fuel lines
Category: Engine
Fuel line fittings and hoses for firewall forward . Two oil cooler fittings too. Now will cut to length and assemble.
20230111_164704.jpg
Dec 04, 2022
Throttle Control
- (5 hours)
Category: Engine
Used some aluminum scrap bar material, and some solid round stock. Purchased some extension springs. Engine throttle cable is pulled to open throttle, pilots push throttle forward to open. The mechanism has a 2 to 4 ratio. Took some effort and a few iterations to make it all work. Will still revise wire rope cable on airplane throttle to music wire.
20221203_143205.jpg
20221203_131555.jpg
Dec 01, 2022
Battery
Category: Engine
ETX680C EarthX LiFePO4 battery for the plane. Lightweight and powerful.
20221201_184451.jpg
Nov 24, 2022
Systems Routing
- (10 hours)
Category: Engine
Routed engine harness through firewall and made connections on engine. Cut, rotated, welded coolant tubes at head to route to low side. Painted orange. Fabricated electronics rack from .040 5053 AL. ECM and many other electronics will attach here.
20221124_082939.jpg
20221124_082951.jpg
20221124_083009.jpg
20221124_083017.jpg
Oct 19, 2022
Firewall and Engine Install
- (6 hours)
Category: Engine
Cut boot cowl shape on firewall stainless steel sheet, located onto fuselage and drilled mounting holes. Riveted in place with CCP42 rivets. I did apply anticipating tape to tubing prior to firewall installation to minimize metal to metal rattle/buzz. Hoisted engine in place and mounted.
20221019_155634.jpg
20221019_101030.jpg
20221019_154340.jpg
Aug 15, 2022
Oil Cooler Mounting Hardware
Category: Engine
AN4-34a bolts and metal stop nuts to mount oil cooler.
20220815_191009.jpg
Jun 19, 2022
Radiator &Oil Cooler Mount
- (1.5 hours)
Category: Engine
Fabricated a better mount than my first one, added flanges to stiffen and determining best hardware selection for securing.
20220625_084432.jpg
Jun 15, 2022
EGT Bungs
- (1 hour)
Category: Engine
Gas welded stainless steel EGT bungs to stainless headers.
20220615_201307.jpg
May 18, 2022
Engine Management System
Category: Engine
Purchased BD Turnkey AEM EFI kit.
Harness+Layout+with+Labels+2.jpg
Feb 28, 2022
Exhaust Studs
- (.5 hour)
Category: Engine
Installed 8 studs into head. Used 8mmX1.25 38mm studs intended for VW air cooled engines.
20220228_112528.jpg
20220228_114330.jpg
Feb 19, 2022
Header
- (3.5 hours)
Category: Engine
Modifying Suzuki Sammurai Header. Cutoff flange from header, welded on flanges from APEX engine. $85 header, $115 for acetylene and welding rods.
20220219_184121.jpg
Feb 15, 2022
Radiator Mount
- (3 hours)
Category: Engine
Radiator from eBay, $171 plus mounting hardware for oil cooler and radiator. Fabricated sheet metal bracket.
20220215_192502.jpg
Feb 13, 2022
Oil Tank Fitting Spacer
- (3.5 hours)
Category: Engine
Machined an aluminum spacer to make hose clearance.
20220212_095414.jpg
20220213_113219.jpg
Jan 19, 2022
Airborne Bracket
- (.5 hour)
Category: Engine
Made a new supoort bracket for air intake that is more rigid and secure than first fabricated part.
20220119_191421.jpg
Jan 16, 2022
Oil Kit
Category: Engine
Synthetic oil, filter, plug gaskets.
20220116_191315.jpg
Jan 13, 2022
Thermostat Oil Bypass
- (4.5 hours)
Category: Engine
Removed oil/engine coolant heat exchanger. Machined from 6061 3 in round bar a housing for thermostat bypass. Purchased oil thermostat bypass, machined spacer. Installed onto engine. Ordered 8AN x 22mm fittings. Used bench top lathe/mill to make the parts.
20220113_170406.jpg
20220113_170043.jpg
Dec 30, 2021
Throttle Cable
Category: Engine
Quite an expensive a nice cable that I will cut up to fabricate what I need. I did not find a friction lock type for less.
20211230_165659.jpg
Dec 23, 2021
Finished Air Intake
- (4.5 hours)
Category: Engine
Cut 4 inch PVC pipe to length, shortened flange on end cap, located and drilled holes for throttle body tubes, made supporting brackets, painted end cap, applied carbon vinyl wrap to tube. Installed filter.
20211223_144539.jpg
20211223_144000.jpg
Dec 19, 2021
Oil Cooler, Fittings
Category: Engine
Engine oil cooler, 2 fuel line bulkhead fittings, 2 fuel line connection fittings.
20211216_060524.jpg
Dec 19, 2021
Airborne Materials
Category: Engine
4 inch PVC for air box and end cap, plus air filter.
20211219_155454.jpg
20211219_113336.jpg
20211219_115603.jpg
Nov 30, 2021
PSRU and Head Cover Install
- (4 hours)
Category: Engine
Cleaned head cover of corrosion and grime (magnesium), removed engine cover, cleaned gasket surfaces. Painted head cover with black wrinkle paint. Installed head cover and SkyTrax PSRU.
20211130_114213.jpg
20211130_114129.jpg
Nov 30, 2021
Head Cover Gasket
Category: Engine
New gasket for head cover for Apex Engine, torque seal for fasteners, retaining compound for PSRU drive gear installation.
20211130_114419.jpg
Nov 20, 2021
Spark Plugs
Category: Engine
New spark plugs for Apex engine.
20211120_084624.jpg
Aug 23, 2021
Muffler
Category: Engine
KTM dual sport bike muffler. Heavy but quiet.
20210823_164711.jpg
Apr 15, 2021
Engine Stand Engine Mount
- (3 hours)
Category: Engine
Fabricated engine mount so it could be hung on stand.
20210415_193152.jpg
Apr 12, 2021
SkyTrax PSRU Arrives
Category: Engine
$3500 + PayPal fees, shipping and insurance. Yikes.
20210412_173513.jpg
Apr 08, 2021
Removal From Snowmobile
- (3 hours)
Category: Engine
Removed Yamaha Apex Engine for 2007 Yamaha MTX.
20210405_172011.jpg
20210408_161025.jpg
20210408_164417.jpg
Oct 20, 2020
Engine Mount
Category: Engine
20201020_181251.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.