EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
MikeYRansS21
-
Listing for Category : controls
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (354)
Research
- (2)
Workshop
- (3)
Empennage
- (7)
Fuselage
- (102)
Firewall
Tail Feathers
- (12)
Wings
- (39)
Controls
- (6)
Avionics
- (19)
Lighting
Instrument Panel
- (5)
Landing Gear
- (3)
Engine
- (100)
Propeller
- (2)
Fuel System
- (3)
Interior Finish
- (26)
Paint / Decals
- (17)
Inspection
- (5)
Tools
Test run
- (3)
Builder Name:
Michael Yankaitis
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1400.5
Total Flight Time:
Start/Last Date:
Oct 14, 2019 - No Finish Date
Panel:
Apollo 80 GPS, GRT EFIS-AP
Friendly URL:
https://eaabuilderslog.org?s=MikeYRansS21
Home or Last Project Picture
Oct 26, 2022
Roll AP cable clamps, +
- (2 hours)
Category: Controls
Install and torque new AP Roll cable clamps. Re-fit top cowling with new foam spacer blocks in place. Baffle seals much better now.
IMG_4161.jpg
IMG_4162.jpg
Oct 25, 2022
AP servo cable clamps
- (3 hours)
Category: Controls
Machine new AP roll servo cable clamps out of steel, to replace the UHMW ones. A nice mill project.
Add foam blocks to upper cowl to block off large air gap on either side of flywheel near the top. 3 layers of glass to hold in place.
IMG_4127.jpg
IMG_4128.jpg
Jan 19, 2021
Misc
- (4 hours)
Category: Controls
Send 1 piece engine nose bearings back. Control stick boots on, finish fuel line standoffs, start on door latches
20210119_175810.jpg
20210119_175817.jpg
Jan 18, 2021
control stick throws
- (2 hours)
Category: Controls
Re-do elevator control stick throws. Move rod end bolt location. Make engine assembly jigs.
20210118_135506.jpg
20210118_170328.jpg
Jan 17, 2021
Control cables, 480 knob
- (5 hours)
Category: Controls
Replace concentric knob on 480. Modify knobs to fit. Test, all ok. Remove push pull cable sub panel and make provisions for install cables next to AFR gage. Install oil cooler shutter and parking brake cable.
20210117_101232.jpg
20210117_101703.jpg
20210117_101838.jpg
20210117_145244.jpg
20210117_145249.jpg
20210117_145307.jpg
Jun 16, 2020
Misc
- (6 hours)
Category: Controls
Finish pedals, control sticks, flap handle sup assembly. Add forward aileron cable and pulleys.
20200617_084411.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.