EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
MikeYRansS21
-
Listing for Category : tail feathers
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (354)
Research
- (2)
Workshop
- (3)
Empennage
- (7)
Fuselage
- (102)
Firewall
Tail Feathers
- (12)
Wings
- (39)
Controls
- (6)
Avionics
- (19)
Lighting
Instrument Panel
- (5)
Landing Gear
- (3)
Engine
- (100)
Propeller
- (2)
Fuel System
- (3)
Interior Finish
- (26)
Paint / Decals
- (17)
Inspection
- (5)
Tools
Test run
- (3)
Builder Name:
Michael Yankaitis
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1400.5
Total Flight Time:
Start/Last Date:
Oct 14, 2019 - No Finish Date
Panel:
Apollo 80 GPS, GRT EFIS-AP
Friendly URL:
https://eaabuilderslog.org?s=MikeYRansS21
Home or Last Project Picture
Jan 10, 2021
Elevator- Firewall fittings
- (6 hours)
Category: Tail Feathers
Install elevator. attach push rod. Adjust throws and install stops. Wire trim motor and calibrate efis display
20210111_173458.jpg
20210111_173616.jpg
Jan 09, 2021
Attach tail feathers
- (8 hours)
Category: Tail Feathers
Attach horizontal, vertical, and rudder. Rudder cables attached and adjusted. Run 3 more antenna wires, Nav, GPS, ELT.
20210109_113901.jpg
Aug 28, 2020
Paint H & S stab
- (2 hours)
Category: Tail Feathers
Paint horizontal and vertical stabilizer blue
20200828_112443.jpg
Aug 27, 2020
prep vert and horiz stab for paint
- (4 hours)
Category: Tail Feathers
Prepare horizontal and vertical stabilizer for paint. Hang in booth. Epoxy prime
20200827_115857.jpg
Apr 15, 2020
Finish Hstab
- (2 hours)
Category: Tail Feathers
Fit elevator, fit and rivet Hstab tips
20200415_094002.jpg
20200415_113909.jpg
Apr 14, 2020
Hstab work
- (6 hours)
Category: Tail Feathers
Make dimple dies, prep, cleco, finish rivet skins on hstab frame. All done except plastic tips.
20200414_120513.jpg
20200414_120525.jpg
20200414_143328.jpg
20200414_170530.jpg
Apr 13, 2020
Hstab work
- (2 hours)
Category: Tail Feathers
Match drill hstab skins to spars, debur. Remove all clecos.
20200405_093904.jpg
Apr 04, 2020
Hstab construction-Wing parts inventory
- (6 hours)
Category: Tail Feathers
Rivet Hstab frame, fit and cleco skins. Out of clecos. More on order.Inventory and move to shop most of wing components.
20200404_105925.jpg
20200405_093904.jpg
Mar 18, 2020
Finish Vert Stab, top, align rudder
- (4 hours)
Category: Tail Feathers
20200318_150059.jpg
Mar 17, 2020
Build Vert Stab, 80% done
- (6 hours)
Category: Tail Feathers
20200317_143439.jpg
Mar 16, 2020
Build Rudder, complete
- (3 hours)
Category: Tail Feathers
20200316_144513.jpg
Mar 15, 2020
Start on Rudder
- (2 hours)
Category: Tail Feathers
Organize Rudder, prime inside surfaces.
20200316_134929.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.