Project: ToddsCH650B   -  
            Listing for Category : Show all entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Todd Osborne   -  
Project:   Zenair - CH 650 B   -   VIEW REPORTS
Total Hours:231
Start/Last Date:Nov 18, 2017 - Dec 20, 2020
Engine:Corvair
Propeller:TBD
Panel:GlassPack (Custom)
 
Friendly URL: https://eaabuilderslog.org?s=ToddsCH650B

Home or Last Project Picture

Dec 27, 2020     Kit Sold - (2 hours) Category: None
I have sold the kit to a gentleman from NY. I have decided to build a CH750 Cruzer instead and will create a new project for that kit once it arrives.
 
Oct 27, 2019     Reassemble - (3 hours)       Category: CabinFloor
Reassemble and rivet cabin floor components


 
Oct 26, 2019     Disassemble, Debur, Prime and Paint - (2 hours) Category: CabinFloor
Disassemble, debur, and prime. Debur cabin floor and paint everything except rudder pedals (previously done).
 
Oct 23, 2019     Final Hole Drilling - (1 hour) Category: CabinFloor
Final size drilling members to cabin floor
 
Oct 16, 2019     Rudder Pedals - (1 hour) Category: CabinFloor
Final drill and prime rudder pedals and hinges
 
Oct 12, 2019     Started - (4 hours) Category: CabinFloor
Fit center support channel and shape extrusions for cabin floor. Fit and drill front lower longerons. Install rudder pedals. Install master cylinder attachment brackets (4). Installing hinges for brake pedals.
 
Oct 11, 2019     Started - (1 hour) Category: CabinFloor
Fitted heel and pedal bearing supports to cabin floor
 
Oct 08, 2019     Priming - (1 hour) Category: RearFuselage
Rivet cross-members and uprights. Cleanup before final priming. Primed.
 
Oct 07, 2019     Reassemble - (1 hour) Category: RearFuselage
Priming cross-members and uprights. Started re-installing members. Missed primer on plate and had to do-over.
 
Oct 06, 2019     Disassembly - (1 hour) Category: RearFuselage
Disassembly and deburring of forward uprights and cross-members
 
Mar 17, 2019     L's - (6 hours)       Category: RearFuselage
Drilled upper cross member, installed new baggage floor supports, and rear and middle bulkheads. Fit and drilled final diagonal L's, and final drilled cross members.


 
Mar 16, 2019     Main Gear Channel - (6 hours) Category: RearFuselage
Fit and drilled main gear channel, seat back, and center channel. Drilled uprights on center section. Started removing and replacing baggage floor L that I should not have installed previously.
 
Mar 15, 2019     Fairleads - (2 hours) Category: RearFuselage
Cut new rudder cable fairleads (drawings were wrong and slot was in wrong place). Installed rudder cable covers and fairleads.
 
Mar 10, 2019     Rudder Cable Fairings - (2 hours) Category: RearFuselage
Cut and drilled rudder cable fairings. Needs cleanup, priming, and final riveting.
 
Feb 24, 2019     Reassemble - (4 hours) Category: RearFuselage
Cleanup parts and prime them. Reassemble and rivet aft diagonals, top plate, and longerons. Installed upper rudder horn and horizontal tail brackets. Final drilled and rivet side skin to top longerons from horizontal tail mounts to rear of plane. Drilled and installed flush rivets to hold longerons to side skins.
 
Feb 23, 2019     Longerons - (3 hours) Category: RearFuselage
Refit new upper longerons and top plate that I screwed up a while back. Still had a problem with figure-8 hole in top of aft horizontal tail frame. I cut a piece of the old longeron and made a doubler to fit under that and opened up the holes to A5 instead of A4.
 
Feb 23, 2019     Corrected Mistake - (2 hours) Category: RearFuselage
Replaced diagonal L's between horizontal tail frames. I installed it according to one page in the plans, with the flange down, and another drawing and the manual said the flange should be up. The new ones fit better anyway.
 
Feb 03, 2019     Started - (3 hours) Category: RearFuselage
Started installing top panel between upper longerons. Drilled a hole where it should not be, too close to the bolt hole for the upper rudder hinge. Have to replace it. Installed horizontal tail mounts and finished final drilling what I could on the top plate.
 
Feb 02, 2019     Final Assembly - (5 hours)       Category: RtRrFuseSide
Remove, debur, and prime L's. Debur and prime side skin. Final assembly and riveting.


 
Jan 29, 2019     Drilling - (1 hour) Category: RtRrFuseSide
Pilot and final drilling side to bottom frame
 
Jan 27, 2019     Panel Positioning - (1 hour)       Category: RtRrFuseSide
Started positioning panel on lower fuselage


 
Jan 27, 2019     Drilling - (1 hour) Category: RtRrFuseSide
Final-size hole drilling on L's
 
Jan 27, 2019     Reassemble - (2 hours) Category: LtRrFuseSide
Reassemble and cleco to lower fuselage. Riveted.
 
Jan 26, 2019     Disassemble, Debur, and Prime - (3 hours) Category: LtRrFuseSide
 
Jan 26, 2019     Corrected Mistake - (1 hour) Category: RearLowrFuse
Finished installing new lower rudder horns
 
Jan 26, 2019     Corrected Mistake - (2 hours) Category: RearLowrFuse
Installed new lower rudder horns
 
Jan 23, 2019     Final Hole Drilling - (1 hour) Category: LtRrFuseSide
 
Jan 22, 2019     Longerons - (2 hours) Category: LtRrFuseSide
Pilot drilling skin to lower longeron
 
Jan 21, 2019     L's - (3 hours)       Category: LtRrFuseSide
Fitting diagonal L's. Pilot drilling L's.


 
Jan 20, 2019     L's - (4 hours) Category: LtRrFuseSide
Pilot drilling upright L's
 
Jan 20, 2019     L's - (1 hour)       Category: RtRrFuseSide
Pilot drilling L's


 
Jan 19, 2019     Priming - (1 hour)       Category: RearLowrFuse
Spray Nason 491-40 Primer


 
Jan 19, 2019     Started - (5 hours) Category: RtRrFuseSide
Installing and pilot drilling L's
 
Jan 18, 2019     Completed - (3 hours)       Category: Firewall
Install lower section, including sliders, replaced upper doubler, sprayed Nason primer, reassembled, riveted, and bolted bearing


 
Jan 17, 2019     Started - (2 hours) Category: Firewall
Countersinking holes for firewall lower support, hand riveting parts that could not be done with pneumatic riveter, trimming sliders
 
Jan 14, 2019     Corrected Mistake - (2 hours) Category: RearLowrFuse
Replaced Z on left side of access panel, which was damaged while drilling the holes for the panel screws. I had to cut another and move it about 2-3mm outboard so that there was room for the nutplates without hitting the upright/bend in the Z. This left the rivet holes a bit close to the edge nearest the cutout. To correct this, I installed several new rivets along the real centerline of the new Z, spaced evenly between the existing holes, avoiding interference with the nutplates. Installed and riveted the nutplates.
 
Jan 13, 2019     Final Assembly - (6 hours)       Category: RearLowrFuse
Spray Zinc Phosphate. Final assembly and riveting.


 
Jan 12, 2019     Disassembly - (7 hours) Category: RearLowrFuse
Disassemble, debur, AlumiPrep and Alodine
 
Jan 11, 2019     Final Hole Drilling - (2 hours) Category: RearLowrFuse
 
Jan 10, 2019     Z's - (1 hour) Category: RearLowrFuse
Z's, Hinge, and Access door fitting, filing, and drilling
 
Jan 09, 2019     Lower Rudder Hinge - (2 hours) Category: RearLowrFuse
Lower rudder hinge and tie down ring. Not happy with hole alignment between upper and lower horn. Ordered replacements.
 
Jan 07, 2019     Longerons - (4 hours)       Category: RearLowrFuse
Longeron fit and pilot drilling, including shim, doubler, etc. Trimming Stiffeners after installing longerons.


 
Jan 06, 2019     Z's - (3 hours) Category: RearLowrFuse
Fitting, trimming and drilling Z's
 
Jan 05, 2019     Assembly - (4 hours)       Category: RearLowrFuse
Cut fairlead material, drilled horizontal tail frame, cleanup in preparation for bottom skin to take up whole table. Laying out and drilling L's, Z's, etc.


 
Jan 04, 2019     Started - (1 hour) Category: RearLowrFuse
Started rear horizontal tail frame. May have messed up 6B-1-5, may have to replace.
 
Jan 04, 2019     Assembly - (3 hours)       Category: Firewall
Assembly and riveting. Need to order hand riveter to get into tight spots, and still waiting for replacement doubler.


 
Jan 03, 2019     Assembly - (4 hours)       Category: Firewall
Final drilling and fitting and sticker removal. Deburring components, all but firewall steel itself. AlumiPrep and Alodine. Spray Zinc Phosphate. Deburring main firewall metal.


 
Jan 02, 2019     Assembly - (3 hours)       Category: Firewall
Drilled and fit back stiffeners. Drilled and fit center stiffeners, disassembled. Almost ready for deburring and corrosion protection.


 
Jan 01, 2019     Started - (4 hours)       Category: Firewall
Started drilling bottom and top stiffeners. Top stiffener and doubler. Completed drilling of side stiffeners.


 
Dec 25, 2018     Completed - (5 hours) Category: RightAileron
Final drilling and disassembly. Deburring. AlumiPrep and Alodine, and Zinc Phosphate primer. Completed priming and final assembly.
 
Dec 21, 2018     Assembly - (4 hours) Category: RightAileron
Started "B" model updates, including fitting and drilling gussets, drilling holes for new ribs, and started laying out mass balanced aileron rods. Drilled mass balance rod. Almost complete final hole drilling. Still needs the man rivet line.
 
Dec 20, 2018     Started - (2 hours) Category: RightAileron
Pilot drilled ribs to skin and drilled horn attachment
 
Dec 20, 2018     Final Assembly - (2 hours) Category: LeftAileron
Final assembly and riveting
 
Dec 19, 2018     Drilling and Priming - (3 hours)       Category: LeftAileron
Final drilled all holes. Disassemble, debur, and clean. AlumiPrep and Alodine, and Zinc Phosphate primer.


 
Dec 18, 2018     Assembly - (5 hours)       Category: LeftAileron
Started "B" model updates, including fitting and drilling gussets, drilling holes for new ribs, and started laying out mass balanced aileron rods. Pilot drilled balance aileron rod to ribs. Started installing inside skin. Finished pilot drilling balance arm ribs and riveted horn.


 
Dec 17, 2018     Started - (2 hours) Category: LeftAileron
Drilling and shaping horns for both ailerons. Pilot drill ribs, tip, and main rivet line. This is what used to be a complete aileron, less the horn, but is now superseded by the "B" modifications that include 2 extra ribs, balance shaft and weights, and 2 gussets. Those will be installed next.
 
Dec 15, 2018     Final Assembly - (4 hours) Category: LeftWingFlap
Final drilling, deburring, AlumiPrep and Alodine, and Zinc Phosphate. Final assembly and riveting.
 
Dec 13, 2018     Pilot Drilled and Fit Hinge - (1 hour) Category: LeftWingFlap
 
Dec 12, 2018     Pilot Drilled Ribs to Skin - (1 hour) Category: LeftWingFlap
 
Dec 11, 2018     Final Assembly - (2 hours) Category: RghtWingFlap
 
Dec 10, 2018     Priming - (1 hour)       Category: RghtWingFlap
Alumiprep 33 and Alodine 1201 and Zinc Phosphate


 
Dec 08, 2018     Assembly - (5 hours) Category: RghtWingFlap
Pilot drilled and cleco'd ribs to skin, installed hinge, final drilled everything, disassembled and deburred
 
Dec 06, 2018     Drill Ribs - (2 hours) Category: RghtWingFlap
Measured, drilled, and cut nylon control plates and layed out and drilled ribs
 
Jul 13, 2018     Corvair Teardown - (1 hour) Category: Engine
 
Jul 12, 2018     Corvair Teardown - (2 hours)       Category: Engine


 
Jul 11, 2018     Corvair Teardown - (2 hours) Category: Engine
 
Jul 06, 2018     Corvair Teardown - (2 hours) Category: Engine
Completed teardown, started cleaning
 
Jun 24, 2018     Completed - (3 hours)       Category: Rudder
Installed new nose skin and top rib, plus AlumiPrep, Alodine, and Zinc Phosphate


 
Jun 16, 2018     Corrected Mistake - (1 hour) Category: Rudder
Removed nose skin to replace and add tip bracket
 
Jun 16, 2018     Final Assembly - (6 hours)       Category: Elevator
Final assembly and electric trim servo install


 
Jun 14, 2018     AlumiPrep and Alodine - (1 hour) Category: Elevator
 
Jun 14, 2018     Breakdown and Cleaning - (1 hour) Category: Elevator
 
Jun 13, 2018     Installed L's - (1 hour) Category: Elevator
Cut and drilled L's on top and bottom around horns
 
Jun 12, 2018     Corrected Mistake - (1 hour) Category: Elevator
Corrected horn doubler (Replaced)
 
May 27, 2018     Fitting Parts - (1 hour) Category: Elevator
 
May 19, 2018     Started Horn - (5 hours) Category: Elevator
Completed stabilizer side of hinge, started elevator horn installation
 
May 06, 2018     Started Assembly - (4 hours)       Category: Elevator
Elevator assembly, trim tab hinge, started hinge with stabilizer


 
May 01, 2018     Riveted Top Skin - (1 hour)       Category: H-Stabilizer


 
Apr 30, 2018     Rivet Top Skin - (2 hours)       Category: H-Stabilizer


 
Apr 29, 2018     Assembly - (2 hours) Category: H-Stabilizer
Test assembly, primed with Zinc Phosphate and rivet spars
 
Apr 29, 2018     Priming - (2 hours)       Category: H-Stabilizer
Alumiprep 33 and Alodine 1201


 
Apr 28, 2018     Deburring and Cleanup - (1 hour) Category: H-Stabilizer
 
Apr 26, 2018     Final Drilling - (1 hour) Category: H-Stabilizer
Breakdown and final drilling. Ready for priming and assembly.
 
Apr 25, 2018     Fitting and Drilling Fiberglass Tips - (2 hours) Category: H-Stabilizer
 
Apr 24, 2018     Hinge Fitting - (1 hour) Category: H-Stabilizer
 
Apr 22, 2018     Skin fitting - (1 hour) Category: H-Stabilizer
 
Apr 22, 2018     Skeleton Assembly - (2 hours)       Category: H-Stabilizer


 
Mar 04, 2018     Deburring - (1 hour) Category: Rudder
Deburring and prep for final assembly
 
Feb 25, 2018     Started nose skin - (3 hours) Category: Rudder
Finished drilling skeleton, fit and drilled nose skin
 
Dec 02, 2017     Assembly - (6 hours)       Category: Rudder
Alumiprep 33 and Alodine 1201 rudder skeleton. Riveted skeleton. Almost done skinning one side.


 
NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.