Project: Duckie   -  
            Listing for Category : fuel system
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Robert Schmid   -  
Project:   Quickie - Q2   -   VIEW REPORTS
Total Hours:1219
Start/Last Date:Apr 29, 2022 - Aug 31, 2023
Engine:O-200
Propeller:Catto
Panel:Falken Avionics, Uavionics AV-30, BendixKing AP, iPads
 
Friendly URL: https://eaabuilderslog.org?s=Duckie

Home or Last Project Picture

Jun 06, 2023     Calibrated fuel sensors - (8 hours) Category: Fuel System
Found main fuel sendor to be not calibrated
Removed sender from tank, rebent slightly to point AFT, not sideways
Calibrated on bench with Westach instructions for manual calibration
Reinstalled sender
Calibrated main sender with V values ... Good values up to 12 gallons
Calibrated header sender ... Good values all the way to 5 gallons, room for one more gallon most likely
 
Nov 16, 2022     Fix soft spot on passenger side - (16 hours)       Category: Fuel System
Cut top open and clean
Fit in new foam
Flox in foam
Triple BID
Prime over


 
Nov 07, 2022     Installed fuel lines - (4 hours)       Category: Fuel System
Pickup to pump with flex
Pump to firewall with hard
Firewall to return in header with hard


 
Oct 14, 2022     Installed bottom tap - (1 hour)       Category: Fuel System
Had to use a step because turns out fitting is smaller than ACS said, might get a larger one eventually


 
Sep 29, 2022     Closing main fuel tank - (40 hours)       Category: Fuel System
Drill 1 1/2 hole for main tank fill
Bend 1 1/2 PVC pipe to fit
Flox in PVC from header to main
Drill fuel pickup from main
Bend to fit and flox fuel pickup line
Sand & prep border surfaces
Flox in inside skin
Slurry foam
Glue in foam with flox
Slurry outside of foam ... after once forgetting and having to redo :-)
Apply 3 layers of BID on outside
Apply micro & sand ... 3 times to get nice and flat
Flip plane over on its wheels


 
Sep 18, 2022     Fiberglassed in header fitting - (3 hours)       Category: Fuel System
Cut aluminum piece
Fiberglassed into header tank
Cut fill hole into fiberglass tank


 
Jul 28, 2022     Molded new bottom main tank skin, inside fuselage - (4 hours)       Category: Fuel System
Borrowed fuselage from Stan
Laid down 3 layers of BID plus peel ply on duct tape


 
Jul 27, 2022     Cut out old fuel filler box & pipe - (2 hours)       Category: Fuel System
Cut out box from outside
Cut off lid and grind down piano hinge
Epoxied door back into place with 1 BID in back ... fixed air bubbles in peel ply after taking picture :-)


 
Jul 23, 2022     Designed new fuel system - (4 hours)       Category: Fuel System
Looked at what's needed for fuel injection
Realized I didn't need a gravity fed header tank feed
Redesigned it with fuel coming out of main tank
Discussed with various folks
Decided to eliminate facet pump and 2 extra fittings
Problem of how to fit low point outlet and fill intake by fuel tank leak / redo


 
Jul 14, 2022     Floxed in header tank donut - (2 hours)       Category: Fuel System
Couldn't bend return tube, made a wooden piece to press the donut in
Applied epoxy inside, then flox, then donut, then BID, then peel ply


 
Jul 08, 2022     Installed main tank fuel sender - (4 hours)       Category: Fuel System
Cut hole with two different hole saws
Cleaned hole and sanded prep
Fluxed donut into place
Put down a layer of BID sounds outside
Cut hole for header tank ... Fuel return in the way:-(


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.