Project: NewtonRV-14A   -  
            Listing for Category : 15:rear wingspar
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Dustin Newton   -  
Project:   Vans - RV-14A
Total Hours:1178.7
Total Flight Time:
Start/Last Date:Apr 09, 2021 - No Finish Date
Engine:Lycoming IO-390-119EXP
Propeller:TBD
Panel:AFS/Dynon/Avidyne
 
Friendly URL: https://eaabuilderslog.org?s=NewtonRV-14A

Home or Last Project Picture

Dec 11, 2022     Rear Spar: riveting rear spar to main ribs - (0.5 hour) Category: 15:Rear WingSpar
 
Dec 10, 2022     Rear Spar: riveting rear spar to main ribs - (0.5 hour) Category: 15:Rear WingSpar
 
Nov 30, 2022     Rear Spar: Match drilling the main rib/rear spar holes. - (2.1 hours) Category: 15:Rear WingSpar
 
Nov 29, 2022     Rear Spar: cut pass through holes in doublers, cleco assy together - (2.0 hours)       Category: 15:Rear WingSpar
Used the dremmel to cut the pass through holes that I traced on the doublers. Worked out great! Clecod assy together and everything fit very well. Next step is to match drill the rear spar to the main ribs.


 
Nov 28, 2022     Rear Spar: Prepping rear spar doublers - (3.5 hours) Category: 15:Rear WingSpar
The rear spar doublers were originally backordered. So I am resuming the section at that step. Begin with drilling all of the holes to match the doublers and the rear spar.
 
Aug 06, 2022     Rear Wing Spar: begin prepping aileron hinge assy - (1.2 hours) Category: 15:Rear WingSpar
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.