Project: MikeYRansS21   -  
            Listing for Category : interior finish
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Michael Yankaitis   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1400.5
Total Flight Time:
Start/Last Date:Oct 14, 2019 - No Finish Date
Panel:Apollo 80 GPS, GRT EFIS-AP
 
Friendly URL: https://eaabuilderslog.org?s=MikeYRansS21

Home or Last Project Picture

Nov 16, 2022     Door latches - (2 hours)       Category: Interior Finish
Dremel door latch stops so latch goes overcenter further. Add bungies to secure latches for test flights.


 
Oct 30, 2022     fire ext - (2.5 hours) Category: Interior Finish
Install fire extinguisher under engine controls.Ground run doing mag checks and 65% power LOP test. Emags fine, no go on LOP. Cowling gets warm/hot near turbo and exhaust. Order heat shield from Summit Racing.
 
Jan 04, 2021     Fresh air ducts - (1 hour)       Category: Interior Finish
Install fresh air ducts,


 
Jan 02, 2021     antenna wires- stick grips - (4 hours)       Category: Interior Finish
Run 3 antenna wires, Transponder, ADSB, Com. Wire in and install stick grips.


 
Jan 01, 2021     Main battery cables - (4 hours)       Category: Interior Finish
Run main battery wires, hold downs


 
Dec 31, 2020     Aluminum boxes - (5 hours)       Category: Interior Finish
Assemble and install main-Aux battery box and ELT mount. Master and cross tie on main battery box. Mount electric fuel pump.


 
Jul 26, 2020     Nut plates - (3 hours) Category: Interior Finish
Install nutplates on interior panels where #6 and #8 sheet metal screws will anchor.
 
Jul 14, 2020     Seat side closeouts - (2 hours) Category: Interior Finish
Fit seat side PVC closeouts. Re-do angle mount bracket
 
Jul 09, 2020     Doors - (2 hours)       Category: Interior Finish
Trim leading edges of doors to match with station #2 tubing.


 
Jul 08, 2020     Doors - (6 hours) Category: Interior Finish
Rivet glazing to door frames. Center aluminum channel VHB and riveted in place. Top trim riveted on.
 
Jul 07, 2020     doors - (3 hours) Category: Interior Finish
Silicone large glazing pieces to doors, inventory, modify and paint latch pieces.
 
Jul 06, 2020     Doors - (5 hours)       Category: Interior Finish
Glazing all fit to doors, trimmed, ready for riveting. Paint top inside and center outside channel trim strips.


 
Jul 05, 2020     Doors - (3 hours)       Category: Interior Finish
Fit lower and upper glazing on pilot side door.


 
Jul 04, 2020     Close outs, doors - (4 hours) Category: Interior Finish
Tweak station 3 close outs. Trim vertical side and add clamp angle. Start on doors. Inside top strip, outside trim strips fitted, drilled, clecoed.
 
Jul 02, 2020     Close outs - (3 hours) Category: Interior Finish
Work on Station 3 closeouts. Mostly done.
 
Jul 01, 2020     Close outs - (4 hours)       Category: Interior Finish
Fit interior closeouts fwd of seats.


 
Jun 30, 2020     Fairings - (5 hours)       Category: Interior Finish
Roll fuse on its side. Fit gear leg fairings. Install rivnuts in bottom skins for fairings.


 
Jun 29, 2020     Fuse interior - (8 hours)       Category: Interior Finish
Fit flap handle fairings. Fit station 3 closeouts. Fit strut fairings. File rivet heads on fuse,all. Install rest of the aileron pulleys in the fuse.


 
Jun 28, 2020     Boot - (5 hours)       Category: Interior Finish
Final rivet boot cowl top sides on.


 
Jun 26, 2020     Firewall - (6 hours) Category: Interior Finish
Silicone firewall under boot cowl top sides. Trim and fit tailwheel steering cable exit fairings. Nutplates on underside of fuselage at rear.
 
Jun 25, 2020     Dash - (4 hours) Category: Interior Finish
Cut dash for radio stack and vent outlets. Finish rivet and nut plate on radio stack mount.
 
Jun 22, 2020     Panels - (4 hours)       Category: Interior Finish
Fit panels aft and between seats. Work on dash supports. Fit, cleco, nut plate, and adel clamp radio stack support.


 
Jun 21, 2020     Baggage area - (3 hours) Category: Interior Finish
Fit forward baggage panels. Angles under lower sheet metal.
 
Jun 19, 2020     Seats - (4 hours)       Category: Interior Finish
Finish seats, complete.


 
Jun 18, 2020     Seats - (4 hours)       Category: Interior Finish
Finish seat frames, ready for upholstery.


 
Jun 17, 2020     Seats - (3 hours) Category: Interior Finish
Start on seat frames
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.