EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Duckie
-
Listing for Category : fuselage
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (188)
Research
Workshop
- (2)
Empennage
- (2)
Fuselage
- (18)
Firewall
- (7)
Tail Feathers
Wings
- (2)
Controls
- (27)
Avionics
- (21)
Lighting
- (2)
Instrument Panel
- (11)
Landing Gear
- (12)
Engine
- (40)
Propeller
- (6)
Fuel System
- (11)
Interior Finish
- (7)
Paint / Decals
- (10)
Inspection
- (10)
Tools
Builder Name:
Robert Schmid
-
Project:
Quickie - Q2
-
VIEW REPORTS
Total Hours:
1219
Start/Last Date:
Apr 29, 2022 - Aug 31, 2023
Engine:
O-200
Propeller:
Catto
Panel:
Falken Avionics, Uavionics AV-30, BendixKing AP, iPads
Friendly URL:
https://eaabuilderslog.org?s=Duckie
Home or Last Project Picture
Apr 27, 2023
Installed canopy lock & safety mechanism
- (4 hours)
Category: Fuselage
Used stock design, made CAD drawings and had it cut at Xometry.com
IMG_1246.jpg
Apr 15, 2023
Designed canopy locking mechanism in OnShape
- (2 hours)
Category: Fuselage
Took drawings from plans and converted into OnShape CAD ...
https://cad.onshape.com/documents/6fe5f2054c0e0da1003c819e/w/532922969c01a880328d39e8/e/0591008fdf0827bafab3f3cf
Ordered parts from xometry.com
Latch Mechanism Drawing.png
Mar 26, 2023
Installed Canopy Hinge
- (8 hours)
Category: Fuselage
Fit, drilled and mounted bottom hinge on fuselage, needed some Dremel work to make space for nuts
Fit, drilled and mounted canopy hinge with some play
Then floxed in canopy nuts and took out play ... what a PIA :-)
Canopy Hinge.jpg
Oct 01, 2022
Applied 2 extra layers of BID in tail
- (4 hours)
Category: Fuselage
Added 2 layers of BID in tail for structural support, per Jim P and Jason S
PXL_20221001_201815127.jpg
PXL_20221001_201821716.jpg
PXL_20221002_182535983.jpg
Jul 26, 2022
Cut bottom open for future work
- (2 hours)
Category: Fuselage
After talking with Jason, decided to cut bottom open
PXL_20220726_213420801.jpg
Jul 23, 2022
Investigated warped floor under fuel tank
- (8 hours)
Category: Fuselage
Found warped floor under tank
Consulted with Jason Skiby and decided to cut bottom open
Took off engine
Installed engine mount bracket
Flipped plane
Cut bottom skin
Removed fuel soaked foam
Pressure tested tank and found many pin holes in skin
Cut openings to look at fabric --> not enough wetted
PXL_20220717_225315760.jpg
PXL_20220723_214339918.jpg
PXL_20220723_220927867.jpg
PXL_20220723_222615205.jpg
PXL_20220723_224444871.jpg
PXL_20220723_234226892.jpg
Jul 13, 2022
Repaired all aileron fairings
- (4 hours)
Category: Fuselage
Left inboard aileron fairings were cracked, on both main fuselage and tail portion
Filled inside with micro, after wetting foam with epoxy
Sanded down the fairing to give more clearance to aileron avoid future cracking
PXL_20220712_194835107.jpg
PXL_20220713_174755303.jpg
Jul 08, 2022
Created arm rest opening
- (4 hours)
Category: Fuselage
Cut hole
Removed t tail mechanism
One layer of BID on backside
Filled gaps with micro
PXL_20220709_001604728.jpg
PXL_20220709_001528868.jpg
PXL_20220708_203558522.jpg
PXL_20220708_203613482.jpg
Jun 25, 2022
Assembled rudder pedals
- (3 hours)
Category: Fuselage
Cleaned pedals, removed all rust
Assembled parts
Primed with Zinc
Test fit length
PXL_20220626_015535268.jpg
Jun 25, 2022
Primed interior
- (8 hours)
Category: Fuselage
Sanded, cleaned and then primed interior areas, including foot well and luggage compartments
PXL_20220626_011549027.jpg
PXL_20220620_214106874.jpg
PXL_20220626_011611588.jpg
Jun 21, 2022
Cleaned, sanded & primed inside cockpit
Category: Fuselage
Cleaned & sanded inside cockpit
Primed with West Marine Petite Epoxy Primer
Need to finish baggage compartment & footwell
PXL_20220620_214106874.jpg
Jun 16, 2022
Test fitted engine mounts
- (4 hours)
Category: Fuselage
Hung engine in front of engine, needed alternator hole
Hung engine again, needed more clearance on all holes
Location of engine mounts was perfect
PXL_20220617_022633877.jpg
PXL_20220617_022812449.jpg
PXL_20220617_022822415.jpg
PXL_20220617_023026162.jpg
PXL_20220617_023032035.jpg
Jun 17, 2022
Trimmed firewall more
- (2 hours)
Category: Fuselage
Needed extra hole for alternator
Needed more clearance for starter
PXL_20220617_032146957.jpg
Jun 17, 2022
Made baggage hole covers
- (4 hours)
Category: Fuselage
2 BIDs each side
Foam inbetween
Trimmed to fit
PXL_20220616_201134330.jpg
PXL_20220617_174020571.jpg
Jun 14, 2022
Microed canopy seam
- (1 hour)
Category: Fuselage
Applied micro over foam seam on canopy
PXL_20220606_222420569.jpg
Jun 14, 2022
Installed baggage tray lip
- (3 hours)
Category: Fuselage
5min epoxied in lip from foam
Applied micro on front and behind to make round
Applied BID all around
PXL_20220616_201116470.jpg
Jun 13, 2022
Remounted tail section
- (2 hours)
Category: Fuselage
Removed old screws
Cleaned & sanded seam
Installed new washers & screws
PXL_20220613_171602565.jpg
PXL_20220613_193829557.jpg
Jun 06, 2022
Fiberglass Day
- (10 hours)
Category: Fuselage
Cut off tail tbar attachment
Cut & fiberglassed baggage tray hole
Cut canopy backwall
Made left arm rest fiberglass cover
Cut starter hole in firewall
Floxed shut old holes
... all with the help of Jason Skirby, Mr Fiberglass Jr
PXL_20220606_192118201.jpg
PXL_20220606_222408324.jpg
PXL_20220606_222416885.jpg
PXL_20220606_222420569.jpg
PXL_20220607_002532467.jpg
PXL_20220607_002540909.jpg
PXL_20220607_002558138.jpg