Project: ToddsCH650B   -  
            Listing for Category : rearlowrfuse
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Todd Osborne   -  
Project:   Zenair - CH 650 B   -   VIEW REPORTS
Total Hours:231
Start/Last Date:Nov 18, 2017 - Dec 20, 2020
Engine:Corvair
Propeller:TBD
Panel:GlassPack (Custom)
 
Friendly URL: https://eaabuilderslog.org?s=ToddsCH650B

Home or Last Project Picture

Jan 26, 2019     Corrected Mistake - (1 hour) Category: RearLowrFuse
Finished installing new lower rudder horns
 
Jan 26, 2019     Corrected Mistake - (2 hours) Category: RearLowrFuse
Installed new lower rudder horns
 
Jan 19, 2019     Priming - (1 hour)       Category: RearLowrFuse
Spray Nason 491-40 Primer


 
Jan 14, 2019     Corrected Mistake - (2 hours) Category: RearLowrFuse
Replaced Z on left side of access panel, which was damaged while drilling the holes for the panel screws. I had to cut another and move it about 2-3mm outboard so that there was room for the nutplates without hitting the upright/bend in the Z. This left the rivet holes a bit close to the edge nearest the cutout. To correct this, I installed several new rivets along the real centerline of the new Z, spaced evenly between the existing holes, avoiding interference with the nutplates. Installed and riveted the nutplates.
 
Jan 13, 2019     Final Assembly - (6 hours)       Category: RearLowrFuse
Spray Zinc Phosphate. Final assembly and riveting.


 
Jan 12, 2019     Disassembly - (7 hours) Category: RearLowrFuse
Disassemble, debur, AlumiPrep and Alodine
 
Jan 11, 2019     Final Hole Drilling - (2 hours) Category: RearLowrFuse
 
Jan 10, 2019     Z's - (1 hour) Category: RearLowrFuse
Z's, Hinge, and Access door fitting, filing, and drilling
 
Jan 09, 2019     Lower Rudder Hinge - (2 hours) Category: RearLowrFuse
Lower rudder hinge and tie down ring. Not happy with hole alignment between upper and lower horn. Ordered replacements.
 
Jan 07, 2019     Longerons - (4 hours)       Category: RearLowrFuse
Longeron fit and pilot drilling, including shim, doubler, etc. Trimming Stiffeners after installing longerons.


 
Jan 06, 2019     Z's - (3 hours) Category: RearLowrFuse
Fitting, trimming and drilling Z's
 
Jan 05, 2019     Assembly - (4 hours)       Category: RearLowrFuse
Cut fairlead material, drilled horizontal tail frame, cleanup in preparation for bottom skin to take up whole table. Laying out and drilling L's, Z's, etc.


 
Jan 04, 2019     Started - (1 hour) Category: RearLowrFuse
Started rear horizontal tail frame. May have messed up 6B-1-5, may have to replace.
 