Project: NewtonRV-14A   -  
            Listing for Category : 23:aileron act.
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Dustin Newton   -  
Project:   Vans - RV-14A
Total Hours:1178.7
Total Flight Time:
Start/Last Date:Apr 09, 2021 - No Finish Date
Engine:Lycoming IO-390-119EXP
Propeller:TBD
Panel:AFS/Dynon/Avidyne
 
Friendly URL: https://eaabuilderslog.org?s=NewtonRV-14A

Home or Last Project Picture

Jun 16, 2023     Aileron Act.: Finish connecting and adjusting main push/pull tubes - (2.3 hours) Category: 23:Aileron Act.
This procedure entailed using a "neutral" template and measuring to make sure the length of the main push/pull tube is correct. Through adjustments I was able to adjust it to +/- 1mm.
 
Jun 11, 2023     Aileron Act.: rivet push/pull tubes, begin fitting right wing actuation assy - (2.4 hours) Category: 23:Aileron Act.
 
Jun 10, 2023     Aileron Act: finish installing torque tube assy - (2.3 hours)       Category: 23:Aileron Act.


 
Jun 03, 2023     Aileron Act: build aileron torque tube assemblies - (5.6 hours)       Category: 23:Aileron Act.
Completed torque tube assemblies except for final washer and nuts. There is missing hardware that needed to be ordered to completed installation.


 
May 29, 2023     Aileron Act.: Begin building torque tubes - (4.0 hours) Category: 23:Aileron Act.
 
May 28, 2023     Aileron Act: Build aileron push rods - (3.5 hours) Category: 23:Aileron Act.
Was able to complete them except for final riveting. The rivets from Van's were incorrect so I ordered the right ones.
 
May 21, 2023     Aileron Act: Cut, Prep, and Prime Aileron Torque Tubes - (3.0 hours) Category: 23:Aileron Act.
 