Project: BuckRV-8   -  
            Listing for Category : Fuselage
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Mar 24, 2024     Flap pushrod gap seals - (0.6 hour)       Category: Fuselage
Continued work on the flap rod boots:

1. Used a piece of see-through plastic to draw a template around the pushrod hole in the floorboard, then used this to cut a piece of 0.025" aluminum. This will be the retaining plate for the foam. The plate will be kept in place by one of the #8 floorboard screws and two other #6 screws/nuts.

2, Drilled the attach holes.

3. Cut out the pushrod hole and several other holes -- and I made sure it they had plenty of intentional ragged edges. (These rough edges will retain the foam under the plate.)

4. Cut the foam to shape.

5. Used a hot soldering iron to create the screw holes through the foam.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.