EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
NewtonRV-14A
-
Listing for Category : 6: vert stab
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (478)
Research
Workshop
- (3)
Empennage
- (8)
6: Vert Stab
- (8)
7: Rudder
- (27)
8: HorizStab
- (15)
9: Elevator
- (42)
10:Rear Fuselage
11:Emp Attach
12: Emp Fairings
Wings
- (12)
13:Main WingSpar
- (14)
14: Wing Ribs
- (18)
15:Rear WingSpar
- (12)
16:Top Wing Skin
- (27)
17:Outbd LdgEdge
- (34)
18:Fuel Tank
- (60)
19:Wing Sys Rtg
- (9)
20:Bot Wing Skin
- (41)
21: Flap
- (22)
22:Aileron
- (20)
23:Aileron Act.
- (8)
24:Wing Tip
- (2)
38:Roll Trim
- (2)
57:AP Servos
- (3)
Fuselage
- (6)
Finishing Ki
- (1)
Firewall
Controls
Avionics
- (4)
Lighting
Instrument Panel
Landing Gear
Engine
- (1)
Propeller
- (2)
Fuel System
Interior Finish
Paint / Decals
- (4)
Inspection
Tools
- (26)
Records
- (3)
Auto Entry
Supplies
- (6)
Insurance
- (2)
Builder Name:
Dustin Newton
-
Project:
Vans - RV-14A
Total Hours:
1178.7
Total Flight Time:
Start/Last Date:
Apr 09, 2021 - No Finish Date
Engine:
Lycoming IO-390-119EXP
Propeller:
TBD
Panel:
AFS/Dynon/Avidyne
Friendly URL:
https://eaabuilderslog.org?s=NewtonRV-14A
Home or Last Project Picture
Oct 03, 2021
Cleco Vs structure and skin
- (7.5 hours)
Category: 6: Vert Stab
Began building! Completed the verticals stab structure and skin with clecos. Will resume with final size drilling etc. Even got Dutch out to install some Clecos!
29864FE0-9B4A-4B69-A36F-42873430EE85.jpeg
2EC4D85B-64F3-4E60-867D-4C36282C74A9.jpeg
B642C91B-BA04-4548-84DF-B4D9BEFCF95F.jpeg
939B78F1-254A-4CAD-BABD-E30CB4A20408.jpeg
Oct 04, 2021
Match drill the skin on the vertical stab
- (1.0 hour)
Category: 6: Vert Stab
Not much to see here. Just a boy and his drill.
Oct 06, 2021
Disassemble vstab and begin deburring
- (0.7 hour)
Category: 6: Vert Stab
Oct 06, 2021
Debur and Prime Vstab Structure Components
- (2.4 hours)
Category: 6: Vert Stab
AF26D5D9-1F0A-4EAB-874D-CFCABC66DE8F.jpeg
A82C95F6-7D95-4CC2-B9E5-89D8B13BAFD9.jpeg
Oct 07, 2021
Debur and Prime Vert Stab Skin
- (2.0 hours)
Category: 6: Vert Stab
4399CBA0-E5B2-49BC-BF7E-2922D229374B.jpeg
26CD3B37-97E6-4637-B08A-DB7943FABFD2.jpeg
Oct 08, 2021
Dimpled vstab skin and riveted vstab rear spar, doubler, and rudder hinge brackets
- (3.5 hours)
Category: 6: Vert Stab
Vans estimates 1,000 hours to build?!? Not this guy. Oh well I'm thoroughly enjoying the process so far.
4CDEEB1E-4274-46B5-899E-899DA615A9F5.jpeg
6876F99D-BE1A-4F41-9C92-754C076C034D.jpeg
4DE89111-18B6-4661-AF6A-DE6514C4454F.jpeg
4C28C41D-3BAD-4DBD-A923-049CE955FEDB.jpeg
Oct 09, 2021
Dimple the vstab skin and assembled the structure.
- (3.4 hours)
Category: 6: Vert Stab
Made the first flush rivet today! Had to think about it for 20 minutes. Haha
82555579-71A4-479C-8BBF-AFDE5D1847A1.jpeg
F40EB53D-3D66-45ED-8551-5A711DDD86EE.jpeg
85FE7F83-807F-4FB8-8B31-D934070316D6.jpeg
384D6F6E-6055-4847-AAF8-1F108488B3AE.jpeg
5CB9FCC3-2945-45D0-89C5-2E6394E05198.jpeg
5BD043C6-1C97-41CF-A755-6C6BF2BE7B90.jpeg
Oct 10, 2021
Complete Vstab (Section 6)
- (3.2 hours)
Category: 6: Vert Stab
7D5FCA5F-7713-4BA4-A61B-2683DC5E5637.jpeg
F684BD6B-6697-4B64-9DEC-0C144818ADBF.jpeg
5FB1560D-9764-4373-81B5-D009BB91AECD.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.