Project: wstoelting   -  
            Listing for Category : landing gear
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Wade Stoelting   -  
Project:   Just - Highlander   -   VIEW REPORTS
Total Hours:788.9
Total Flight Time:
Total Expense:$68417.69
Start/Last Date:Oct 09, 2019 - No Finish Date
Engine:Yamaha Apex
 
Friendly URL: https://eaabuilderslog.org?s=wstoelting

Home or Last Project Picture

Mar 25, 2023     Brakes and Wheels - (2 hours)       Category: Landing Gear
Installed brake flanges, installed calipers, made lines for linking dual calipers. Installed spacers and then wheels.


 
Mar 23, 2023     Wheel Spacers - (3.5 hours)       Category: Landing Gear
Needed spacers to mount and align wheel/brake rotor with caliper brake mount. Determined spacer width and so designed up what I desired and machined out of 6061T6 aluminum.


 
Mar 11, 2023     Installed Main Gear - (1 hour)       Category: Landing Gear
Installed main gear legs and Shock system. Greased bolts for install, used engine hoist to lift airframe. Discovered I did not have Aluminum axle sleeves to space wheel and brake caliper setup. Also determined the garage is no tall enough for me to install the tundra tires.


 
Mar 30, 2022     Wheel Seals for Tubeless Tires       Category: Landing Gear
Returned inner tubes, ordered Matco tubeless kit.


 
Mar 24, 2022     Tundra Tires       Category: Landing Gear
Purchased 27.5 " tall tundra Aero Classic tires that fit the Matco 8 inch wheel. I also purchased inner tubes. The inner tubes were $275. The tires can be run tubeless, uncertain if I will go without tubes.


 
Nov 23, 2021     Gear Leg to Fuselage Bolts       Category: Landing Gear


 
Nov 20, 2021     Left Main Gear Leg Covered - (4 hours)       Category: Landing Gear
Covered left gear legs with fabric and applied first coat of Polybrush.


 
Nov 13, 2021     Right Gear Leg Fabric Covering - (4.5 hours)       Category: Landing Gear
Covered right gear legs using Polyfiber process. Could have gone without but like the final look of airplane with gear legs covered.


 
Aug 05, 2021     Landing Gear Fit Up - (1.5 hours)       Category: Landing Gear
Reamed fuselage/gear mounting holes. Reamed gear leg holes, V cabane holes and shock connect holes. Mounted legs to fuselage, cabane to fuselage, installed shocks. Bolts provided for gear legs are to short.


 
Jul 02, 2021     Landing Gear - (1 hour)       Category: Landing Gear
Tk1 Shock Monster Gear arrives. Expensive but awesome.


 
Jul 01, 2021     Left Wing Fabric - (3 hours)       Category: Landing Gear
Applied last span wise fabric tapes. The Leading edge and trailing edge. Used 6 inch wide tape on leading, and two 3 inch tapes for trailing. Marked out straight tape lines with pencil. Applied Polybrush, dried. Then applied wet polybrush when laying down the tape. Finally add a second coat of polybrush over the tape. Ironed out any bubbles, wrinkles.


 
Jun 25, 2021     Gear Legs and Shocks       Category: Landing Gear
Purchased TK1 Monster Gear Legs and Struts.


 
Mar 21, 2020     Brake Line Routing - (1.5 hours)       Category: Landing Gear
Routed Matco brake lines between cylinders and parking brake valves.


 
Mar 19, 2020     Brake master cylinder installation - (2 hours)       Category: Landing Gear
Reamed mounting holes in fuselage and rudder pedal assembly. Fitted pedal brake mounts. Installed cylinders and marked drill points in pedal mounts. Drilled 5/16ths holes. Painted pedal mounts. Reinstalled master cylinder assemblies and connected pedals to cylinders using the appropriate hardware.


 
Mar 18, 2020     Parking brake control unit - (1.5 hours)       Category: Landing Gear
Located mounting plate below control mixer with Adel clamps. Mounted brake fluid flow control unit. Cut pull cable to length and installed.


 
Mar 17, 2020     Tailwheel - (1 hour)       Category: Landing Gear
Received Tundra Lite tailwheel in mail. Mounted it to Superstol tailwheel suspension by aligning and drilling for 1/4" securing bolts.


 
Feb 21, 2020     Tundra Lite Tailwheel Purchase       Category: Landing Gear
Ordered 8" SuperSTOL Tundra Lite Taillwheel from Pekola Enterprises- Jim Pekola $957+$Tax+$22 shipping.


 
Oct 24, 2019     Picked up Parts from Powder Coater - (1 hour) Category: Landing Gear
Picked up Matco Wheels after powder coating black.
 
Oct 15, 2019     Dissembled Matco Wheels for Powder Coating - (1 hour)       Category: Landing Gear
Split Matco Wheels to prepare for Powder Coating


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.