Project: Duckie   -  
            Listing for Category : interior finish
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Robert Schmid   -  
Project:   Quickie - Q2   -   VIEW REPORTS
Total Hours:1219
Start/Last Date:Apr 29, 2022 - Aug 31, 2023
Engine:O-200
Propeller:Catto
Panel:Falken Avionics, Uavionics AV-30, BendixKing AP, iPads
 
Friendly URL: https://eaabuilderslog.org?s=Duckie

Home or Last Project Picture

Jun 02, 2023     Installed air vent - (3 hours)       Category: Interior Finish
Connected flex hose to NACA vents on each side ... PIA placing and stuff in the way
Drilled and floxed in carbon tube to NACA vent for iPad mount air
Connected silicon hose from NACA vent carbon tube to iPad mounts


 
May 27, 2023     Polished canopy glass - (8 hours)       Category: Interior Finish
What a PIA
Used sanding system from ACS first
Then used polisher from Harbor Freight with other #3 and #2 polish out of bottle


 
May 06, 2023     Installed canopy gas strut - (4 hours)       Category: Interior Finish
Floxed in 2 attachment points that don't interfere with carbon bar across
Went with 40lbs force strut from Amazon


 
Apr 23, 2023     Installed seat belts - (6 hours)       Category: Interior Finish
What a PIA but after cutting extra access hole in center console installed and bolted in all seat belt fittings
Ken bent outboard connectors for me
I cut them down and drilled smaller 1/4 hole to fit existing attachment points


 
Nov 16, 2022     Made glare shield - (16 hours)       Category: Interior Finish
Cut from G10
Mounted with clicos and then flush screws
Hard work to get to fit to panel top
Made tabs


 
Oct 15, 2022     Installed arm rest hinge - (2 hours)       Category: Interior Finish


 